Shri Radha Sky Gardens Phase-1

UPRERARegistered

Shri Radha Sky Gardens Phase-1 is a RERA-registered residential project by SJP Infracon Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ7482). Registered with a completion deadline of 31 Dec 2021.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7482
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Mar 2013
Original start1 Mar 2013
Project duration106 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressA-133, Sector-63, Noida, Gautam Buddh Nagar (Uttar Pradesh)
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    PLG/BP/2555/411/94/048

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. valid to

    Permit revalidated

    PLG/BP/2555/5350

  6. to

    Extension granted

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. 2 completion certificates filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion31 Dec 2018
Revised completion31 Dec 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary21 Jan 2026
Registration fee₹2,87,500
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors2,048 · 20 · 20 (units from plan)
Homes · commercial units1,960 · 88 (shops and offices filed in the same plan)
  • 2 BHK1,102 54%
  • 3 BHK808 39%
  • SHOP88 4%
  • 4 BHK38 2%
  • 1 BHK12 1%
ConfigurationUnitsCarpet area
3 BHK80878-151
4 BHK38172
2 BHK1,10262-88
1 BHK1249-51
SHOP8816-48
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
COMMERCIAL · SHOP28816-48
T1 · 3 BHK, 4 BHK2080141-172
T10 · 2 BHK2012063-69
T11 · 2 BHK, 1 BHK2012049-69
T12 · 2 BHK, 3 BHK2012263-82
T14 · 2 BHK, 3 BHK208463-78
T15 · 2 BHK, 1 BHK2011649-69
T16 · 2 BHK, 3 BHK2012063-82
T17 · 2 BHK, 3 BHK208068-78
T18 · 2 BHK, 1 BHK2012049-69
T19 · 2 BHK2012063-69
T2 · 2 BHK, 3 BHK2012073-102
T20 · 2 BHK, 3 BHK208068-78
T3 · 2 BHK, 3 BHK208074-102
T4 · 2 BHK, 3 BHK2012065-108
T5 · 2 BHK2011873-84
T6 · 2 BHK, 3 BHK208074-102
T7 · 2 BHK, 3 BHK2012065-108
T8 · 2 BHK, 3 BHK208088-145
T9 · 2 BHK, 3 BHK208068-78
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Space Designers International (Mr. Vishal Mittal)
License CA/1998/23185
B-34, Sector 67, Noida
Engineer
M/S Mehro Consultants
A-1/36, Safdarjung Enclave, New Delhi
Contractor
M/s Progressive Buildcon Pvt. Ltd.
H-20, Sector 63, Noida
Sr.Development work declared to RERA
1Demarcation of Plots
Not Applicable
2Boundary Wall
RCC and Brick Work with wire fencing.
3Road Work
6 M Wide Roads with Paved Surface and Paved
4Footpaths
Landscapeed /paved Pathways
5Water Supply Including Drinking Water Facilities
Potable water supplied by Municipal Authority stored in underground and overhead tanks provided on top of each tower
6Sewer System
Sewage system provided with adequate capacity of STP for treatment of effluents
7Drain
Surface Drainage system provided with provision of harvesting rainwater from building terrace
8Parks
adequate no. of Parks provided in central landscapped area with shading trees, pathways & Kids play area along with water bodies
9Tree Planting
Native tree plantation as per gold rated green building standards by IGBC provided in central area as well as periphery of the plot
10Design For Electric Supply Including Street Lighting
HT & LT Electric supply as per load demand of the complex provided with meter room, Transformers, HT Panel, LT Panel along with adequate DG Sets for power backup
11Community Buildings
Cetral Club/ Community building provided wth facility for indoor games , Gymnasium and swimming pool etc
12Treatment and Disposal System of Sewage and Sullage water
Sewage Treatment plant of adequate capacity provided in basement area for effluents. Water discharged from Plant used for landscaping/horticuture
13Solid Waste Management And Disposal System
Door to door collection of Solid waste planned along with engagement of specialized agency for disposal of all collected solid waste
14Water Conservation System
Water conservation measures as per Gold rated Green Building standards proposed such as installation of Irrigation system, Low flow fixtures etc
15Energy Management System Including Use of Renewable Energy
Renewable energy usage proposed in common area as per Gold rated Green building standards with Solar PV generation or Solar water Heating syatems.
16Fire Protection And Fire Safety System
Fire Hose Reels, Fire alarm system, Sprinklers, fire Extinguishers provided in each building satisfying all fire norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Commercil area along with central club, primary school, dispensary, milk booth provided as social amenties
18Emergency Evacuation Services
Emergency exits, fire exits provided in each tower at ground floor with adequate signages.
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

10 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ANAROCK Property Consultants Private LimitedUPRERAAGT10265
3BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
4Clicbrics Technologies Private Limited. Formerly Redbrics ITES India Pvt LtdUPRERAAGT10906
5FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
6INVEST MANGOUPRERAAGT12212
7INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
8PROPCASA CONSULTANCY PVT. LTD.UPRERAAGT10038
9Reckon Projects Pvt.Ltd.UPRERAAGT10043
10SMC Real Estate Advisors Private LimitedUPRERAAGT10113
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 11 Feb 2018. All 2 carry a revalidation, the latest valid to 20 Aug 2022.

Sanctioned by Greater Noida Authority · 56,483 sqm of land · an approved plan of 20 blocks and 2048 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
Letter no.12 Feb 201311 Feb 201820 Aug 202230 Jun 201921 Aug 2017
valid to 20 Aug 2022
as PLG/BP/2555/5350
PLG/BP/2555/411/94/04812 Feb 201311 Feb 201820 Aug 202230 Jun 201912 Feb 2013
valid to 20 Aug 2022
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 31 Dec 2021.

#Granted fromExtended uptoNote
131 Dec 201830 Jun 2019—
230 Jun 201931 Dec 2021—

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Part of GH-05, Sector 16B, Gretare Noida88074.90—
GH 05,Sector 16B, Greater Noida88075Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 16 Nov 2010.

Registry no.DateTypeArea
2338316 Nov 2010self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 23383
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New15 May 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New15 May 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New15 May 2019 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New30 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New15 May 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old31 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAs per NBC Norms
Fire safety (as filed with RERA)As per NBC Norms
Health serviceAs per NBC Norms
Renewable energyAs per Requirements
Other facilitiesAs per Sanctioned Plans

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSJP Infracon Limited
RolePromoter · current
RERA IDUPRERAPRM14486
PANAAOCS6480K
CIN / TANU70102UP2010PLC041520
Name of chairmanSuresh Chand Kaushik
Registered addressA-133, Sector-63, Noida, Gautam Buddh Nagar (Uttar Pradesh)
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SJP Infracon LimitedBankHDFC Bank LimitedBranchSector 62 NoidaA/C no.IFSCHDFC0000394
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

5 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)447 (Under Registration - 3 ) → 447 (Under Registration - 1 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)447 (Under Registration - 4 ) → 447 (Under Registration - 3 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)447 (Under Registration - 5 ) → 447 (Under Registration - 4 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)446 (Under Registration - 4 ) → 447 (Under Registration - 5 )
changed in Estanzo’s record
16 Aug 2026
Promoter’s complaints tally (all their projects)446 (Under Registration - 8 ) → 446 (Under Registration - 4 )
changed in Estanzo’s record
10 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 29 Sept 2026 · 5 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about Shri Radha Sky Gardens Phase-1

Is Shri Radha Sky Gardens Phase-1 RERA registered?

Yes. Shri Radha Sky Gardens Phase-1 is registered with UPRERA under registration number UPRERAPRJ7482, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Shri Radha Sky Gardens Phase-1 been completed?

UPRERA still lists Shri Radha Sky Gardens Phase-1 as Registered, so it is not shown as completed here. A completion certificate dated 21 Jan 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Shri Radha Sky Gardens Phase-1?

SJP Infracon Limited is the promoter entity that filed Shri Radha Sky Gardens Phase-1 with UPRERA (promoter RERA ID UPRERAPRM14486). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Shri Radha Sky Gardens Phase-1 more time to complete?

UPRERA's record carries 2 completion extensions for Shri Radha Sky Gardens Phase-1, the latest running to 31 Dec 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Shri Radha Sky Gardens Phase-1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Shri Radha Sky Gardens Phase-1 located?

Shri Radha Sky Gardens Phase-1 is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Shri Radha Sky Gardens Phase-1?

The unit plan filed with UPRERA lists 3 BHK, 4 BHK, 2 BHK, 1 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Shri Radha Sky Gardens Phase-1?

The approved unit plan filed with UPRERA runs from 16 to 172 m² of carpet area (about 168 to 1,851 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Shri Radha Sky Gardens Phase-1?

The approved unit plan describes 20 blocks and 2,048 units of which 1,960 are homes and 88 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Shri Radha Sky Gardens Phase-1?

About 147 units per acre: 2,048 planned units across 13.96 acres (56,483 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗