SARASWATI SAGAR is a RERA-registered residential project by SARASWATI SAGAR in Meerut (RERA ID UPRERAPRJ6064). Registered with a completion deadline of 29 Dec 2022.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6064 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Meerut Development Authority |
| Proposed start | 1 Jul 2017 |
| Original start | 6 Jun 2014 |
| Project duration | 66 months |
| Address | Meerut, Meerut |
| Tehsil | Meerut |
| Applicant type | Partnership Firm |
| Applicant address | 207, 2ND FLOOR, SARASWATI PLAZA, SHIVA JI ROAD, MEERUT-250002 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
3 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 4 Aug 2017 |
| Original completion | 30 Jun 2022 |
| Revised completion | 29 Dec 2022 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 26 Nov 2020 |
| Registration fee | ₹74,500 |
| Sanctioning authority | Meerut Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots 72 Plots |
| 2 | Boundary Wall 584.74 R. Mtr. |
| 3 | Road Work Road work length x broadness is 45.00 mtr. x 12 mtr. Road work length x broadness is 65.00 mtr. x 9 mtr. Road work length x broadness is 278.00 mtr. x 7.5 mtr. Road work length x broadness is 111.00 mtr. x 6 mtr. |
| 4 | Footpaths Including in above |
| 5 | Water Supply Including Drinking Water Facilities 365.00 mtr. Length 140 MM dia PVC Pipe |
| 6 | Sewer System 355 Mtr Length P/f 250 mm dia MP-2 RCC spun Pipe manholes size 1.2 m x 1.0 m x 2.5m manholes size 0.6m x 0.6m x 2.0 m |
| 7 | Drain 560 Mtr Length |
| 8 | Parks 2079.81 Sq. Mtr., 538.74 R. Mtr. Boundry Length |
| 9 | Tree Planting 60 Trees |
| 10 | Design For Electric Supply Including Street Lighting As per Electric Drawing attached in PDF |
| 11 | Community Buildings N.A. |
| 12 | Treatment and Disposal System of Sewage and Sullage water P/C Mini Elelctronic Sewage Treatment Plant |
| 13 | Solid Waste Management And Disposal System N.A. |
| 14 | Water Conservation System P/C Rain Water Harvesting unit including boaring |
| 15 | Energy Management System Including Use of Renewable Energy N.A. |
| 16 | Fire Protection And Fire Safety System 12 Fire Hydrants |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N.A. |
| 18 | Emergency Evacuation Services N.A. |
| 19 | Other Miscellaneous Work N.A. |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 5 Jun 2019.
Sanctioned by Meerut Development Authority · 13,845 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 07/14 | 6 Jun 2014 | 5 Jun 2019 | 30 Jun 2022 | 30 Jun 2022 | |
| 07/14 | 6 Jun 2014 | 5 Jun 2019 | 30 Jun 2022 | 30 Jun 2022 | |
| 07/14 | 6 Jun 2014 | 5 Jun 2019 | 30 Jun 2022 | 30 Jun 2022 |
UPRERA’s record carries 1 completion extension for this project, running to 29 Dec 2022.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2022 | 29 Dec 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
5 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 242 PART | 30 | — |
| 243 | 13815 | — |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 29 Jul 2013.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 7960 | 29 Jul 2013 | self | — |
| 9046 | 13 Sept 2013 | self | — |
| Document | Status | Uploaded |
|---|---|---|
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jul 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
| Other facilities | PLANTATION RAIN WATER STP |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
11 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
11 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SARASWATI SAGAR |
| Role | Promoter · current |
| RERA ID | UPRERAPRM12225 |
| PAN | ACJFS9052K |
| CIN / TAN | MRTS09552E |
| Registered address | 207, 2ND FLOOR, SARASWATI PLAZA, SHIVA JI ROAD, MEERUT-250002 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | SARASWATI SAGAR |
| Role | Co-promoter · current |
| RERA ID | UPRERAPRM336098 |
| PAN | ACJFS9052K |
| CIN / TAN | MRTS09552E |
| Registered address | 207, 2ND FLOOR, SARASWATI PLAZA, SHIVAJI ROAD, MEERUT-250002 |
| RERA contact | |
| Registered since | 2024 |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | SARASWATI SAGARBankCORPORATION BANKBranchSAKET MEERUTA/C no.IFSCCORP0002104 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about SARASWATI SAGAR
Is SARASWATI SAGAR RERA registered?
Yes. SARASWATI SAGAR is registered with UPRERA under registration number UPRERAPRJ6064, registered on 4 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has SARASWATI SAGAR been completed?
UPRERA still lists SARASWATI SAGAR as Registered, so it is not shown as completed here. A completion certificate dated 26 Nov 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of SARASWATI SAGAR?
SARASWATI SAGAR is the promoter entity that filed SARASWATI SAGAR with UPRERA (promoter RERA ID UPRERAPRM12225). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted SARASWATI SAGAR more time to complete?
UPRERA's record carries 1 completion extension for SARASWATI SAGAR, the latest running to 29 Dec 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does SARASWATI SAGAR have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SARASWATI SAGAR located?
SARASWATI SAGAR is registered in Meerut, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗