Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3924
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Feb 2017
Project duration101 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressA-6, Ground Floor, Yojana Vihar, Delhi-110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP/38785/620

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion31 Dec 2024
Revised completion30 Jun 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary22 May 2025
Registration fee₹1,10,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,253 · 2 · 18 (units from plan)
Homes · commercial units490 · 763 (shops and offices filed in the same plan)
  • SHOP763 61%
  • OTHER320 26%
  • STUDIO170 14%
ConfigurationUnitsCarpet area
SHOP7632-107
OTHER3209-24
STUDIO17026-27
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Corpo Fair · OTHER, STUDIO124859-27
Fashion Fair · SHOP, OTHER67682-165
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 164.5 m² for a OTHER, 135.67 m² for a OTHER, 351.9 m² for a OTHER and 12 other units like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Gian P Mathur & Associates
C-55, East Of Kailash Delhi-110065
Engineer
Keen Designers Pvt Ltd
H-53, First Floor, Sector-63, Noida-201301
Contractor
Kamal & Associates Pvt Ltd
Plot No.1, LSC Market, 3rd Floor, Mayur Vihar-2, Delhi-110091
Sr.Development work declared to RERA
1Demarcation of Plots
Corner 24 mtr ,60 mtr / Corner 60 mtr,130 mtr / Corner 130 mtr,/ Adjoining property C-4B,sec-16B, / Corner Adjoining property C-4B,sec-16B, 24 mtr
2Boundary Wall
Planters forms the Low Height Boundary walls on all sides
3Road Work
Two Gates (Entry/Exit) have been planned for Project connecting it to access roads. Project is bounded by roads on three sides.
4Footpaths
Internal walkways shall be finished by a combination of Stones, Pavers and Heavy duty tiles
5Water Supply Including Drinking Water Facilities
Drinking water shall be provided by GNIDA and system established at Project consists of 350 KL storage in Underground tanks. Besides Underground tank, separate Overhead Tanks for Drinking water and Recycled water have been provided
6Sewer System
Sewer Treatment plant Capacity 350 KLD is being established along with Separate Pump House
7Drain
Storm water drainage has been provided by GNIDA along the access roads as per standard road sections
8Parks
Landscaped areas shall be provided as per approved plan
9Tree Planting
65 trees shall be planted as per approved plan
10Design For Electric Supply Including Street Lighting
The Electricity is being supplied by NPCL. The proposed load is 4136 KW. Accordingly, adequate Electrical system shall be established at site consisting of Transformers and Power back-up through DG sets
11Community Buildings
None
12Treatment and Disposal System of Sewage and Sullage water
Sewer Treatment plant Capacity 350 KLD is being established along with Separate Pump House. Storm water drainage has been provided by GNIDA along the access roads as per standard road sections
13Solid Waste Management And Disposal System
Solid waste shall be managed by approved vendors
14Water Conservation System
It is being proposed to establish adequate no of Rain water harvesting pits at site. Moreover, Sewer Treatment plant of Capacity 350 KLD is being established along with Separate Pump House to recycle water from building. Water efficient fixtures shall be used to limit the use of water
15Energy Management System Including Use of Renewable Energy
All lighting shall be through energy efficient LED lighting. The building is being developed on High street concept to do away with central air-conditioning thereby reducing the energy requirement of the project. A part of energy requirement shall be met with Solar energy Panels
16Fire Protection And Fire Safety System
Fire Fighting network is being established consisting of Fire fighting tank ( Capacity 200 KL ), Pump House, Fire escapes in each Tower, Fire Hydrant, Yard Hydrants and Fire sprinklers to tackle Fire hazards.
17Social Infrastructure And Other Public Amenities Including Public Health Services
And Other Public Amenities Including Public Health Services: Following facilities are available within close vicinity of commercial site. 1) Police Chowki across the road. 2) A no of Schools and Colleges are operational at walking distance away. 3) Electric sub-station within 500m. 4) Proposed Metro station –Ecotech-12 within 500 m from site. 5) Plot is located along Main Carriage-way ( 130 mtr wide road). 6) Electricity , water line and sewer line have been laid upto site
18Emergency Evacuation Services
Six staircases have been provided from different areas. Adequate open area at Ground floor has been provided as per approved plan. Higher setbacks have been left on all sides varying from 9 to 15 m
19Other Miscellaneous Work
None
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
2WEALTH CLINIC PRIVATE LIMITEDUPRERAAGT10521
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 1 Feb 2022.

Sanctioned by Greater Noida Authority · 10,000 sqm of land · an approved plan of 2 blocks and 1253 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/BP/38785/6201 Feb 20171 Feb 202231 Dec 202431 Dec 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2025.

#Granted fromExtended uptoNote
131 Dec 202430 Jun 2025Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
C-04A, Sector-16B, Greater Noida West10000Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 31 Mar 2016.

Registry no.DateTypeArea
I-2001231 Mar 2016self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 1/7643/16
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · GNIDA/Commercial/2016/3541
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New27 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New28 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New28 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New28 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New27 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New2 Aug 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New30 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Aug 2018 ↗

Quarterly progress reports

21 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

21 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMaheshwari Infratech Private Limited
RolePromoter · current
RERA IDUPRERAPRM2702
PANAAHCM8078L
CIN / TANU7010DL2012PTC233281
Name of chairmanManish Gupta
Registered addressA-6, Ground Floor, Yojana Vihar, Delhi-110092
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Fusion Buildtech Private Limited Collection A/c for U FairiaBankICICI Bank LtdBranchCherry CountyBranch addressShop No. 9A-9B, GH-05B, Techzone-4, Greater Noida WestBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0004146Branch emailchaudhary.ankushaticicibannk.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Maheshwari Infratech Pvt LtdBankHDFC Bank LtdBranchAnand ViharBranch addressA-38, Anand Vihar Delhi-110092Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001668
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Fusion Buildtech Private Limited RERA Transaction A/c for U FairiaBankICICI Bank LtdBranchCherry CountyBranch addressShop No. 9A-9B, GH-05B, Techzone-4, Greater Noida WestBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0004146Branch emailchauhary.ankushaticicibank.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)28 (Under Registration - 2 ) → 28 (Under Registration - 0 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)27 (Under Registration - 1 ) → 28 (Under Registration - 2 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)26 (Under Registration - 0 ) → 27 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 25 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about U:Fairia

Is U:Fairia RERA registered?

Yes. U:Fairia is registered with UPRERA under registration number UPRERAPRJ3924, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has U:Fairia been completed?

UPRERA still lists U:Fairia as Registered, so it is not shown as completed here. A completion certificate dated 22 May 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of U:Fairia?

Maheshwari Infratech Private Limited is the promoter entity that filed U:Fairia with UPRERA (promoter RERA ID UPRERAPRM2702). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted U:Fairia more time to complete?

UPRERA's record carries 1 completion extension for U:Fairia, the latest running to 30 Jun 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does U:Fairia have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is U:Fairia located?

U:Fairia is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in U:Fairia?

The unit plan filed with UPRERA lists SHOP, OTHER and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in U:Fairia?

The approved unit plan filed with UPRERA runs from 2 to 107 m² of carpet area (about 22 to 1,151 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in U:Fairia?

The approved unit plan describes 2 blocks and 1,253 units of which 490 are homes and 763 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is U:Fairia?

About 507 units per acre: 1,253 planned units across 2.47 acres (10,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗