South City Extension Block-A

UPRERARegistered

South City Extension Block-A is a RERA-registered residential project by M/s Kunj Bihari Infra in Shahjahanpur (RERA ID UPRERAPRJ757820). Registered with a completion deadline of 12 Dec 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ757820
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start23 Mar 2021
Original start23 Mar 2021
Project duration33 months
AddressShahjahanpur, Shahjahanpur
TehsilShahjahanpur
Applicant typePartnership Firm
Applicant addressQ1, South City Extension, Shahjahanpur
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    244/20-21

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered10 Sept 2021
Original completion12 Dec 2023
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary14 Sept 2026
Registration fee₹18,500
Sanctioning authorityAny Other Competent Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
JASDEEP SINGH LAMBA
License CA/2002/28869
BAHADURGANJ, SHAHJAHANPUR
Engineer
SUNEEL MEHROTRA
CHUK, SHAHJAHANPUR
Contractor
ACHHAN ALI
KANT, SHAHJAHANPUR
Sr.Development work declared to RERA
1Demarcation of Plots
We have total 14 plots of different sizes, from 128.68 sq. mtr to 284.63 sq. mtr in this phase of the project.
2Boundary Wall
Boundary wall is proposed as part of the project.
3Road Work
From the main entrance gate, we have proposed CC road work throughout the entire project whose wideness ranges between 12 mtr 9 mtr, as approved by the prescribed authority, Shahjahanpur
4Footpaths
We will provide footpath on both side of the road with adequate width and beautiful pattern
5Water Supply Including Drinking Water Facilities
Not proposed in this phase
6Sewer System
Sewerage System shall be provided. All sewerage water shall be connected with the nearest Municipal Line.
7Drain
Drains shall be connected with all units, and all link drains shall be connected with the main drain, which shall be connected with the nearest Municipal drain.
8Parks
396.40 sq. mtr. green areas are proposed throughout the whole project.
9Tree Planting
We will provide many types of trees in the entire project site
10Design For Electric Supply Including Street Lighting
We will design and implement the system as per local electricity board and will consider centralized transformer, HT Panel, LT Panel, Feeder Pillar, etc.
11Community Buildings
Not proposed in this phase
12Treatment and Disposal System of Sewage and Sullage water
Sewerage system shall be provided. All sewerage water shall be connected with the nearest Municipal Line
13Solid Waste Management And Disposal System
There are a proper garage collection area provided for the solid waste management as per Municipal Guidelines
14Water Conservation System
We will suggest individual to use low flow fixture as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level
15Energy Management System Including Use of Renewable Energy
We will use LED light fitting in the external area and street light
16Fire Protection And Fire Safety System
As the project is a plotted development, for fire fighting facility , individual owner can install their own system as per their need and local authority requirements
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not proposed in this phase
18Emergency Evacuation Services
As the project is a plotted development, individuals will take care of this at their own level
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 11 Mar 2026.

Sanctioned by Any Other Competent Authority · 2,641 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
244/20-2112 Mar 202111 Mar 202611 Mar 202912 Dec 2023
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
299(P), 300(P), 301(P)2641Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 14308
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Reply to queries raised by Authority along with the query letter
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New21 Aug 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Aug 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Aug 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Aug 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New10 Sept 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New10 Sept 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New10 Sept 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New10 Sept 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 Aug 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New21 Aug 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New21 Aug 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Aug 2021 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2023-Q3.

QuarterConstructionCertificates
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Kunj Bihari Infra
RolePromoter · current
RERA IDUPRERAPRM147780
PANAAUFK6466E
CIN / TANLKNK08645A
Registered addressQ1, South City Extension, Shahjahanpur
RERA contact
Registered since2021
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
KUNJ BIHARI INFRABankSTATE BANK OF INDIABranchKBSB SHAHJAHANPURA/C no.IFSCSBIN0004000
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Latest completion certificate filed on2026-09-14
first recorded by Estanzo
19 Sept 2026
Completion date recorded2026-09-14
first recorded by Estanzo
19 Sept 2026
When these facts last moved
Latest completion certificate filed onfirst recorded by Estanzo · 19 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about South City Extension Block-A

Is South City Extension Block-A RERA registered?

Yes. South City Extension Block-A is registered with UPRERA under registration number UPRERAPRJ757820, registered on 10 Sept 2021. Estanzo reproduces that filing; it does not verify the work behind it.

Has South City Extension Block-A been completed?

UPRERA still lists South City Extension Block-A as Registered, so it is not shown as completed here. A completion certificate dated 14 Sept 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of South City Extension Block-A?

M/s Kunj Bihari Infra is the promoter entity that filed South City Extension Block-A with UPRERA (promoter RERA ID UPRERAPRM147780). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does South City Extension Block-A have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is South City Extension Block-A located?

South City Extension Block-A is registered in Shahjahanpur, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗