Sector N , Basant Kunj Yojna is a RERA-registered residential project by Lucknow Development Authority in Lucknow (RERA ID UPRERAPRJ310969). Registered with a completion deadline of 13 Jan 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ310969 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 15 Jul 2019 |
| Project duration | 66 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Competent authority |
| Applicant address | Lucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
584 CTP/2019 Dated08.05.19
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 2 Sept 2019 |
| Original completion | 14 Jul 2024 |
| Revised completion | 13 Jan 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 13 Feb 2025 |
| Registration fee | ₹7,38,500 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation of plots is proposed. |
| 2 | Boundary Wall Not Proposed. |
| 3 | Road Work Proposed as per layout. |
| 4 | Footpaths Not Proposed. |
| 5 | Water Supply Including Drinking Water Facilities Over head Tank and Water distribution pipes are proposed. |
| 6 | Sewer System Sewer System with S.T.P. is proposed. S.T.P. Proposed at sector J for whole of Basant Kunj Youjna |
| 7 | Drain Drain is Proposed |
| 8 | Parks Approximately more than 15 percent area is under park / green, as per layout. |
| 9 | Tree Planting Tree Planting is proposed as parks and green areas. |
| 10 | Design For Electric Supply Including Street Lighting Electric supply Including streetlight would be done as per design. |
| 11 | Community Buildings Land is reserved for facilitates as per layout. |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP is proposed at Sector J |
| 13 | Solid Waste Management And Disposal System After Developing of the project it would be handed over to Nagar Nigam Lucknow. |
| 14 | Water Conservation System Rainwater harvesting has been proposed. |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Land reserved for educational , facilities and Nursing Home |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 1 May 2024.
Sanctioned by Lucknow Development Authority · 1,46,610 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 584 CTP/2019 Dated08.05.19 | 2 May 2019 | 1 May 2024 | 31 May 2027 | 14 Jul 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 13 Jan 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 14 Jul 2024 | 13 Jan 2025 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 267,376,377,379,382,383,387,388, 389, 390,391,392,394,395,396,397,399,400,401,402,403,405,406,409,410,411,711, 713,714, 715,716,717,718,721,722,723,724,727,730,731,732,733,734. | 146610 | Khasra |
| Allotment letter from the authority · 4329/37-2-81-9 LA-81 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 22 Aug 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 22 Aug 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 27 Aug 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 24 Aug 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 29 Aug 2019 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Lucknow Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM10102 |
| PAN | AAALL0016F |
| CIN / TAN | LKNL00280A |
| Registered address | Lucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow |
| RERA contact | |
| Registered since | 2017 |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Basant Kunj SchemeBankICICIBranchLucknow HazratganjA/C no.IFSCICIC0006281 |
What has changed on this record
8 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 584 (Under Registration - 5 ) → 584 (Under Registration - 4 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 583 (Under Registration - 4 ) → 584 (Under Registration - 5 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 583 (Under Registration - 5 ) → 583 (Under Registration - 4 ) changed in Estanzo’s record | 19 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 583 (Under Registration - 7 ) → 583 (Under Registration - 5 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 582 (Under Registration - 7 ) → 583 (Under Registration - 7 ) changed in Estanzo’s record | 7 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 580 (Under Registration - 5 ) → 582 (Under Registration - 7 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 579 (Under Registration - 5 ) → 580 (Under Registration - 5 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 578 (Under Registration - 4 ) → 579 (Under Registration - 5 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 13 Oct 2026 · 8 movements on record |
What to verify and what to ask
3 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Sector N , Basant Kunj Yojna
Is Sector N , Basant Kunj Yojna RERA registered?
Yes. Sector N , Basant Kunj Yojna is registered with UPRERA under registration number UPRERAPRJ310969, registered on 2 Sept 2019. Estanzo reproduces that filing; it does not verify the work behind it.
Has Sector N , Basant Kunj Yojna been completed?
UPRERA still lists Sector N , Basant Kunj Yojna as Registered, so it is not shown as completed here. A completion certificate dated 13 Feb 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Sector N , Basant Kunj Yojna?
Lucknow Development Authority is the promoter entity that filed Sector N , Basant Kunj Yojna with UPRERA (promoter RERA ID UPRERAPRM10102). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Sector N , Basant Kunj Yojna more time to complete?
UPRERA's record carries 1 completion extension for Sector N , Basant Kunj Yojna, the latest running to 13 Jan 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Sector N , Basant Kunj Yojna have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Sector N , Basant Kunj Yojna located?
Sector N , Basant Kunj Yojna is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗