Vidhi Estate Extension 2nd is a RERA-registered residential project by Shashikala Infratech Private Limited in Rahmat Nagar, Lucknow (RERA ID UPRERAPRJ848416). Registered with a completion deadline of 5 Nov 2028.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ848416 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 1 Jan 2026 |
| Project duration | 35 months |
| Address | Khasra No. 747 and 748, Village Rahmat Nagar, Tehsil Mohanlalganj, District Lucknow, Rahmat Nagar, Mohanlalganj, Lucknow |
| Tehsil | Mohanlalganj |
| Applicant type | Company |
| Applicant address | FLAT NO. 105, ROYAL PLAZA, SUSHANT GOLF CITY, SULTANPUR ROAD, ANSAL API, Sushant Golf City, Lucknow, Lucknow, Uttar Pradesh, India, 226030 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
720/Naksha/Zila Panchayat/2025-2026
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 17 Feb 2026 |
| Original completion | 5 Nov 2028 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹36,500 |
| Sanctioning authority | Any Other Competent Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots We have a plot size of 6290.00 sq meter in which we will demarcate total 38 residential plots and demarcation will be done through brick work |
| 2 | Boundary Wall 2 meter high ready made boundary wall with 127mm pillar at the center of boundary wall there will be a logo of project |
| 3 | Road Work 1406.66 sq. meter asphalt road will be used in this project as suggested by Architect |
| 4 | Footpaths Footpath will be of 1.5 meter wide and sarrounded to park |
| 5 | Water Supply Including Drinking Water Facilities Water supply will be provide under head water tank with two numbers of pumps for the requirement of blocking through underground pipelines. Water supply shall be done till park area drinking water facility to be done by residents. |
| 6 | Sewer System The project is equipped with the centralized sewerage system which directed to the sewer treatment plant for through treatment following treatment will be recycled and used to other purposes |
| 7 | Drain A strom water will be implemented to manage strom water from the roads and other landscape areas the strom water will be connected rain water harvesting |
| 8 | Parks There will be a dedicate areas for Park of 960.30 sq meter |
| 9 | Tree Planting We will plant diffrent varities of plants in the green areas |
| 10 | Design For Electric Supply Including Street Lighting We will designed the system as per Local Electricicty board and consider a centrlized transformer panel and LT panel feeder pillar |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water A centralized sewerage system of will be used in this project and channel will be connected to STP |
| 13 | Solid Waste Management And Disposal System This project will have a particular zone to collect waste and dustbin will be provided by the promoter in every areas for collection |
| 14 | Water Conservation System a well designed water harvesting system will be used for green areas |
| 15 | Energy Management System Including Use of Renewable Energy We will not provide energy management system |
| 16 | Fire Protection And Fire Safety System All fire norms will be followed as per NBC Code and approval of fire department |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 5 Nov 2028.
Sanctioned by Any Other Competent Authority · 6,290 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 720/Naksha/Zila Panchayat/2025-2026 | 6 Nov 2025 | 5 Nov 2028 | 5 Nov 2028 | 5 Nov 2028 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
32 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 747 | 90.00 | Khasra |
| 748 | 6200.00 | Khasra |
| Registry document · 40162 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 18485 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 40164 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · Dhara 80 Order, 747 and 748 Khatauni An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Certified copy of khatauni 748 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Certified Copy of Khatauni 747 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| General body resolution The resolution authorising an apartment owners’ association to act as the registering entity. | not reported | — |
| Affidavit on balance development work The promoter’s sworn statement about the development work still to be finished. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 12 Jan 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 22 Dec 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 22 Dec 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 22 Dec 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 12 Jan 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 12 Jan 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 12 Jan 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 22 Jan 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 22 Dec 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 4 Feb 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 24 Dec 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 12 Jan 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 22 Dec 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 6 Feb 2026 ↗ |
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2025-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q4 | 5% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 7.2% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Shashikala Infratech Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM262700 |
| PAN | AAYCS6225N |
| CIN / TAN | U45200UP2017PTC092937 |
| Name of chairman | JITENDRA KUMAR MISHRA |
| Registered address | FLAT NO. 105, ROYAL PLAZA, SUSHANT GOLF CITY, SULTANPUR ROAD, ANSAL API, Sushant Golf City, Lucknow, Lucknow, Uttar Pradesh, India, 226030 |
| RERA contact | |
| Registered since | 2023 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Shashikala Infratech Pvt Ltd Collection AC Vidhi Estate Extension 2ndBankICICI BankBranchLucknow ArjunganjBranch addressGround Floor and Mezzanine Center Point MI Retreat Center 2, Arjunganj, Sarsawan, Lucknow U.P. 226016Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0005959Branch emailvinay.tandon@icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Shashikala Infratech Pvt Ltd Separate AC Vidhi Estate Extension 2ndBankICICI BankBranchLucknow ArjunganjBranch addressGround Floor and Mezzanine Center Point MI Retreat Center 2 Arjunganj, Sarsawan, Lucknow U.P. 226016Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0005959 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Shashikala Infratech Pvt Ltd RERA Transaction AC Vidhi Estate Extension 2ndBankICICI BankBranchLucknow ArjunganjBranch addressGround Floor and Mazzanine Center Point MI Retreat Center 2 Arjungnaj Sarsawan Lucknow U.P. 226016Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0005959 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Vidhi Estate Extension 2nd
Is Vidhi Estate Extension 2nd RERA registered?
Yes. Vidhi Estate Extension 2nd is registered with UPRERA under registration number UPRERAPRJ848416, registered on 17 Feb 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Vidhi Estate Extension 2nd?
The completion date filed with UPRERA is 5 Nov 2028. No completion certificate is on record yet.
Who is the builder of Vidhi Estate Extension 2nd?
Shashikala Infratech Private Limited is the promoter entity that filed Vidhi Estate Extension 2nd with UPRERA (promoter RERA ID UPRERAPRM262700). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Vidhi Estate Extension 2nd have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Vidhi Estate Extension 2nd located?
Vidhi Estate Extension 2nd is registered in Rahmat Nagar, Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗