VRINDA HOMES-2

UPRERARegistered

VRINDA HOMES-2 is a RERA-registered residential project by SHUBHHOMES REALCON PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ640924). Registered with a completion deadline of 31 Dec 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Jul–Sep 2025
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'23
—Q1'24
—Q2'24
100%Q3'24
100%Q4'24
100%Q1'25
100%Q2'25
100%Q3'25

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ640924
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Jan 2019
Project duration84 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address11, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    658/ZONE-5/2013-14 DATED 21.05.2014 AND MAP20181129123725063 DATED 14.03.2019

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Nov 2021
Original completion31 Dec 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary9 Mar 2024
Registration fee₹30,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors546 · 1 · 13 (units from plan)
ConfigurationUnitsCarpet area
OTHER54623-31
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
EWS/LIG BLOCK · OTHER1354623-31
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
UDAY PANDE FOR NIVEDITA AND UDAY PANDE CONSULTANTS
License CA/87/10856
B-224, Okhla Industrial Area, Phase-I, New Delhi-110020
Engineer
GULAM SARWAR FOR KEEN ASSOCIATES PVT. LTD.
FIRST FLOOR, H-53, OPP. VIJAYA BANK, COMMERCIAL AREA. SECTOR-63, NOIDA, UTTAR PRADESH-201301
Contractor
Shoraj Singh For SLM CONTRACTS PVT. LTD.
HS-32, 2nd Floor, Kailash Colony Market, New Delhi-110048
Sr.Development work declared to RERA
1Demarcation of Plots
ENCLOSED WITH BOUNDARY WALL HAVING HEIGHT OF 2.40 MTR. AND CONCERTINA WIRE HAVING HEIGHT OF 0.6 MTR. ABOVE BOUNDARY WALL.
2Boundary Wall
COMBINATION OF RCC COLOUMN WITH BRICK WORK, PLASTER/PAINT.
3Road Work
ROAD PATTERN IS PROVIDED IN SUCH A WAY THAT APPROACH TO TOWER IS MOTORABLE AND SECTION CONSISTS OF SUB GRADE PREPARATION WITH 1 LAYER GSB AND 1 LAYER OF WMM AND BLACK TOP/ CEMENT CONCRETE PAVEMENT.
4Footpaths
COMBINATION OF KERB STONE/ PAVERS/ MOSAIC GRIT ON COMPACTED SUB GRADE.
5Water Supply Including Drinking Water Facilities
SYSTEM FOR DRINKING WATER IS GROUND WATER AND PROVIDED THROUGH UNDERGROUND/ OVERHEAD WATER TANKS SUBJECT TO PAYMENT OF CHARGES, AS APPLICABLE.
6Sewer System
HOUSEHOLD SEWERAGE IS COLLECTED THROUGH SEWAGE LINE UPTO THE COMMON STP ESTABLISHED FOR THE PROJECT AND AFTER TREATMENT, THE SLUDGE AND TREATED WATER OBTAINED SHALL BE USED GREEN AREAS AND ALSO FOR FLUSHING LINES.
7Drain
RAIN WATER COLLECTION SHALL BE DONE FROM TERRACE THROUGH STORM WATER LINES/ COVERED DRAINS AT GROUND LEVEL AND CONNECTED TO RAIN HARVESTING PITS.
8Parks
PROVISION OF GREEN AREA FOR ENTIRE URBAN HOMES INCLUDING THIS PROJECT.
9Tree Planting
PLANNED TREES ARE 25 NOS. ACCORDINGLY IN OPEN AREAS AND ALONG SIDE THE BOUNDARY WALL, DIFFERENT TYPES OF TREES ARE PROVIDED.
10Design For Electric Supply Including Street Lighting
ELCTRICAL CONNECTION FOR THE ENTIRE URBAN HOMES INCLUDING THIS PROJECT FROM PVVNL OF ITS LICENCEE/SUB LICENCEE AND CONNECTION WILL BE PROVIDE TO CUSTOMERS THROUGH PREPAID METER AND PROPORTIONATE ELECTRICITY INFRASTRUCTURE COST INCLUDING FEDER CONSTRUCTIONS EXPENSES, SUB STATIONS/ PANELS/TRANSFORMERS/ OTHER EQUIPMENTS/ EXPENSES CABLING, EXPENSES SYSTEM LOADING CHARGES, SECURITY CHARGES ETC. AS APPLICABLE AND FURTHER SUBJECT TO FIXED ELECTRICITY CHARGES, USAGE/CONSUMPTION CHARGES AND ENERGY LOSSES/ LINE DISTRIBUTION LOSSES AND PAYMENT OF TAXES/CESS /DUTIES/LEVY AS APPLICABLE WILL BE PAID BY CUSTOMERS AS PER DEMAND FROM TIME TO TIME
11Community Buildings
NILL
12Treatment and Disposal System of Sewage and Sullage water
STP PROVIDED FOR TREATING HOUSEHOLDS SEWERAGE AND THE TREATED SLUDGE/ WATER IS BEING USED FOR GREEN AREAS AND FLUSHING SYSTEM FOR ENTIRE URBAN HOMES INCLUDING THIS PROJECT.
13Solid Waste Management And Disposal System
HOUSE TO HOUSE COLLECTION SYSTEM HAS BEEN PROVIDED WITH AND ARRANGEMENT OF SEPARATE COLLECTION OF DECOMPOSABLE AND NON DECOMPOSABLE WASTE IN SEPARATE BAGS AND A TREATMENT ARRANGEMENT IS DONE FOR SAME.
14Water Conservation System
UNDER GROUND RECHARGE PITS WITH PERFORATED FILTER MEDIA SUED FOR RAIN WATER HARVESTING PROVIDED.
15Energy Management System Including Use of Renewable Energy
N.A.
16Fire Protection And Fire Safety System
VERTICAL RISERS WITH FHC SHOFT, MOEFA WITH PA SYSTEM AND A PUMP ROOM WITH A PROVISION OF JOCKEY/ MAIN/DIESEL PUMP ETC. IS DONE FOR ENTIRE URBAN HOMES PROJECT.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NILL.
18Emergency Evacuation Services
FIRE STAIRECASE PROVIDED.
19Other Miscellaneous Work
N.A.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ANAROCK Property Consultants Private LimitedUPRERAAGT10265
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 13 Mar 2024.

Sanctioned by Ghaziabad Development Authority · 5,090 sqm of land · an approved plan of 1 block and 546 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
658/ZONE-5/2013-14 DATED 21.05.2014 AND MAP20181129123725063 DATED 14.03.201914 Mar 201913 Mar 202413 Mar 202731 Dec 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
22431367Khasra
2243273Khasra
22441267Khasra
2244253Khasra
22462660Khasra
2247500Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 3535
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3481
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 5131
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1424-1429
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New22 Oct 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New22 Oct 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New22 Oct 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New22 Oct 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New22 Oct 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Oct 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Oct 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Oct 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 Oct 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New29 Oct 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New29 Oct 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Oct 2021 ↗

Quarterly progress reports

22 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

22 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2100%CA ↗ · Arch ↗ · Eng ↗
2024-Q3100%CA ↗ · Arch ↗ · Eng ↗
2024-Q4100%CA ↗ · Arch ↗ · Eng ↗
2025-Q1100%CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q2. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSHUBHHOMES REALCON PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM1504
PANAABCE7746B
CIN / TANU45400DL2007PTC163142
Name of chairmanMRS. UMA AGARWAL
Registered address11, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameUTILITY ESTATES PRIVATE LIMITED
RoleCo-promoter · current
RERA IDUPRERAPRM1595
Applicant typeCompany
PANAAACU5134E
CIN / TANU45202DL2001PTC113391
Name of chairmanMR. BIR SINGH PUNDIR
Registered address10, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092
RERA contact
Registered since2017

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SHUBHHOMES REALCON PVT. LTD. -COLLECTION ACCOUNT FOR VRINDA HOMES 2BankHDFC BANK LIMITEDBranchPREET VIHAR BRANCH, LSC-19 AND 20, BLOCK-A, DELHI-110092Branch addressLSC -19 AND 20, BLCOK-A, PREET VIHAR BRANCH, DLEHI-110092,Branch districtGhaziabadA/C no.IFSCHDFC0001350
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SHUBHHOMES REALCON PVT. LTD. RERA PROJECT ESCROW A/C VRINDA HOMES 2BankHDFC BANK LIMITEDBranchPREET VIHAR BRANCH, LSC -19 AND 20, BLOCK-A, DELHI-110092Branch addressLSC -19 AND 20, BLOCK-A, PREET VIHAR BRANCH, DELHI-110092Branch districtGhaziabadA/C no.IFSCHDFC0001350
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SHUBHHOMES REALCON PVT. LTD. ESCROW A/C VRINDA HOMES 2BankHDFC BANK LIMITEDBranchPREET VIHAR BRANCH, LSC-19 AND 20, BLOCK-A, DELHI-110092Branch addressLSC -19 AND 20, BLCOK-A, PREET VIHAR BRANCH, DELHI-110092Branch districtGhaziabadA/C no.IFSCHDFC0001350
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about VRINDA HOMES-2

Is VRINDA HOMES-2 RERA registered?

Yes. VRINDA HOMES-2 is registered with UPRERA under registration number UPRERAPRJ640924, registered on 30 Nov 2021. Estanzo reproduces that filing; it does not verify the work behind it.

Has VRINDA HOMES-2 been completed?

UPRERA still lists VRINDA HOMES-2 as Registered, so it is not shown as completed here. A completion certificate dated 9 Mar 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of VRINDA HOMES-2?

SHUBHHOMES REALCON PRIVATE LIMITED is the promoter entity that filed VRINDA HOMES-2 with UPRERA (promoter RERA ID UPRERAPRM1504). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does VRINDA HOMES-2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is VRINDA HOMES-2 located?

VRINDA HOMES-2 is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in VRINDA HOMES-2?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in VRINDA HOMES-2?

The approved unit plan filed with UPRERA runs from 23 to 31 m² of carpet area (about 242 to 338 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in VRINDA HOMES-2?

The approved unit plan describes 1 block and 546 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is VRINDA HOMES-2?

About 434 units per acre: 546 planned units across 1.26 acres (5,090 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗