Sector J, Basantkunj Yojna

UPRERARegistered

Sector J, Basantkunj Yojna is a RERA-registered residential project by Lucknow Development Authority in Lucknow (RERA ID UPRERAPRJ119807). Registered with a completion deadline of 4 Jan 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ119807
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Industrial Development Authority
Proposed start6 Jul 2019
Project duration66 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompetent authority
Applicant addressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    585/CTP/2019Dt.08.05.19

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 Sept 2019
Original completion5 Jul 2024
Revised completion4 Jan 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary13 Feb 2025
Registration fee₹30,14,500
Sanctioning authorityLucknow Industrial Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
CTP LDA
License CTP/LDA
Vipinkhand Gomtinagar Lucknow
Engineer
Pratap Shankar Mishra
Pradhikaran bhawan , Vipinkhand Gomtinagar Lucknow Pincode- 226010
Contractor
G M Construction V K Construction Shivansh Construction
(GM Construction) 2/297,Vishalkhand Gomtinagar Lucknow, (VK Construction ) L3/557,Vineet khand Gomtinagar Lucknow , (Shivansh Construction) 5/480, Viramkhand, Gomtinagar Lucknow.
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation of plots is proposed.
2Boundary Wall
NA
3Road Work
As per Layout
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
Overhead Tank and water distribution pipe is proposed.
6Sewer System
Sewer system with STP proposed.
7Drain
Drain is Proposed
8Parks
Land reserved for parks as per layout.
9Tree Planting
Proposed.
10Design For Electric Supply Including Street Lighting
Proposed
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Proposed
13Solid Waste Management And Disposal System
Land is reserved for Garbage collection. After developing the project solid waste collection would be done by Nagar Nigam Lucknow.
14Water Conservation System
NA
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
Area reserved for Health center, facilities, school and Hotel.
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 1 May 2024.

Sanctioned by Lucknow Industrial Development Authority · 6,01,823 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
585/CTP/2019Dt.08.05.192 May 20191 May 20241 May 20275 Jul 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 4 Jan 2025.

#Granted fromExtended uptoNote
15 Jul 20244 Jan 2025Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
21 22 23 27 28 29 30 31 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 209 210 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 235 236 237 238 239 240 241 242 244 245 246 247 248 248 249 250 251 252 253 254 255 256 257 258 259 262 263 264 265 266 267 269 270 271 272 273 274 275 276 278 337 338 339 340 341 342 343 344 345 346 347 348 350 353 370 371 372 373 374 375 440 442 3207 111/1136 97601823Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 4329/37-2-81--9LA-81
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New28 Aug 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New28 Aug 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New28 Aug 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Aug 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New28 Aug 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Aug 2019 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameLucknow Development Authority
RolePromoter · current
RERA IDUPRERAPRM10102
PANAAALL0016F
CIN / TANLKNL00280A
Registered addressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Sector J Basant Kunj SchemeBankICICIBranchHazratganj LucknowA/C no.IFSCICIC0006281
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

8 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)584 (Under Registration - 5 ) → 584 (Under Registration - 4 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)583 (Under Registration - 4 ) → 584 (Under Registration - 5 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)583 (Under Registration - 5 ) → 583 (Under Registration - 4 )
changed in Estanzo’s record
19 Sept 2026
Promoter’s complaints tally (all their projects)583 (Under Registration - 7 ) → 583 (Under Registration - 5 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)582 (Under Registration - 7 ) → 583 (Under Registration - 7 )
changed in Estanzo’s record
7 Sept 2026
Promoter’s complaints tally (all their projects)580 (Under Registration - 5 ) → 582 (Under Registration - 7 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)579 (Under Registration - 5 ) → 580 (Under Registration - 5 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)578 (Under Registration - 4 ) → 579 (Under Registration - 5 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026 · 8 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Sector J, Basantkunj Yojna

Is Sector J, Basantkunj Yojna RERA registered?

Yes. Sector J, Basantkunj Yojna is registered with UPRERA under registration number UPRERAPRJ119807, registered on 2 Sept 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has Sector J, Basantkunj Yojna been completed?

UPRERA still lists Sector J, Basantkunj Yojna as Registered, so it is not shown as completed here. A completion certificate dated 13 Feb 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Sector J, Basantkunj Yojna?

Lucknow Development Authority is the promoter entity that filed Sector J, Basantkunj Yojna with UPRERA (promoter RERA ID UPRERAPRM10102). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Sector J, Basantkunj Yojna more time to complete?

UPRERA's record carries 1 completion extension for Sector J, Basantkunj Yojna, the latest running to 4 Jan 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Sector J, Basantkunj Yojna have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Sector J, Basantkunj Yojna located?

Sector J, Basantkunj Yojna is registered in Lucknow, as filed with UPRERA.