SUMMIT TWIN TOWER

UPRERARegistered

SUMMIT TWIN TOWER is a RERA-registered commercial project by HIGHNESS CONSTRUCTION in Lucknow (RERA ID UPRERAPRJ962033). Registered with a completion deadline of 7 Sept 2028. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ962033
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start8 Sept 2021
Project duration84 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typePartnership Firm
Applicant addressPlot No. 7 and 8, Kh. No. 49A, B, Shakti Paradise, Chak Malhauri, Malhour Road, Near Maan Kheda Tiraha, Chinhat, Lucknow, Uttar Pradesh 226028
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    COMMERCIALBUILDING/02879/LDA/BP/20-21/0839/01092821

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered19 Sept 2022
Original completion7 Sept 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹78,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 2 · 12 (from plan)
ConfigurationUnitsCarpet area
OTHER—724-1,888
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK A/SUMMIT TWIN TOWER · OTHER12—724-1,888
BLOCK B/ SUMMIT TWIN TOWER · OTHER9—783-1,328
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ALPANA BHARGAVA - JSR ARCHITECTURE AND INTERIORS
License CA/94/17216
PMC, C-67, DEFENCE COLONY, NEW DELHI, INDIA ,110024
Engineer
PARESH JOHRI - PARESH AND ASSOCIATES
20, CENTRAL LANE BABAR ROAD,NEW DELHI ,110001
Contractor
RAMLAKHAN GOND
S/O RAM PYARE LAL, CHAKDEIYA, HETIMPUR, DEVARIYA, U.P., 274006
Sr.Development work declared to RERA
1Demarcation of Plots
PROVIDED WITH REFERENCE TO MAP. SINCE IT IS A COMMERCIAL ONE , MAIN DEMARCATION IS DONE WITH AREA SPECIFIED
2Boundary Wall
PROVIDED WITH REFERENCE TO ADJACENT PLOT LINES AND AS APPROVED BY LAND DEVELOPMENT AUTHORITY . THE BOUNDARY WALL WILL BE HAVING WIDTH OF 3 FEET AND THE MATERIAL USED FOR BUILDING THE WALL WILL BE REINFORCED CEMENT CONCRETE (RCC).
3Road Work
INTERNAL ROADS WITH SETBACKS . THE WIDTH OF THE ROAD WILL BE 24 FEET AND THE MATERIAL USED WILL BE REINFORCED CEMENT CONCRETE (RCC).
4Footpaths
PROVIDED ALONGWITH INTERNAL ROAD .THE WIDTH OF FOOTPATH WILL BE 90CM AND THE HEIGHT OF THE FOOTPATH WILL BE 90 CM AS WELL AND WILL BE MADE OF REINFORCED CEMENT CONCRETE (RCC) MATERIAL .THE FOOTPATH WILL BE 90 CM ABOVE ROAD.
5Water Supply Including Drinking Water Facilities
PROVIDED OVERHEAD UNDERGROUND WATER TANKS ALONGWITH PUMPS FILTERS WITH MEDIUM DENSITY PIPING SYSTEM OF UPPC ALONG WITH PROPER RO SYSTEM IN PLACE.
6Sewer System
STP PLANT PROVIDED , WITH REINFORCED CEMENT CONCRETE (RCC) AND HUME PIPES . 1 TANK OF 180 KLD WILL BE AVAILABLE WITH 4 PUMPS.
7Drain
PROVIDED EXTERNAL AND INTERNAL DRAINAGE SYSTEM
8Parks
PROVIDED AS PER LANDSCAPE DESIGNS WITH PLEASANTLY LANDSCAPED AREAS ARUND THE BUILDING HAVING SMALL PLANTS AND TREES ALONG WITH MINIMUM 4 FOUNTAINS.
9Tree Planting
PROVIDED ALONGWITH PLOT BOUNDARY WALL AS PER LANDSCAPE DESIGNS . 2 TERRACE GARDENS ON HIGH FLOOR WITH PLEASANT VIEW OF GREEN PLANTS.
10Design For Electric Supply Including Street Lighting
PROVIDED AS PER NORMS AN ELECTRIC SCHEMATICAL LAYOUT IS BEING APPROVED AND WILL BE BUILT ACCORDINGLY WITH THE HELP OF 2 TRANSFORMERS OF 2000 KB AND 100 PERCENT BACKUP FACILITY FOR COMMON AND OFFICE AREAS WITH THE HELP OF 4 GENERATORS OF 3200 KWATT
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
PROVIDED AS PER NORMS
13Solid Waste Management And Disposal System
PROVIDING BIO COMPOSER FOR ORGANIC WASTE AND DUMPING YARD AND OUTSIDE DISPOSAL
14Water Conservation System
RECYCLED WATER FROM STP ( SEWEGE TREATMENT PLANT) IS PROPOSED FOR GARDENING AND FLUSHING, COOLING TOWERS
15Energy Management System Including Use of Renewable Energy
NOT APPLICABLE
16Fire Protection And Fire Safety System
PROVIDED AS PER NORMS AND NATIONAL BUILDING CODE 2016 .FIRE NOC IS ALSO ATTACHED . 1 PROPER FIRE FIGHTING PLANT WILL BE AVAILABLE IN THE BUILDING AS PER STANDARDS PROVIDED BY THE GOVERNMENT.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NOT APPLICABLE
18Emergency Evacuation Services
PROVIDED FIRE ESCAPE STAIRCASE REFUGE BELOW AND MIMINUM 4 EXIT GATES AT THE TIME OF EMERGENCY FOR EVACUATION.
19Other Miscellaneous Work
ELECTRONIC SURVEILLANCES , TOILETS WITH SPECIALLY DESIGNED TOILETS FOR PHYSICALLY HANDICAPPED AND PROPER SECURITY CHECK WITH THE HELP OF CLOSED CIRCUIT TELEVISION (CCTV) AT EVERY FLOOR.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 6 Oct 2026.

Sanctioned by Lucknow Development Authority · 6,758 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
COMMERCIALBUILDING/02879/LDA/BP/20-21/0839/010928217 Oct 20216 Oct 20267 Sept 20287 Sept 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
86758Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 2020367008826
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 2020367008826
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New25 Aug 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New2 Aug 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New2 Aug 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New2 Aug 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New2 Aug 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New2 Aug 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New2 Aug 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New2 Aug 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New19 Sept 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New27 Aug 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New2 Aug 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New25 Aug 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New29 Aug 2022 ↗

Quarterly progress reports

15 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

15 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2024-Q4.

QuarterConstructionCertificates
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameHIGHNESS CONSTRUCTION
RolePromoter · current
RERA IDUPRERAPRM177544
PANAAOFH4949M
CIN / TANLKNHO7233C
Registered addressPlot No. 7 and 8, Kh. No. 49A, B, Shakti Paradise, Chak Malhauri, Malhour Road, Near Maan Kheda Tiraha, Chinhat, Lucknow, Uttar Pradesh 226028
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameASHRAY VENTURES PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
Address402,4TH FLOOR, SHALIMAR TITANIUM VIBHUTIKHAND GOMTINAGAR LUCKNOW Lucknow UP 226010 INDIA
RERA contact

Nearby projects

Lucknow

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
H CONS COLLECTION AC-SUMMIT TWIN TOWERBankHDFC BANKBranchNADAN MAHAL ROADBranch address244/230, NADAN MAHAL RODA, YAHIAGANJ, LUCKNOW , U.P., 226004Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0003950
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
H CONS SEPERATE AC- SUMMIT TWIN TOWERBankHDFC BANKBranchNADAN MAHAL ROADBranch address244/230, NADAN MAHAL ROADBranch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0003950
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
H CONS RERA TRANS AC- SUMMIT TWIN TOWERBankHDFC BANKBranchNADAN MAHAL ROADBranch address244/230, NADAN MAHAL ROAD , YAHIAGANJ, LUCKNOW , U.P.226004Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0003950
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SUMMIT TWIN TOWER

Is SUMMIT TWIN TOWER RERA registered?

Yes. SUMMIT TWIN TOWER is registered with UPRERA under registration number UPRERAPRJ962033, registered on 19 Sept 2022. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SUMMIT TWIN TOWER?

The completion date filed with UPRERA is 7 Sept 2028. No completion certificate is on record yet.

Who is the builder of SUMMIT TWIN TOWER?

HIGHNESS CONSTRUCTION is the promoter entity that filed SUMMIT TWIN TOWER with UPRERA (promoter RERA ID UPRERAPRM177544). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does SUMMIT TWIN TOWER show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Does SUMMIT TWIN TOWER have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SUMMIT TWIN TOWER located?

SUMMIT TWIN TOWER is registered in Lucknow, as filed with UPRERA.

What configurations are available in SUMMIT TWIN TOWER?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SUMMIT TWIN TOWER?

The approved unit plan filed with UPRERA runs from 724 to 1,888 m² of carpet area (about 7,794 to 20,323 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗