SHIV GANGA RESIDENCY is a RERA-registered residential project by KALYAN CONSTRUCTION in Agra (RERA ID UPRERAPRJ13252). Registered with a completion deadline of 6 Oct 2020.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ13252 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Agra Development Authority |
| Proposed start | 10 Jun 2012 |
| Original start | 8 Jun 2012 |
| Project duration | 100 months |
| Address | Agra, Agra |
| Tehsil | Agra |
| Applicant type | Partnership Firm |
| Applicant address | NAGLA KALI , AGRA, UTTAR PRADESH 282009 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1567/BFT/02/05-06/ADA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- valid to
Permit revalidated
1567/BFT/02/05-06/ADA
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Completion certificate filed
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Sept 2017 |
| Original completion | 7 Apr 2020 |
| Revised completion | 6 Oct 2020 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 14 Apr 2022 |
| Registration fee | ₹1,27,500 |
| Sanctioning authority | Agra Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots demarcation of plots as per approved layout plan and work done by site engineer incharge. |
| 2 | Boundary Wall 9" thick, 6_ -0" in height,brick boundary wall. |
| 3 | Road Work provision of metal road as per required. |
| 4 | Footpaths interlocking tiled pathway on both side of the road. |
| 5 | Water Supply Including Drinking Water Facilities water supply from 100 kld overhead water tank. |
| 6 | Sewer System as per required , provision of sewer line with required chamber/manhole and connected to STP |
| 7 | Drain both side open drainage line . |
| 8 | Parks 3 number of park, with required plants and grass and also provision of jogging track. |
| 9 | Tree Planting as required |
| 10 | Design For Electric Supply Including Street Lighting as required |
| 11 | Community Buildings temple |
| 12 | Treatment and Disposal System of Sewage and Sullage water provision of S.T.P. capacity as per required |
| 13 | Solid Waste Management And Disposal System provision of dalab ghar on site. |
| 14 | Water Conservation System provision of rain water harvesting in park area as per required size. |
| 15 | Energy Management System Including Use of Renewable Energy N/A |
| 16 | Fire Protection And Fire Safety System N/A |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services N/A |
| 19 | Other Miscellaneous Work Entrance Gate |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 9 Apr 2017. It carries a revalidation, valid to 8 Apr 2020.
Sanctioned by Agra Development Authority · 24,460 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 1567/BFT/02/05-06/ADA | 9 Apr 2012 | 9 Apr 2017 | 8 Apr 2020 | 7 Apr 2020 | 9 Apr 2017 valid to 8 Apr 2020 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 6 Oct 2020.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 7 Apr 2020 | 6 Oct 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
22 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 75 (M)NAGLAKALI, Mauza:PARGANA,AGRA | 20360 | — |
| 76 (M)NAGLAKALI, Mauza:PARGANA,AGRA | 600 | — |
| 77 (M)NAGLAKALI, Mauza:PARGANA,AGRA | 500 | — |
| 78 (M)NAGLAKALI, Mauza:PARGANA,AGRA | 3000 | — |
| 75 | 20360 | Khasra |
| 76 | 600 | Khasra |
| 77 | 500 | Khasra |
| 78 | 3000 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 16 Nov 2012.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| FASLI VARSH 1419-1424/PART 1/ACCOUNT NO 00099 | 16 Nov 2012 | other | — |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 15 Dec 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 15 Dec 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 15 Dec 2019 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 15 Dec 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 15 Dec 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 15 Dec 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 15 Dec 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 15 Dec 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 15 Dec 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 15 Dec 2019 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Sept 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Over Head Tank supplying potable water to future residents |
| Fire safety (as filed with RERA) | N.A |
| Health service | Sewage Treatment plant and sufficient capacity road side drains are provided |
| Renewable energy | It is a plot development project , developed with most efficient technologies including Rain water Harvesting |
| Other facilities | IF REQUIRED |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | KALYAN CONSTRUCTION |
| Role | Promoter · current |
| RERA ID | UPRERAPRM26854 |
| PAN | AAKFK9764H |
| CIN / TAN | AGRK11702F |
| Registered address | NAGLA KALI , AGRA, UTTAR PRADESH 282009 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Agra
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | KALYAN CONSTRUCTIONBankBANK OF BARODABranchFATEHABAD ROAD AGRAA/C no.IFSCBARB0SIDDHA |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about SHIV GANGA RESIDENCY
Is SHIV GANGA RESIDENCY RERA registered?
Yes. SHIV GANGA RESIDENCY is registered with UPRERA under registration number UPRERAPRJ13252, registered on 28 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has SHIV GANGA RESIDENCY been completed?
UPRERA still lists SHIV GANGA RESIDENCY as Registered, so it is not shown as completed here. A completion certificate dated 14 Apr 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of SHIV GANGA RESIDENCY?
KALYAN CONSTRUCTION is the promoter entity that filed SHIV GANGA RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM26854). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted SHIV GANGA RESIDENCY more time to complete?
UPRERA's record carries 1 completion extension for SHIV GANGA RESIDENCY, the latest running to 6 Oct 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does SHIV GANGA RESIDENCY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SHIV GANGA RESIDENCY located?
SHIV GANGA RESIDENCY is registered in Agra, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗