Sahu Buildwell

UPRERARegistered

Sahu Buildwell is a RERA-registered residential project by SAHU BUILDWELL PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ11544). Registered with a completion deadline of 30 Nov 2022. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ11544
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 Jun 2016
Original start1 Jun 2016
Project duration78 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompany
Applicant addressSHUBHAM THEATRE BUILDING, CANTONMENT ROAD, LUCKNOW-226001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    1130

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered15 Aug 2017
Original completion31 May 2022
Revised completion30 Nov 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹93,500
Sanctioning authorityAny Other Competent Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Arvind Kumar Gupta
License CA/2000/25574
Gomti Nagar Lucknow
Engineer
nil
nil
Sr.Development work declared to RERA
1Demarcation of Plots
Pending
2Boundary Wall
Pending
3Road Work
Pending
4Footpaths
Pending
5Water Supply Including Drinking Water Facilities
Pending
6Sewer System
Pending
7Drain
Pending
8Parks
Pending
9Tree Planting
Pending
10Design For Electric Supply Including Street Lighting
Pending
11Community Buildings
Pending
12Treatment and Disposal System of Sewage and Sullage water
Pending
13Solid Waste Management And Disposal System
Pending
14Water Conservation System
Pending
15Energy Management System Including Use of Renewable Energy
Pending
16Fire Protection And Fire Safety System
Pending
17Social Infrastructure And Other Public Amenities Including Public Health Services
Pending
18Emergency Evacuation Services
Pending
19Other Miscellaneous Work
Pending
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 5 Jul 2021.

Sanctioned by Any Other Competent Authority · 17,700 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
11306 Jul 20165 Jul 20215 Jul 202231 May 2022
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Nov 2022.

#Granted fromExtended uptoNote
131 May 202230 Nov 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
10220.0675—
10000.0600—
1019.2400—
979, 987, 1008, 1009, 1022 1023 1026 1027 1028 10251090Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 6 May 2016.

Registry no.DateTypeArea
799722 Jun 2017self—
70026 May 2016self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 7002
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7997
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New31 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New31 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterNIL
Fire safety (as filed with RERA)NIL
Health serviceNIL
Renewable energyNIL
Other facilitiesNIL

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSAHU BUILDWELL PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM21881
PANAAQCS2662H
CIN / TANLKNS13914F
Name of chairmanMR. SANJAY KUMAR SAHU
Registered addressSHUBHAM THEATRE BUILDING, CANTONMENT ROAD, LUCKNOW-226001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SAHU BUILDWELL PRIVATE LIMITEDBankBANK OF INDIABranchKAISERBAGH BRANCH LUCKNOWA/C no.IFSCBKID0006807
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about Sahu Buildwell

Is Sahu Buildwell RERA registered?

Yes. Sahu Buildwell is registered with UPRERA under registration number UPRERAPRJ11544, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Sahu Buildwell?

The completion date filed with UPRERA is 30 Nov 2022. No completion certificate is on record yet.

Who is the builder of Sahu Buildwell?

SAHU BUILDWELL PRIVATE LIMITED is the promoter entity that filed Sahu Buildwell with UPRERA (promoter RERA ID UPRERAPRM21881). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does Sahu Buildwell show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted Sahu Buildwell more time to complete?

UPRERA's record carries 1 completion extension for Sahu Buildwell, the latest running to 30 Nov 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Sahu Buildwell have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Sahu Buildwell located?

Sahu Buildwell is registered in Lucknow, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗