VICTORY GOLD

UPRERAAbeyanceupdated 10 Aug 2026

VICTORY GOLD is a RERA-registered residential project by anil gupta in Ghaziabad (RERA ID UPRERAPRJ10458). RERA status: Abeyance. Data as reported by UP-RERA. as reported by UPRERA

RERA status as reported: Abeyance.
Project cost
60
Land area
7,084 1.75 acres
Units (from plan)
315
Density (derived)
180 /acre
Towers (from plan)
2
Config
2 BHK/3 BHK
Carpet
55-99
Registered
14 Aug 2017

Basic details

Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ10458
Project categoryResidential
Registration typeOngoing
RERA statusAbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start20 Dec 2016
Original start20 Dec 2016
Project duration66
AddressGhaziabad, Ghaziabad
Applicant typeIndividual
Applicant address519 paschim vihar new delhi
Applicant contact7042488900 · rahul.sharma@victoryinfra.com

Registration & timeline

Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.

RERA registered14 Aug 2017
Promised completion20 Dec 2021
Revised completion19 Jun 2022
Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹40,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.

Total units · towers · floors315 · 2 · 19 (units from plan)
  • 3 BHK231 73%
  • 2 BHK84 27%
ConfigurationUnitsCarpet area
3 BHK23177-99
2 BHK8455-56
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER A-3 · 3 BHK, 2 BHK1915055-99
TOWER A-4 · 3 BHK, 2 BHK1916555-99
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.

Architect
GIAN P MATHUR
License 80/5769
C 55 EOK
Engineer
ABHA
C 55 EOK
Contractor
ANSH ENTERPRISES
SECTOR 168 NOIDA
Sr.Development work declared to RERA
1Demarcation of Plots
By fixing co-ordinate point with all dimensions and tangents as per given approved drawings.
2Boundary Wall
NA
3Road Work
R.C.C Road Finishing (trimix) 9.0 m wide will be Provided.
4Footpaths
1.5 m wide path with interlocking tiles finishing will be Provided.
5Water Supply Including Drinking Water Facilities
Bore-well water, government supply line facilities .From U.G. Tanks will be treated water to Over Head Tank and from Over Head Tank to individual flats services.
6Sewer System
S.T.P System will Provide
7Drain
All rain water collected through collected chambers will be provided as per requirement.
8Parks
NA
9Tree Planting
Tree will be provided as per requirement.
10Design For Electric Supply Including Street Lighting
From UPPCL to Meter Room and line will be connected to HT Panel Room then Divided in LT Panel for all the towers area .
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
S.T.P System
13Solid Waste Management And Disposal System
Disposal as per norms Premises.
14Water Conservation System
Rain water Harvesting will be Provided as per requirement.
15Energy Management System Including Use of Renewable Energy
Not provided
16Fire Protection And Fire Safety System
All Fire equipment will be providing in towers and all basements.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
All safety norms and related equipment will be providing
19Other Miscellaneous Work
NIL
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

A permit shows an approval and the date it runs to, not that work matching it has been done.

2 sanctioning permits are on record with UPRERA, the latest valid to 30 Jun 2019.

Permit no.DateValid uptoExtendable uptoRevised end
65/ZONE - 5 / 2014-151 Jul 201430 Jun 201930 Jun 202220 Dec 2021
65/ZONE - 5 / 2014-151 Jul 201430 Jun 201930 Jun 202220 Dec 2021
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 19 Jun 2022.

#Granted fromExtended uptoNote
120 Dec 202119 Jun 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

31 filings

What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot No. -GH-02 NH-24 Village-Shahpur bamehta Ghaz7084
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 5 Feb 2015.

Registry no.DateTypeArea
7505 Feb 2015self
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
not reported
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
not reported
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jul 2018
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
Old14 Aug 2017
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
Old14 Aug 2017
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
Old14 Aug 2017
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
Old14 Aug 2017
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
Old14 Aug 2017
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
Old14 Aug 2017
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
Old14 Aug 2017
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
Old14 Aug 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old14 Aug 2017
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
Old14 Aug 2017
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
Old14 Aug 2017
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
Old14 Aug 2017
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
Old14 Aug 2017
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
Old14 Aug 2017
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old14 Aug 2017

Facilities

as declared to RERA

What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking wateryes
Fire safety (as filed with RERA)yes
Health serviceyes
Renewable energyyes
Other facilitiesyes

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Data as reported by UPRERA

Promoter (SPV) details

The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.

Legal nameanil gupta
Roleprimary · current
RERA IDUPRERAPRM20131
PANAGXPG5693c
Registered address519 paschim vihar new delhi
RERA contactrahul.sharma@victoryinfra.com · 7042488900
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details - public record, shown as reported by UPRERA. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
CURRENTBankSBIBranchPITAMPURAA/C no.00000035725314696IFSCSBIN0004381
Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about VICTORY GOLD

Is VICTORY GOLD RERA registered?

Yes. VICTORY GOLD is registered with UPRERA under registration number UPRERAPRJ10458, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for VICTORY GOLD?

The completion date filed with UPRERA is 19 Jun 2022. No completion certificate is on record yet.

Who is the builder of VICTORY GOLD?

anil gupta is the promoter entity that filed VICTORY GOLD with UPRERA (promoter RERA ID UPRERAPRM20131). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted VICTORY GOLD more time to complete?

UPRERA's record carries 1 completion extension for VICTORY GOLD, the latest running to 19 Jun 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does VICTORY GOLD have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is VICTORY GOLD located?

VICTORY GOLD is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in VICTORY GOLD?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in VICTORY GOLD?

The approved unit plan filed with UPRERA runs from 55 to 99 m² of carpet area (about 590 to 1,065 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in VICTORY GOLD?

The approved unit plan describes 2 blocks and 315 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is VICTORY GOLD?

About 180 units per acre: 315 planned units across 1.75 acres (7,084 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, last collected 10 Aug 2026. official source ↗