Shital Palmgreens

UPRERARegistered

Shital Palmgreens is a RERA-registered residential project by SHITAL INFRA DEVELOPERS PRIVATE LIMITED in Sevai, Lucknow (RERA ID UPRERAPRJ695099). Registered with a completion deadline of 29 Jul 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ695099
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Apr 2026
Project duration64 months
AddressKHASARA NO.-342- 359, 366- 368,370,371,396,398,399,402- 414, 416, 419- 424, 427, 429,430,432,433,436-442, 445, 470 SITUATED AT VILLEGE SEVAI, NAGRAM ROAD, TEHSIL SAROJINI NAGAR, LUCKNOW, Sevai, Sarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant addressC- 2195 INDIRA NAGAR , LUCKNOW, Uttar Pradesh, India - 226016.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    LDA/LD/25-26/3668

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered22 Aug 2026
Original completion29 Jul 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹4,80,500
Sanctioning authorityLucknow Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sachin Chauhan
License CA/2019/114279
624v-02 Lower Ground Floor Vibhuti Khand Gomti Nagar Lucknow Pin 226010Gomti Nagar
Engineer
Surjeet Kumar Verma
1/125 Vikrant Khand Gomti Nagar Lucknow 226010
Contractor
Shital Infra Developers Private limited
Indira Nagar Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation of plots will be done after the completion of development work.
2Boundary Wall
Brick work boundary wall at the height of 2100 mm high. Length Of Boundary Wall is 2975.28 metre
3Road Work
Road will be constructed as per the sanctioned layout plan. Earth filling work sub grade preparation GSB 200 mm laying and final premix carpet will be done in stepwise development work. The roads in Shital Palmgreens Township has been designed with variety of road width from 30 M, 24 M, 18 M, 12 M and 9 M. Pathways, Cycle Track, are provided to enhance mobility.
4Footpaths
The footpath will be developed with interlocking tiles. The footpath will vary according to the ROW varrying from 1.5 M to 2.5 M as per road width.
5Water Supply Including Drinking Water Facilities
The water supply system for the building shall be designed to ensure reliable, hygienic, and adequate water availability for fire protection as well as domestic use. Source & Storage: •Water from the bore well shall be conveyed through suitable pipelines to the Overhead Storage Tank (An overhead water storage tank (OHT) of 100.98 KLD). •Water from the domes c sec on of the OHT shall be pumped using electrically operated pumps to the Overhead Tank (OHT). •Overhead tanks (OHT) of 100.98 KLD for domestic water and flushing water are provided for gravity-based distribution. •The pumping system shall include necessary control valves, non return valves, pressure gauges, and isolation valves. •Adequate pump capacity shall be provided to maintain required pressure and flow. Gravity Distribution: •From the OHT, water shall be supplied through a gravity-based distribution system. •Ver cal risers and horizontal distribu on pipelines shall be provided to supply water to all toilets, kitchens, and other domestic points across all floors. System Design: •The en re distribu on network shall be designed to opmize
6Sewer System
The provision of sewerage chamber for Shital Palmgreens township to manage waste water afficiently.The diameter of sewer pipe is 150mm to 600 mm as per population and load demand. Overhead tank capacity:
7Drain
Storm water manhole with pipes (NP3 Pipe) provided with Dia varying from 900 mm to 1200 mm and depth varried according to slope.
8Parks
Parks with an area of 16807.35 sqmt. will be developed as per sanctioned layout with boundary wall of height 1.5 M as per design
9Tree Planting
Proposed Landscaping & Tree Plantation on green belts along roads and parks to create a greener, healthier & more pleasant environment.
10Design For Electric Supply Including Street Lighting
Proposed Electric work including street lights on sides of the road for better visibility. The main Electric substation is of 820 KVA connected with feeder pillars.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
STP is proposed in the Township with capacity as :- Total required Capacity:201KLD- Treated water from the STP shall be reused for flushing, landscaping, and other non-potable purposes, in compliance with statutory requirements.
13Solid Waste Management And Disposal System
Designated space for Solid waste collection centre is provided for the entire Township as shown in the Layout Plan.
14Water Conservation System
Rain water harvesting pits are provided in the parks.
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
Area provided for Public semi-public use such as Schools, Health centres, Police post, Community hall etc.
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 29 Jul 2031.

Sanctioned by Lucknow Development Authority · 95,056 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
LDA/LD/25-26/366830 Jun 202629 Jul 203129 Jul 203429 Jul 2031
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

89 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
342970Khasra
3431200Khasra
347100Khasra
34890Khasra
349100Khasra
3502020Khasra
352310Khasra
3531010Khasra
3561390Khasra
357560Khasra
3582960Khasra
3593160Khasra
3683140Khasra
370670Khasra
3712030Khasra
3922480Khasra
3961140Khasra
396S10120Khasra
3982190Khasra
3991850Khasra
4021620Khasra
4032510Khasra
4044360Khasra
405760Khasra
406MI1520Khasra
4071670Khasra
4082610Khasra
4092580Khasra
410360Khasra
411MI1070Khasra
412456Khasra
4133300Khasra
414250Khasra
4161950Khasra
4231420Khasra
4242000Khasra
427840Khasra
4301000Khasra
432957Khasra
4332660Khasra
4362780Khasra
4371900Khasra
438255Khasra
4391850Khasra
4402530Khasra
4421845Khasra
4452990Khasra
4701138Khasra
3441050Khasra
354760Khasra
3551090Khasra
3662600Khasra
441940Khasra
34650Khasra
4192225Khasra
4211640Khasra
3452280Khasra
3651520Khasra
351108Khasra
367820Khasra
422111.5Khasra
420240Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 3898
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 4975
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 25609
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 12908
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 27412
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 7912
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 20047
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 14303
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 27604
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 4425
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 18149
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 19545
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 21934
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 16628
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 22736
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 25062
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 22680
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 20048
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14180
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 20166
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10745
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Non Encumbrance Certificate compressed
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 ( Khatauni No. 441)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 ( Khatauni No. 344)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 ( Khatauni No. 446)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 ( Khatauni No. 354)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 ( Khatauni No. 355)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 ( Khatauni No. 366)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 16699
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 20030
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2352
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3386
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 12758
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 13500
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3804
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 21831
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2531
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1474
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 17123
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 28943
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 7847
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4889
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1425-1430(Khashra No.-422)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (Khasra No. 420)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 11468 (Agreement of Khasra No.420)
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Area chart
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
General body resolution
The resolution authorising an apartment owners’ association to act as the registering entity.
not reported—
Affidavit on balance development work
The promoter’s sworn statement about the development work still to be finished.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New25 Apr 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New21 Apr 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Mar 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New29 Mar 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 Mar 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Mar 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New21 Mar 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New20 Apr 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 Mar 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New2 Apr 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New20 Apr 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New20 Apr 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New12 May 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New21 Apr 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2026-Q1 to 2026-Q2.

QuarterConstructionCertificates
2026-Q12.85%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSHITAL INFRA DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM453881
PANAATCS9588B
CIN / TANLKNS12003F
Name of chairmanVimal Kumar
Registered addressC- 2195 INDIRA NAGAR , LUCKNOW, Uttar Pradesh, India - 226016.
RERA contact
Registered since2026
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameUMESH KUMAR
RoleCo-promoter
Applicant typeIndividual
Address6/844,sroj Niwas sector 6,Gomtinagar Extension,Lucknow-226010
RERA contact

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Shital Infra Developers Pvt. Ltd.Collection Account For Shital PalmgreensBankICICI Bank Ltd.BranchLucknow Vrindavan Yojna TwoBranch addressSeco-01 Kahlon Emporium Two Sector 12 Vrindavan Yojna LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0008375Branch emailGARIMA.GARIMA@ICICIBANK.IN
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Shital Infra Developers Pvt. Ltd. Seperate Account For Shital PalmgreensBankICICI Bank Ltd.BranchLucknow Vrindavan Yojna TwoBranch addressSeco-01 Kahlon Emporium Two Sector 12 Vrindavan Yojna LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0008375
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Shital Infra Developers Pvt. Ltd. Transaction Account For Shital PalmgreensBankICICI Bank Ltd.BranchLucknow Vrindavan Yojna TwoBranch addressSeco-01 Kahlon Emporium Two Sector 12 Vrindavan Yojna LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0008375
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
9 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Shital Palmgreens

Is Shital Palmgreens RERA registered?

Yes. Shital Palmgreens is registered with UPRERA under registration number UPRERAPRJ695099, registered on 22 Aug 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Shital Palmgreens?

The completion date filed with UPRERA is 29 Jul 2031. No completion certificate is on record yet.

Who is the builder of Shital Palmgreens?

SHITAL INFRA DEVELOPERS PRIVATE LIMITED is the promoter entity that filed Shital Palmgreens with UPRERA (promoter RERA ID UPRERAPRM453881). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Shital Palmgreens have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Shital Palmgreens located?

Shital Palmgreens is registered in Sevai, Lucknow, as filed with UPRERA.

Data as reported by UPRERA, as of 23 Oct 2026. official source ↗