VICTORY GOLD is a RERA-registered residential project by anil gupta in Ghaziabad (RERA ID UPRERAPRJ10458). RERA status: Abeyance. Data as reported by UP-RERA. as reported by UPRERA
RERA status as reported: Abeyance.Basic details
Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ10458 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | AbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 20 Dec 2016 |
| Original start | 20 Dec 2016 |
| Project duration | 66 |
| Address | Ghaziabad, Ghaziabad |
| Applicant type | Individual |
| Applicant address | 519 paschim vihar new delhi |
| Applicant contact | 7042488900 · rahul.sharma@victoryinfra.com |
Registration & timeline
Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.
| RERA registered | 14 Aug 2017 |
| Promised completion | 20 Dec 2021 |
| Revised completion | 19 Jun 2022 |
| Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹40,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.
- 3 BHK231 73%
- 2 BHK84 27%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 231 | 77-99 |
| 2 BHK | 84 | 55-56 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| TOWER A-3 · 3 BHK, 2 BHK | 19 | 150 | 55-99 |
| TOWER A-4 · 3 BHK, 2 BHK | 19 | 165 | 55-99 |
Project team & development works
The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots By fixing co-ordinate point with all dimensions and tangents as per given approved drawings. |
| 2 | Boundary Wall NA |
| 3 | Road Work R.C.C Road Finishing (trimix) 9.0 m wide will be Provided. |
| 4 | Footpaths 1.5 m wide path with interlocking tiles finishing will be Provided. |
| 5 | Water Supply Including Drinking Water Facilities Bore-well water, government supply line facilities .From U.G. Tanks will be treated water to Over Head Tank and from Over Head Tank to individual flats services. |
| 6 | Sewer System S.T.P System will Provide |
| 7 | Drain All rain water collected through collected chambers will be provided as per requirement. |
| 8 | Parks NA |
| 9 | Tree Planting Tree will be provided as per requirement. |
| 10 | Design For Electric Supply Including Street Lighting From UPPCL to Meter Room and line will be connected to HT Panel Room then Divided in LT Panel for all the towers area . |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water S.T.P System |
| 13 | Solid Waste Management And Disposal System Disposal as per norms Premises. |
| 14 | Water Conservation System Rain water Harvesting will be Provided as per requirement. |
| 15 | Energy Management System Including Use of Renewable Energy Not provided |
| 16 | Fire Protection And Fire Safety System All Fire equipment will be providing in towers and all basements. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services All safety norms and related equipment will be providing |
| 19 | Other Miscellaneous Work NIL |
Permits & extensions
2 permits
A permit shows an approval and the date it runs to, not that work matching it has been done.
2 sanctioning permits are on record with UPRERA, the latest valid to 30 Jun 2019.
| Permit no. | Date | Valid upto | Extendable upto | Revised end |
|---|---|---|---|---|
| 65/ZONE - 5 / 2014-15 | 1 Jul 2014 | 30 Jun 2019 | 30 Jun 2022 | 20 Dec 2021 |
| 65/ZONE - 5 / 2014-15 | 1 Jul 2014 | 30 Jun 2019 | 30 Jun 2022 | 20 Dec 2021 |
UPRERA’s record carries 1 completion extension for this project, running to 19 Jun 2022.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 20 Dec 2021 | 19 Jun 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
31 filings
What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot No. -GH-02 NH-24 Village-Shahpur bamehta Ghaz | 7084 | — |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 5 Feb 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 750 | 5 Feb 2015 | self | — |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | not reported | — |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 31 Jul 2018 ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | Old | 14 Aug 2017 ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | Old | 14 Aug 2017 ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | Old | 14 Aug 2017 ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | Old | 14 Aug 2017 ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | Old | 14 Aug 2017 ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | Old | 14 Aug 2017 ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | Old | 14 Aug 2017 ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | Old | 14 Aug 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 14 Aug 2017 ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | Old | 14 Aug 2017 ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | Old | 14 Aug 2017 ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | Old | 14 Aug 2017 ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | Old | 14 Aug 2017 ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | Old | 14 Aug 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 14 Aug 2017 ↗ |
Facilities
as declared to RERA
What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | yes |
| Fire safety (as filed with RERA) | yes |
| Health service | yes |
| Renewable energy | yes |
| Other facilities | yes |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Data as reported by UPRERAPromoter (SPV) details
The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.
| Legal name | anil gupta |
| Role | primary · current |
| RERA ID | UPRERAPRM20131 |
| PAN | AGXPG5693c |
| Registered address | 519 paschim vihar new delhi |
| RERA contact | rahul.sharma@victoryinfra.com · 7042488900 |
| Registered since | 2017 |
RERA bank accounts
verify before payment
Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | CURRENTBankSBIBranchPITAMPURAA/C no.00000035725314696IFSCSBIN0004381 |
What has changed on this record
nothing recorded yet
A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
Common questions about VICTORY GOLD
Is VICTORY GOLD RERA registered?
Yes. VICTORY GOLD is registered with UPRERA under registration number UPRERAPRJ10458, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for VICTORY GOLD?
The completion date filed with UPRERA is 19 Jun 2022. No completion certificate is on record yet.
Who is the builder of VICTORY GOLD?
anil gupta is the promoter entity that filed VICTORY GOLD with UPRERA (promoter RERA ID UPRERAPRM20131). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted VICTORY GOLD more time to complete?
UPRERA's record carries 1 completion extension for VICTORY GOLD, the latest running to 19 Jun 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does VICTORY GOLD have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is VICTORY GOLD located?
VICTORY GOLD is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in VICTORY GOLD?
The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in VICTORY GOLD?
The approved unit plan filed with UPRERA runs from 55 to 99 m² of carpet area (about 590 to 1,065 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in VICTORY GOLD?
The approved unit plan describes 2 blocks and 315 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is VICTORY GOLD?
About 180 units per acre: 315 planned units across 1.75 acres (7,084 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, last collected 10 Aug 2026. official source ↗