South City Extension Block-A is a RERA-registered residential project by M/s Kunj Bihari Infra in Shahjahanpur (RERA ID UPRERAPRJ757820). Registered with a completion deadline of 12 Dec 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ757820 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 23 Mar 2021 |
| Original start | 23 Mar 2021 |
| Project duration | 33 months |
| Address | Shahjahanpur, Shahjahanpur |
| Tehsil | Shahjahanpur |
| Applicant type | Partnership Firm |
| Applicant address | Q1, South City Extension, Shahjahanpur |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
244/20-21
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 Sept 2021 |
| Original completion | 12 Dec 2023 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 14 Sept 2026 |
| Registration fee | ₹18,500 |
| Sanctioning authority | Any Other Competent Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots We have total 14 plots of different sizes, from 128.68 sq. mtr to 284.63 sq. mtr in this phase of the project. |
| 2 | Boundary Wall Boundary wall is proposed as part of the project. |
| 3 | Road Work From the main entrance gate, we have proposed CC road work throughout the entire project whose wideness ranges between 12 mtr 9 mtr, as approved by the prescribed authority, Shahjahanpur |
| 4 | Footpaths We will provide footpath on both side of the road with adequate width and beautiful pattern |
| 5 | Water Supply Including Drinking Water Facilities Not proposed in this phase |
| 6 | Sewer System Sewerage System shall be provided. All sewerage water shall be connected with the nearest Municipal Line. |
| 7 | Drain Drains shall be connected with all units, and all link drains shall be connected with the main drain, which shall be connected with the nearest Municipal drain. |
| 8 | Parks 396.40 sq. mtr. green areas are proposed throughout the whole project. |
| 9 | Tree Planting We will provide many types of trees in the entire project site |
| 10 | Design For Electric Supply Including Street Lighting We will design and implement the system as per local electricity board and will consider centralized transformer, HT Panel, LT Panel, Feeder Pillar, etc. |
| 11 | Community Buildings Not proposed in this phase |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewerage system shall be provided. All sewerage water shall be connected with the nearest Municipal Line |
| 13 | Solid Waste Management And Disposal System There are a proper garage collection area provided for the solid waste management as per Municipal Guidelines |
| 14 | Water Conservation System We will suggest individual to use low flow fixture as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED light fitting in the external area and street light |
| 16 | Fire Protection And Fire Safety System As the project is a plotted development, for fire fighting facility , individual owner can install their own system as per their need and local authority requirements |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not proposed in this phase |
| 18 | Emergency Evacuation Services As the project is a plotted development, individuals will take care of this at their own level |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 11 Mar 2026.
Sanctioned by Any Other Competent Authority · 2,641 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 244/20-21 | 12 Mar 2021 | 11 Mar 2026 | 11 Mar 2029 | 12 Dec 2023 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 299(P), 300(P), 301(P) | 2641 | Khasra |
| Sale deed · 14308 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Reply to queries raised by Authority along with the query letter An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 21 Aug 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 5 Aug 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 5 Aug 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 5 Aug 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 10 Sept 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 10 Sept 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 10 Sept 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 10 Sept 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 21 Aug 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 21 Aug 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 21 Aug 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 21 Aug 2021 ↗ |
Quarterly progress reports
12 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
12 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2023-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | M/s Kunj Bihari Infra |
| Role | Promoter · current |
| RERA ID | UPRERAPRM147780 |
| PAN | AAUFK6466E |
| CIN / TAN | LKNK08645A |
| Registered address | Q1, South City Extension, Shahjahanpur |
| RERA contact | |
| Registered since | 2021 |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | KUNJ BIHARI INFRABankSTATE BANK OF INDIABranchKBSB SHAHJAHANPURA/C no.IFSCSBIN0004000 |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Latest completion certificate filed on | 2026-09-14 first recorded by Estanzo | 19 Sept 2026 |
| Completion date recorded | 2026-09-14 first recorded by Estanzo | 19 Sept 2026 |
| Latest completion certificate filed on | first recorded by Estanzo · 19 Sept 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about South City Extension Block-A
Is South City Extension Block-A RERA registered?
Yes. South City Extension Block-A is registered with UPRERA under registration number UPRERAPRJ757820, registered on 10 Sept 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has South City Extension Block-A been completed?
UPRERA still lists South City Extension Block-A as Registered, so it is not shown as completed here. A completion certificate dated 14 Sept 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of South City Extension Block-A?
M/s Kunj Bihari Infra is the promoter entity that filed South City Extension Block-A with UPRERA (promoter RERA ID UPRERAPRM147780). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does South City Extension Block-A have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is South City Extension Block-A located?
South City Extension Block-A is registered in Shahjahanpur, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗