PLOT ZONE V (1B)

UPRERARegistered

PLOT ZONE V (1B) is a RERA-registered residential project by M/s Uttam Steels & Associates { Consortium) throug in Gautam Budh Nagar (RERA ID UPRERAPRJ10825). Registered with a completion deadline of 14 Feb 2026. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ10825
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryBulandsahar Development Authority
Proposed start16 Aug 2017
Original start16 Dec 2016
Project duration102 months
AddressDadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant address115 Ansal Bhawan, 16 KG Marg, New Delhi-110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    9571/BDA/2016-17

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion15 Aug 2025
Revised completion14 Feb 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹9,67,000
Sanctioning authorityBulandsahar Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
In House
License CA/92/15029
115, Ansal Bhawan, 16, K.G. Marg, New Delhi-110001
Engineer
SPACE COMBINE
A1/112 SAFDARJUNG ENCLAVE DELHI
Contractor
Sana Enterprises
G-59, Alpha -II , G. Noida, GB Nagar
Sr.Development work declared to RERA
1Demarcation of Plots
yes as per layout plan
2Boundary Wall
yes with brick walls/MS railings
3Road Work
yes with WMM/blacktop surfacing
4Footpaths
yes with CC tiles/interlocking tiles/pavers
5Water Supply Including Drinking Water Facilities
yes with DI/GI lines/Overhead tank
6Sewer System
yes with RC pipes/brick manholes
7Drain
yes with RC pipes/brick manholes
8Parks
yes as per norms/byelaws/masterplan
9Tree Planting
yes along kerbs/footpaths/green areas
10Design For Electric Supply Including Street Lighting
yes as per norms/byelaws
11Community Buildings
yes as per norms/byelaws/masterplan
12Treatment and Disposal System of Sewage and Sullage water
yes with sewage treatment plant
13Solid Waste Management And Disposal System
yes for horticulture works
14Water Conservation System
yes with rain water harvesting system
15Energy Management System Including Use of Renewable Energy
yes as per norms/byelaws
16Fire Protection And Fire Safety System
yes as per norms/byelaws
17Social Infrastructure And Other Public Amenities Including Public Health Services
yes as per norms/byelaws/masterplan
18Emergency Evacuation Services
yes as per norms/byelaws/masterplan
19Other Miscellaneous Work
finishing/development work as per specifications
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

5 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ADVENTURES ENTERPRISES PVT LTDUPRERAAGT11208
2BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
3RAJ NANDINI ESTATES PRIVATE LIMITEDUPRERAAGT10793
4SANJAY KUMAR SIROHI C/O SIROHI ESTATESUPRERAAGT12885
5VELOCITY PROPBUILD PRIVATE LIMITEDUPRERAAGT13273
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 15 Dec 2021.

Sanctioned by Bulandsahar Development Authority · 1,92,386 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
9571/BDA/2016-1716 Dec 201615 Dec 202115 Aug 202515 Aug 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 14 Feb 2026.

#Granted fromExtended uptoNote
115 Aug 202514 Feb 2026Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

78 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
23,275565—
21K1687Khasra
231265Khasra
24422Khasra
274300Khasra
28KA10120Khasra
28KHA950Khasra
28KHA821Khasra
304903Khasra
30M676Khasra
321130Khasra
392013Khasra
403850Khasra
43960Khasra
447480Khasra
4510414Khasra
1184216Khasra
122960Khasra
124M2530Khasra
1251265Khasra
144K1202Khasra
144GHA1012Khasra
1457462Khasra
145KHA3032Khasra
15260Khasra
1543166Khasra
156632Khasra
4121127Khasra
415M8452Khasra
41921420Khasra
4287340Khasra
4331096Khasra
4341096Khasra
4352960Khasra
4373489Khasra
4407256Khasra
4433243Khasra
221900Khasra
29530Khasra
331170Khasra
36680Khasra
37250Khasra
381740Khasra
4180Khasra
4240Khasra
4710Khasra
4810Khasra
115590Khasra
119320Khasra
1423730Khasra
1461530Khasra
1531330Khasra
157160Khasra
158160Khasra
159590Khasra
418570Khasra
4244680Khasra
429980Khasra
441130Khasra
444490Khasra
113760Khasra
1161260Khasra
1213920Khasra
124KHA1260Khasra
425M3710Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 19 Jul 2012.

Registry no.DateTypeArea
1315419 Jul 2012self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 17724
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 300/7327
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 310/8273
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 324/10456
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 346/15372
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 371/270
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 385/6446
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D-1/3536
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D-13/10392
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D-18/13156
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D-19/13154
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D--2/3537
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D-21/13956
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D-22/13957
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D-3/4418
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D-5/6729
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · D-51/15639
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Hs-3/6103
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Hs-4/6236
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · K/359/9951
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S/52/13515
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-121/13266
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-125/13579
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-138/14393
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-145/548
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-146/549
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-157/2020
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-16/16690
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-166/2263
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-179/5988
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-184/7234
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-188/11285
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-196/14186
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-198/14399
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-203/16393
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-220/6730
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-227/7702
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-251/18719
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-255/19467
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-265/812
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-272/3908
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-281/4706
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-283/4984
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-295/6518
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-298/6512
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-68/1497
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · S-94/10826
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Y-10/17919
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceYES
Renewable energyYES
Other facilitiesYES

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Uttam Steels & Associates { Consortium) throug
RolePromoter · current
RERA IDUPRERAPRM9184
PANAAGCA0160Q
CIN / TANU45200DL2006PLC155229
Name of chairmanARVIND KUMAR MISHRA
Registered address115 Ansal Bhawan, 16 KG Marg, New Delhi-110001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameANSAL HI-TECH TOWNSHIPS LTD
RoleCo-promoter
Applicant typeCompany
Address115-ANSAL BHAWAN KASTURBA GANDHI MARG NEW DELHI-110001
RERA contact

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
AHTL PLOT ZONE VBankPUNJAB NATIONAL BANKBranchMID CORPORATE BRANCHA/C no.IFSCPUNB0419600
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

7 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)526 (Under Registration - 1 ) → 527 (Under Registration - 2 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)526 (Under Registration - 2 ) → 526 (Under Registration - 1 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)526 (Under Registration - 3 ) → 526 (Under Registration - 2 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)525 (Under Registration - 2 ) → 526 (Under Registration - 3 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)524 (Under Registration - 1 ) → 525 (Under Registration - 2 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)524 (Under Registration - 2 ) → 524 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)525 (Under Registration - 2 ) → 524 (Under Registration - 2 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 9 Oct 2026 · 7 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about PLOT ZONE V (1B)

Is PLOT ZONE V (1B) RERA registered?

Yes. PLOT ZONE V (1B) is registered with UPRERA under registration number UPRERAPRJ10825, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for PLOT ZONE V (1B)?

The completion date filed with UPRERA is 14 Feb 2026. No completion certificate is on record yet.

Who is the builder of PLOT ZONE V (1B)?

M/s Uttam Steels & Associates { Consortium) throug is the promoter entity that filed PLOT ZONE V (1B) with UPRERA (promoter RERA ID UPRERAPRM9184). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does PLOT ZONE V (1B) show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted PLOT ZONE V (1B) more time to complete?

UPRERA's record carries 1 completion extension for PLOT ZONE V (1B), the latest running to 14 Feb 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does PLOT ZONE V (1B) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PLOT ZONE V (1B) located?

PLOT ZONE V (1B) is registered in Gautam Budh Nagar, as filed with UPRERA.