SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB is a RERA-registered residential project by Sunworld Residency Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ11625). Registered with a completion deadline of 23 Jan 2030.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ11625 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 20 Jan 2017 |
| Original start | 20 Jan 2017 |
| Project duration | 157 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | Regd. - GH-01/C SECTOR - 168, NOIDA, Gautam Buddha Nagar, UP 201305 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- valid to
Permit revalidated
NOIDA/MU.VA.NI/III-268/1274
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 15 Aug 2017 |
| Original completion | 31 Dec 2021 |
| Revised completion | 23 Jan 2030 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹60,000 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK190 53%
- 4 BHK93 26%
- 5 BHK58 16%
- OTHER12 3%
- PENTHOUSE4 1%
| Configuration | Units | Carpet area |
|---|---|---|
| 5 BHK | 58 | 258-357 |
| 4 BHK | 93 | 155-330 |
| PENTHOUSE | 4 | 302-355 |
| 3 BHK | 190 | 118-218 |
| OTHER | 12 | 0-565 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| CLUB · OTHER | 2 | 2 | 457-565 |
| T5 · 5 BHK, OTHER | 30 | 60 | 0-357 |
| T7 · 4 BHK, PENTHOUSE, OTHER | 26 | 52 | 0-355 |
| T8 · 4 BHK, PENTHOUSE, OTHER | 26 | 53 | 0-355 |
| T9 · 3 BHK | 32 | 190 | 118-218 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots NA |
| 2 | Boundary Wall YES |
| 3 | Road Work YES |
| 4 | Footpaths YES |
| 5 | Water Supply Including Drinking Water Facilities YES |
| 6 | Sewer System YES |
| 7 | Drain YES |
| 8 | Parks YES |
| 9 | Tree Planting YES |
| 10 | Design For Electric Supply Including Street Lighting YES |
| 11 | Community Buildings YES |
| 12 | Treatment and Disposal System of Sewage and Sullage water YES |
| 13 | Solid Waste Management And Disposal System YES |
| 14 | Water Conservation System YES |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System YES |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 20 Jan 2022. 1 of them carries a revalidation, valid to 19 Jan 2027.
Sanctioned by Noida Authority · 10,957 sqm of land · an approved plan of 5 blocks and 357 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| NOIDA/MU VA NI/III-268/954 | 20 Jan 2017 | 20 Jan 2022 | 20 Jan 2027 | 31 Dec 2021 | — | |
| NOIDA/MU VA NI/III-268/954 | 20 Jan 2017 | 19 Jan 2022 | 23 Jan 2030 | 30 Jun 2022 | 24 Jan 2025 valid to 19 Jan 2027 as NOIDA/MU.VA.NI/III-268/1274 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 23 Jan 2030.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2021 | 30 Jun 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jun 2022 | 23 Jan 2030 | — |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| PLOT NO-GH-01/C | 10957 | — |
| GH-01/C | 40221 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 15 Aug 2017.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 123 | 15 Aug 2017 | self | — |
| Lease deed · 5947 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 24 Jan 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 24 Jan 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 24 Jan 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 24 Jan 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 24 Jan 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 24 Jan 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 24 Jan 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 24 Jan 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 28 Jan 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 24 Jan 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 28 Jan 2020 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 15 Aug 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 15 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | as per sanction plan |
| Fire safety (as filed with RERA) | as per sanction plan |
| Health service | as per sanction plan |
| Renewable energy | as per sanction plan |
| Other facilities | as per sanction plan |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
26 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
26 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 12.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 15.24% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 16.17% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 17.78% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 44.8% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Sunworld Residency Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM6829 |
| PAN | AAECB1359G |
| CIN / TAN | U70200UP2010PTC099023 |
| Name of chairman | Mr. ANIL AERY KUMAR Mr. RAGHUVIR Mr. DHARAMVEER SINGH |
| Registered address | Regd. - GH-01/C SECTOR - 168, NOIDA, Gautam Buddha Nagar, UP 201305 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | NIMBUS PROJECTS LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 1001-1006, 10TH FLOOR, NARAIN MANZIL, 23, BARAKHAMBA ROAD, NEW DELHI-110001 |
| RERA contact |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | NIMBUS PROJECTS LTD COLLECTION A/C FOR SUNWORLD ARISTA PH-2 T 5,7,8,9 CLUBBankICICI BANK LTDBranchICICI BANK LTD , SECTOR-168, NOIDABranch addressGH-1C, GROUND FLOOR, TOWER-10, SUNWORLD ARISTA, SECTOR-168, EXPRESSWAY NOIDA, GB NAGAR, NOIDA, UTTAR PRADESH-201305Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0005707Branch emailHanuman.pandey[at]icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | NIMBUS PROJECTS LTD SEPARATE BANK A/C FOR SUNWORLD ARISTA PH-2 T 5,7,8,9 CLUBBankICICI BANK LTDBranchICICI BANK LTD, SECTOR-168, NOIDABranch addressGH-1C, GROUND FLOOR, TOWER-10,SUNWORLD ARISTA, SECTOR-168, EXPRESSWAY NOIDA, GB NAGAR, NOIDA, UTTAR PRADESH-201305Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0005707Branch emailhanuman.pandey[at]icicibank.com |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | NIMBUS PROJECTS LTD RERA TRANSACTION A/C FOR SUNWORLD ARISTA PH-2 T 5,7,8,9 CLUBBankICICI BANK LTDBranchICICI BANK LTD, SECTOR-168, NOIDABranch addressGH-1C, GROUND FLOOR, TOWER-10, SUNWORLD ARISTA, SECTOR-168, EXPRESSWAY NOIDA, GB NAGAR, NOIDA, UTTAR PRADESH-201305Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0005707Branch emailHanuman.pandey[at]icicibank.com |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
Common questions about SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB
Is SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB RERA registered?
Yes. SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB is registered with UPRERA under registration number UPRERAPRJ11625, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB?
The completion date filed with UPRERA is 23 Jan 2030. No completion certificate is on record yet.
Who is the builder of SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB?
Sunworld Residency Private Limited is the promoter entity that filed SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB with UPRERA (promoter RERA ID UPRERAPRM6829). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB more time to complete?
UPRERA's record carries 2 completion extensions for SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB, the latest running to 23 Jan 2030. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB located?
SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB?
The unit plan filed with UPRERA lists 5 BHK, 4 BHK, PENTHOUSE, 3 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB?
The approved unit plan filed with UPRERA runs from 118 to 565 m² of carpet area (about 1,267 to 6,078 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB?
The approved unit plan describes 5 blocks and 357 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SUNWORLD ARISTA (PH-2 T-5,7,8,9), CLUB?
About 132 units per acre: 357 planned units across 2.71 acres (10,957 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗