Saya Gold Avenue (Phase 2)

UPRERARegistered

Saya Gold Avenue (Phase 2) is a RERA-registered residential project by SAYA HOMES PVT LTD in Ghaziabad (RERA ID UPRERAPRJ6678). Registered with a completion deadline of 30 Jun 2021.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6678
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Jul 2015
Original start1 Jul 2015
Project duration72 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressB-7/45, Safdarjung Enclave Extention, New Delhi-110029
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    41/191/ZONE-6/202-13

  2. Building permit sanctioned

    41/191/Zone 6/12-13

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered1 Aug 2017
Original completion31 Dec 2019
Revised completion30 Jun 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary22 Jan 2022
Registration fee₹1,05,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors773 · 4 · 40 (units from plan)
  • 3 BHK476 62%
  • 4 BHK152 20%
  • 2 BHK141 18%
  • PENTHOUSE4 1%
ConfigurationUnitsCarpet area
2 BHK14157-91
3 BHK47679-97
PENTHOUSE4196-277
4 BHK152142-143
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
SG 1 · 2 BHK, 3 BHK3521057-88
SG 2 · 3 BHK3725979-79
SG 3 · PENTHOUSE, 2 BHK, 3 BHK3815091-215
SG 5 · 4 BHK, PENTHOUSE39154142-277
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Shivendra Nath
License CA/2012/56592
Plot No. 753 Second Floor Sec- 5 Vaishali, GZB
Engineer
Optimum Design Pvt Ltd.
B-24, Sector - 67 Noida
Contractor
Prime Perfect Buildcon Pvt. Ltd.
78A, Rahul Vihar, Secttor - 12 Ghaziabad UP
Sr.Development work declared to RERA
1Demarcation of Plots
Not applicable
2Boundary Wall
RCC solid walls
3Road Work
Internal road as 6m wide for traffic and fire tender movement. Would be a VDF Flooring on the treated water proofed area
4Footpaths
Interlokcing pavers
5Water Supply Including Drinking Water Facilities
Flushing Water tank, Fire and Domestic Tank of requisite capacity in all towers.
6Sewer System
Underground system using uPVC (SN-4) Sewer pipes.
7Drain
Underground system using uPVC (SN-4) pipes.
8Parks
AS PER LANDSCAPE LAYOUT PLAN
9Tree Planting
AS PER LANDSCAPE LAYOUT PLAN
10Design For Electric Supply Including Street Lighting
Electrical Meter Room near the entrance gate of the premises. ESS at the east face of the premises.
11Community Buildings
The Club House built up area shall be 2218 sqmts.
12Treatment and Disposal System of Sewage and Sullage water
The soil & waste from Toilets & Kitchen will be collected in Manholes in single network of R.C.C. pipes laid under ground having Manholes / Inspection Chambers at appropriate intervals.
13Solid Waste Management And Disposal System
Bio-Mechanical Composter. It converts organic waste added to the machine into nitrogen rich compost by reducing its volume by almost 70-80% of the original.
14Water Conservation System
Provision of Rain Water Harvesting and Water Conservation using low flow fixtures. Flow restrictor will be used to restrict the flow of water to achieve the objective.
15Energy Management System Including Use of Renewable Energy
Solar Panels Installation for supply the hot water to the top 10 floors of each towers.
16Fire Protection And Fire Safety System
"A fire ring main will be laid in the campus, which will feed wet risers of various towers and also the yard hydrants. "
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not applicable
18Emergency Evacuation Services
Staircases and Fire lifts
19Other Miscellaneous Work
Not applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

12 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1AADHAR PROPMART PRIVATE LIMITEDUPRERAAGT10142
2Deepak MehtaUPRERAAGT13710
3Earth Homes Pvt. LtdUPRERAAGT11244
4KARTIK INFRATOWN PRIVATE LIMITEDUPRERAAGT10413
5NEOBRIX CONSULTING PVT LTDUPRERAAGT10059
6Rajesh JainUPRERAAGT14616
7RAO Homez Pvt.LtdUPRERAAGT13780
8RELIOBRIX CONSULTING PRIVATE LIMITEDUPRERAAGT10049
9Rohit JainUPRERAAGT13465
10SANG INFRATECH PVT. LTD.UPRERAAGT10024
11Sunil TyagiUPRERAAGT14565
12yogender kumar rajputUPRERAAGT14666
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 29 Sept 2018. It carries a revalidation, valid to 21 Jun 2020.

Sanctioned by Ghaziabad Development Authority · 20,036 sqm of land · an approved plan of 4 blocks and 773 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
41/191/Zone 6/12-1322 Jun 201529 Sept 201821 Jun 202330 Jun 202122 Jun 2015
valid to 21 Jun 2020
as 41/191/ZONE-6/202-13
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 30 Jun 2021.

#Granted fromExtended uptoNote
131 Dec 201924 Apr 2020—
224 Apr 202023 Oct 2020Six months extension in view of force majeure caused by covid-19 pandemic
323 Oct 202030 Jun 2021—

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Bahi no- 1, Jild no-29584, Page n0 -145 to 182, Se20036Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · Bahi no- 1, Jild no-29584, Page n0 -145 to 182, Serial no - 8688.
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New11 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New29 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New29 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old31 Jul 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old31 Jul 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old31 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old31 Jul 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old26 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes / As per Plan
Fire safety (as filed with RERA)Yes / As per Plan
Renewable energyYes / As per Plan
Other facilitiesAs per Plan

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSAYA HOMES PVT LTD
RolePromoter · current
RERA IDUPRERAPRM6668
PANAAQCS4142J
CIN / TANU70101DL2010PTC211055
Name of chairmanVikas Bhasin, Manoj Kr Jain & Vipin Madan
Registered addressB-7/45, Safdarjung Enclave Extention, New Delhi-110029
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SAYA HOMES RERA ACC PH IIBankYES Bank LtdBranchRajnagar District Centre , GhaziabadA/C no.IFSCYESB0000038
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)87 (Under Registration - 0 ) → 88 (Under Registration - 1 )
changed in Estanzo’s record
13 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Saya Gold Avenue (Phase 2)

Is Saya Gold Avenue (Phase 2) RERA registered?

Yes. Saya Gold Avenue (Phase 2) is registered with UPRERA under registration number UPRERAPRJ6678, registered on 1 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Saya Gold Avenue (Phase 2) been completed?

UPRERA still lists Saya Gold Avenue (Phase 2) as Registered, so it is not shown as completed here. A completion certificate dated 22 Jan 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Saya Gold Avenue (Phase 2)?

SAYA HOMES PVT LTD is the promoter entity that filed Saya Gold Avenue (Phase 2) with UPRERA (promoter RERA ID UPRERAPRM6668). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Saya Gold Avenue (Phase 2) more time to complete?

UPRERA's record carries 3 completion extensions for Saya Gold Avenue (Phase 2), the latest running to 30 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Saya Gold Avenue (Phase 2) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Saya Gold Avenue (Phase 2) located?

Saya Gold Avenue (Phase 2) is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Saya Gold Avenue (Phase 2)?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK, PENTHOUSE and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Saya Gold Avenue (Phase 2)?

The approved unit plan filed with UPRERA runs from 57 to 277 m² of carpet area (about 613 to 2,982 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Saya Gold Avenue (Phase 2)?

The approved unit plan describes 4 blocks and 773 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Saya Gold Avenue (Phase 2)?

About 156 units per acre: 773 planned units across 4.95 acres (20,036 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗