Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ1746
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start25 Feb 2017
Original start25 Feb 2017
Project duration98 months
AddressGautam budh nagar, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressReg office-438, Jagriti Enclave, Delhi-110092 Site/Project office-Plot No. SC-02/D, Sector-150, Noida, District Gautam Budh Nagar, Uttar Pradesh
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    NOIDA/2015/IV/1461/799

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. valid to

    Permit revalidated

    NA

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Jul 2017
Original completion31 Dec 2022
Revised completion29 Mar 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary22 Aug 2026
Registration fee₹2,06,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors902 · 13 · 27 (units from plan)
Homes · commercial units883 · 19 (shops and offices filed in the same plan)
  • 3 BHK529 59%
  • 2 BHK312 35%
  • 4 BHK42 5%
  • SHOP19 2%
ConfigurationUnitsCarpet area
2 BHK31265-65
3 BHK52965-99
SHOP197-19
4 BHK42132-169
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
SHOP · SHOP3197-19
TOWER A · 2 BHK, 3 BHK, 4 BHK154565-164
TOWER B · 2 BHK, 3 BHK, 4 BHK186665-169
TOWER C · 2 BHK, 3 BHK, 4 BHK207465-169
TOWER D · 2 BHK, 3 BHK, OTHER237865-91
TOWER E · 2 BHK, 3 BHK, OTHER258665-99
TOWER F · 2 BHK, 3 BHK, OTHER279365-91
TOWER G · 2 BHK, 3 BHK, OTHER279365-91
TOWER H · 2 BHK, 3 BHK, OTHER258665-91
TOWER I · 2 BHK, 3 BHK, OTHER237865-91
TOWER J · 3 BHK, 2 BHK, 4 BHK207365-169
TOWER K · 2 BHK, 3 BHK, 4 BHK186665-169
TOWER L · 2 BHK, 3 BHK, 4 BHK154565-164
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Deepak Mehta & Associates
License COA/87/10840
IInd Floor, Plot 16, Abhishek Place, LSC
Engineer
Optimum Design Private Limited
B-24, Sector 67, Noida-201301
Contractor
The Best Move Developers Private Limited
Plot No. - SC -02/D , Sector-150, Gautam Buddha Nagar, Uttar Pradesh- 201310
Sr.Development work declared to RERA
1Demarcation of Plots
AS PER APPROVED BUILDING PLAN
2Boundary Wall
AS PER APPROVED BUILDING PLAN
3Road Work
AS PER APPROVED BUILDING PLAN
4Footpaths
AS PER APPROVED BUILDING PLAN
5Water Supply Including Drinking Water Facilities
NOIDA AUTHORITY SHALL SUPPLY THE SAME
6Sewer System
STP TO TREAT THE SEWAGE
7Drain
AS PER APPROVED BUILDING PLAN
8Parks
AS PER APPROVED BUILDING PLAN
9Tree Planting
AS PER APPROVED BUILDING PLAN
10Design For Electric Supply Including Street Lighting
POWER SUPPLY FROM NPCL
11Community Buildings
CLUB AS PER APPROVED BUILDING PLAN
12Treatment and Disposal System of Sewage and Sullage water
STP WATER
13Solid Waste Management And Disposal System
COLLECTION, STORAGE AND DISPOSAL
14Water Conservation System
RAIN WATER HARVESTING
15Energy Management System Including Use of Renewable Energy
USE OF LED LIGHT
16Fire Protection And Fire Safety System
AS PER APPROVED BUILDING PLAN
17Social Infrastructure And Other Public Amenities Including Public Health Services
AS PER APPROVED BUILDING PLAN
18Emergency Evacuation Services
AS PER APPROVED BUILDING PLAN
19Other Miscellaneous Work
AS PER APPROVED BUILDING PLAN
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

8 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2AB INVEST HOMZ PVT. LtdUPRERAAGT14018
3Ajay KumarUPRERAAGT12594
4ANAROCK Property Consultants Private LimitedUPRERAAGT10265
5BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
6PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED)UPRERAAGT10032
7SMC Real Estate Advisors Private LimitedUPRERAAGT10113
8star estateUPRERAAGT10202
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 22 Jun 2020. All 2 carry a revalidation, the latest valid to 31 Dec 2022.

Sanctioned by Noida Authority · 40,186 sqm of land · an approved plan of 13 blocks and 902 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
NOIDA/2015/IV/1461/79923 Jun 201522 Jun 202031 Dec 202231 Dec 202231 Dec 2017
valid to 31 Dec 2022
as NA
NOIDA/2015/IV/1461/79923 Jun 201522 Jun 202022 Jun 202529 Mar 202523 Jun 2015
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Mar 2025.

#Granted fromExtended uptoNote
131 Dec 202230 Jun 2023Six months extension in view of force majeure caused by covid-19 pandemic
230 Jun 202329 Mar 2025—

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
SC-02/D, SECTOR 150, NOIDA40186Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 7 Apr 2015.

Registry no.DateTypeArea
69407 Apr 2015Other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 6940
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New5 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New5 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New5 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old27 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old27 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old27 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old27 Apr 2018 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old28 Apr 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceYES
Renewable energyYES

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

20 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

20 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q498.16%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2024-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSAMRIDHI INFRA SQUARE PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM1933
PANAADCT7052M
CIN / TANU70200DL2011PTC212191
Name of chairmanMR. DINESH KUMAR GUPTA
Registered addressReg office-438, Jagriti Enclave, Delhi-110092 Site/Project office-Plot No. SC-02/D, Sector-150, Noida, District Gautam Budh Nagar, Uttar Pradesh
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SAMRIDHI INFRA SQUARE PVT LTDBankHDFC BANKBranchPREET VIHARA/C no.IFSCHDFC0001350
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

8 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)25 (Under Registration - 0 ) → 27 (Under Registration - 2 )
changed in Estanzo’s record
3 Oct 2026
Actual completion2026-08-22
first recorded by Estanzo
31 Aug 2026
Permit paperwork
2 · Project Specifications
Project Specifications
newly filed with RERA
31 Aug 2026
Permit paperwork
2 · Floor Plan Of All Types
Floor Plan Of All Types
newly filed with RERA
31 Aug 2026
Permit paperwork
2 · Approved Map
Approved Map
newly filed with RERA
31 Aug 2026
Permit paperwork
2 · Sanctioned Letter
Sanctioned Letter
newly filed with RERA
31 Aug 2026
Permit paperwork
2 · Approved Layout
Approved Layout
newly filed with RERA
31 Aug 2026
Sanctioning permit
no. 2
NOIDA/2015/IV/1461/799
newly filed with RERA
31 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 3 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about SAMRIDHI LUXURIYA AVENUE

Is SAMRIDHI LUXURIYA AVENUE RERA registered?

Yes. SAMRIDHI LUXURIYA AVENUE is registered with UPRERA under registration number UPRERAPRJ1746, registered on 27 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has SAMRIDHI LUXURIYA AVENUE been completed?

UPRERA still lists SAMRIDHI LUXURIYA AVENUE as Registered, so it is not shown as completed here. A completion certificate dated 22 Aug 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of SAMRIDHI LUXURIYA AVENUE?

SAMRIDHI INFRA SQUARE PRIVATE LIMITED is the promoter entity that filed SAMRIDHI LUXURIYA AVENUE with UPRERA (promoter RERA ID UPRERAPRM1933). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted SAMRIDHI LUXURIYA AVENUE more time to complete?

UPRERA's record carries 2 completion extensions for SAMRIDHI LUXURIYA AVENUE, the latest running to 29 Mar 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SAMRIDHI LUXURIYA AVENUE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SAMRIDHI LUXURIYA AVENUE located?

SAMRIDHI LUXURIYA AVENUE is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SAMRIDHI LUXURIYA AVENUE?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK, OTHER, SHOP and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SAMRIDHI LUXURIYA AVENUE?

The approved unit plan filed with UPRERA runs from 7 to 169 m² of carpet area (about 77 to 1,823 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SAMRIDHI LUXURIYA AVENUE?

The approved unit plan describes 13 blocks and 902 units of which 883 are homes and 19 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SAMRIDHI LUXURIYA AVENUE?

About 91 units per acre: 902 planned units across 9.93 acres (40,186 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.