RIDDHI RESIDENCY

UPRERARegistered

RIDDHI RESIDENCY is a RERA-registered residential project by HARI BANSH SHUKLA in Gorakhpur (RERA ID UPRERAPRJ17614). Registered with a completion deadline of 25 Mar 2022. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ17614
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGorakhpur Development Authority
Proposed start25 Sept 2018
Project duration43 months
AddressGorakhpur, Gorakhpur
TehsilGorakhpur
Applicant typeIndividual
Applicant address103/16 Mohaddipur Chauraha Gorakhpur. 273001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    716/13

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered19 Sept 2018
Original completion26 Sept 2021
Revised completion25 Mar 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹37,500
Sanctioning authorityGorakhpur Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors172 · 3 · 6 (units from plan)
  • 3 BHK98 57%
  • 2 BHK49 28%
  • 1 BHK25 15%
ConfigurationUnitsCarpet area
2 BHK4984-84
3 BHK988-129
1 BHK2559
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK-A · 1 BHK, 3 BHK53959-129
BLOCK-B · 2 BHK54984-84
BLOCK-C · 3 BHK6848-129
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SATYENDRA KUMAR CHAUDHARY
License CA/2014/63416
GDA SHOPPING COMPLEX,TARAMANDAL GORAKHPUR
Engineer
SHASHI PRAKESH PANDEY
GORAKHNATH GORAKHPUR
Contractor
RAVIENDRA SINGH
SHAHRA STATE GORAKHPUR
Sr.Development work declared to RERA
1Demarcation of Plots
100
2Boundary Wall
0
3Road Work
0
4Footpaths
0
5Water Supply Including Drinking Water Facilities
0
6Sewer System
0
7Drain
0
8Parks
0
9Tree Planting
0
10Design For Electric Supply Including Street Lighting
0
11Community Buildings
0
12Treatment and Disposal System of Sewage and Sullage water
0
13Solid Waste Management And Disposal System
0
14Water Conservation System
0
15Energy Management System Including Use of Renewable Energy
0
16Fire Protection And Fire Safety System
0
17Social Infrastructure And Other Public Amenities Including Public Health Services
0
18Emergency Evacuation Services
0
19Other Miscellaneous Work
0
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 27 May 2023.

Sanctioned by Gorakhpur Development Authority · 6,500 sqm of land · an approved plan of 3 blocks and 172 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
716/1328 May 201827 May 202327 May 202326 Sept 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 25 Mar 2022.

#Granted fromExtended uptoNote
126 Sept 202125 Mar 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1396500Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 781
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New19 Sept 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New19 Sept 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New19 Sept 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New19 Sept 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New19 Sept 2018 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameHARI BANSH SHUKLA
RolePromoter · current
RERA IDUPRERAPRM45613
PANAECPH9467E
Registered address103/16 Mohaddipur Chauraha Gorakhpur. 273001
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
HARIKAMLA ASSOCIATESBankOBCBranchBANK ROADA/C no.IFSCORBC0000384
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about RIDDHI RESIDENCY

Is RIDDHI RESIDENCY RERA registered?

Yes. RIDDHI RESIDENCY is registered with UPRERA under registration number UPRERAPRJ17614, registered on 19 Sept 2018. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for RIDDHI RESIDENCY?

The completion date filed with UPRERA is 25 Mar 2022. No completion certificate is on record yet.

Who is the builder of RIDDHI RESIDENCY?

HARI BANSH SHUKLA is the promoter entity that filed RIDDHI RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM45613). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does RIDDHI RESIDENCY show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted RIDDHI RESIDENCY more time to complete?

UPRERA's record carries 1 completion extension for RIDDHI RESIDENCY, the latest running to 25 Mar 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does RIDDHI RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RIDDHI RESIDENCY located?

RIDDHI RESIDENCY is registered in Gorakhpur, as filed with UPRERA.

What configurations are available in RIDDHI RESIDENCY?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in RIDDHI RESIDENCY?

The approved unit plan filed with UPRERA runs from 8 to 129 m² of carpet area (about 82 to 1,390 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in RIDDHI RESIDENCY?

The approved unit plan describes 3 blocks and 172 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is RIDDHI RESIDENCY?

About 107 units per acre: 172 planned units across 1.61 acres (6,500 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗