Sector N , Basant Kunj Yojna

UPRERARegistered

Sector N , Basant Kunj Yojna is a RERA-registered residential project by Lucknow Development Authority in Lucknow (RERA ID UPRERAPRJ310969). Registered with a completion deadline of 13 Jan 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ310969
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start15 Jul 2019
Project duration66 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompetent authority
Applicant addressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    584 CTP/2019 Dated08.05.19

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 Sept 2019
Original completion14 Jul 2024
Revised completion13 Jan 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary13 Feb 2025
Registration fee₹7,38,500
Sanctioning authorityLucknow Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
CTP Lucknow Development Authority
License CTP/LDA
Vipinkhand Gomtinagar Lucknow pin - 226010
Engineer
Pratap Shankar Mishra
LDA Vipinkhand Gomtinagar Lucknow Pin code-226010
Contractor
Shivansh Construction Hemant construction Gayatri Construction etc
Shivansh construction 5/480 , viramkhand Gomtinagar Lucknow / Hemant Construction MS-2/796 Sector-F Jankipuram, Lucknow, / Gayatri Construction M2-/203 Sector -H LDA Coloney Lucknow /
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation of plots is proposed.
2Boundary Wall
Not Proposed.
3Road Work
Proposed as per layout.
4Footpaths
Not Proposed.
5Water Supply Including Drinking Water Facilities
Over head Tank and Water distribution pipes are proposed.
6Sewer System
Sewer System with S.T.P. is proposed. S.T.P. Proposed at sector J for whole of Basant Kunj Youjna
7Drain
Drain is Proposed
8Parks
Approximately more than 15 percent area is under park / green, as per layout.
9Tree Planting
Tree Planting is proposed as parks and green areas.
10Design For Electric Supply Including Street Lighting
Electric supply Including streetlight would be done as per design.
11Community Buildings
Land is reserved for facilitates as per layout.
12Treatment and Disposal System of Sewage and Sullage water
STP is proposed at Sector J
13Solid Waste Management And Disposal System
After Developing of the project it would be handed over to Nagar Nigam Lucknow.
14Water Conservation System
Rainwater harvesting has been proposed.
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
Land reserved for educational , facilities and Nursing Home
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 1 May 2024.

Sanctioned by Lucknow Development Authority · 1,46,610 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
584 CTP/2019 Dated08.05.192 May 20191 May 202431 May 202714 Jul 2024
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 13 Jan 2025.

#Granted fromExtended uptoNote
114 Jul 202413 Jan 2025Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
267,376,377,379,382,383,387,388, 389, 390,391,392,394,395,396,397,399,400,401,402,403,405,406,409,410,411,711, 713,714, 715,716,717,718,721,722,723,724,727,730,731,732,733,734.146610Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 4329/37-2-81-9 LA-81
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New22 Aug 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New22 Aug 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New27 Aug 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New24 Aug 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Aug 2019 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameLucknow Development Authority
RolePromoter · current
RERA IDUPRERAPRM10102
PANAAALL0016F
CIN / TANLKNL00280A
Registered addressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Basant Kunj SchemeBankICICIBranchLucknow HazratganjA/C no.IFSCICIC0006281
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

8 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)584 (Under Registration - 5 ) → 584 (Under Registration - 4 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)583 (Under Registration - 4 ) → 584 (Under Registration - 5 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)583 (Under Registration - 5 ) → 583 (Under Registration - 4 )
changed in Estanzo’s record
19 Sept 2026
Promoter’s complaints tally (all their projects)583 (Under Registration - 7 ) → 583 (Under Registration - 5 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)582 (Under Registration - 7 ) → 583 (Under Registration - 7 )
changed in Estanzo’s record
7 Sept 2026
Promoter’s complaints tally (all their projects)580 (Under Registration - 5 ) → 582 (Under Registration - 7 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)579 (Under Registration - 5 ) → 580 (Under Registration - 5 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)578 (Under Registration - 4 ) → 579 (Under Registration - 5 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026 · 8 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Sector N , Basant Kunj Yojna

Is Sector N , Basant Kunj Yojna RERA registered?

Yes. Sector N , Basant Kunj Yojna is registered with UPRERA under registration number UPRERAPRJ310969, registered on 2 Sept 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has Sector N , Basant Kunj Yojna been completed?

UPRERA still lists Sector N , Basant Kunj Yojna as Registered, so it is not shown as completed here. A completion certificate dated 13 Feb 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Sector N , Basant Kunj Yojna?

Lucknow Development Authority is the promoter entity that filed Sector N , Basant Kunj Yojna with UPRERA (promoter RERA ID UPRERAPRM10102). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Sector N , Basant Kunj Yojna more time to complete?

UPRERA's record carries 1 completion extension for Sector N , Basant Kunj Yojna, the latest running to 13 Jan 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Sector N , Basant Kunj Yojna have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Sector N , Basant Kunj Yojna located?

Sector N , Basant Kunj Yojna is registered in Lucknow, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗