Windsor at Godrej Golf Links

UPRERACompleted

Windsor at Godrej Golf Links is a RERA-registered commercial project by AR LANDCRAFT LLP in Gautam Budh Nagar (RERA ID UPRERAPRJ16712). RERA status: Completed on 30 Jun 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Completed.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ16712
Project categoryCommercial
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Sept 2018
Project duration58 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeLimited Liability Partnership (LLP)
Applicant addressUM House, 3rd Floor, Plot No. 35P, UM House, Sector-44, Gurgaon, Haryana – 122002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    PLG/(BP)-3459/Vol II/253

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. Completion certificate filed

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered29 Jun 2018
Original completion15 Dec 2021
Revised completion13 Jun 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary30 Jun 2025
Registration fee₹1,45,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors114 · 6 · 9 (units from plan)
  • 3 BHK60 53%
  • 4 BHK54 47%
ConfigurationUnitsCarpet area
3 BHK6097-104
4 BHK54126
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER A (APPROVED AS B2 IN BUILDING PLAN) · OTHER, 3 BHK91497
TOWER A 3BHK+UTILITY (APPROVED AS B2 IN BUILDING P · OTHER, 3 BHK916104
TOWER B 4BHK+UTILITY (APPROVED AS C1 IN BUILDING P · OTHER, 4 BHK927126
TOWER C 4BHK+UTILITY (APPROVED AS C2 IN BUILDING P · OTHER, 4 BHK927126
TOWER D (APPROVED AS B2 IN BUILDING PLAN) · OTHER, 3 BHK91497
TOWER D 3BHK+UTILITY (APPROVED AS B2 IN BUILDING P · OTHER, 3 BHK916104
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Arcop Associates
License CA/2007/40332
Sector 32, Gurugram, Haryana 122001
Engineer
Precision Precast Solutions Pvt. Ltd.
1st Floor, Service Building, Bhaif Bhavan, Dr. Manibhai desai nagar, Warje, Pune 411058, India
Contractor
Main contractor not yet appointed
n/a
Sr.Development work declared to RERA
1Demarcation of Plots
As per apporved Master Plan
2Boundary Wall
As per apporved Master Plan
3Road Work
As per apporved Master Plan
4Footpaths
As per apporved Master Plan
5Water Supply Including Drinking Water Facilities
Greater Noida Authority shall provide water supply to the entire society further water will be treated and supplied at customer premise through piping and pumping and gravity system
6Sewer System
Centralised STP  to treat the sewerage and every tower has its own down comers connected to main sewerage line
7Drain
Common drainage system designed for complete project rain water is connected to recharge pits and finally it’s overflow to govt drain line
8Parks
As per apporved Master Plan
9Tree Planting
As per apporved Master Plan
10Design For Electric Supply Including Street Lighting
Single feeder shall be taken from Electricity board and connected to central substation and entire project shall have street lighting with timer control
11Community Buildings
gym and swimming pool
12Treatment and Disposal System of Sewage and Sullage water
Central STP for entire project and all towers shall be connected to STP
13Solid Waste Management And Disposal System
Project shall have  waste segregation area and OWC for treatment of organic waste
14Water Conservation System
Adequate no of  Recharge pits shall be made
15Energy Management System Including Use of Renewable Energy
LED lights and timer control panels shall be used for efficient energy management
16Fire Protection And Fire Safety System
hydrant system provided
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per apporved Master Plan
18Emergency Evacuation Services
As per apporved Master Plan
19Other Miscellaneous Work
The Developer is in the process of developing a township known as Godrej Golf Links (“Township”) comprising of a golf course & club, villas, other developments along with other amenities, facilities, services etc. as per Master Plan approved by GNIDA in a phased manner. The developer has registered 3 villa cluster ( crest, evoke and Presidential villas) and one unit cluster (The suites) with UPRERA and similarly remaining villas and unit clusters will be registered with UPRERA in due course. The present registration is for one of the unit cluster known as Park Avenue. The Developer is also developing Master club, golf course, sports arena and other amenities in the Township as mandated under Master plan. The Master club, golf course, sports arena does not form part of any cluster/phase but will be used by all allottees of the Township upon payment of membership fee and the membership will be open to general public as well.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

43 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ANAROCK Property Consultants Private LimitedUPRERAAGT10265
3Bajaj Capital Investment Centre LimitedUPRERAAGT11036
4BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
5BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
6BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED)UPRERAAGT11569
7Clicbrics Technologies Private Limited. Formerly Redbrics ITES India Pvt LtdUPRERAAGT10906
8Cushman & Wakefield India Private LimitedUPRERAAGT11043
9FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
10GATEWAY PROPMART PVT LTDUPRERAAGT10384
11Gharondha Estates & financial consultantsUPRERAAGT13048
12HONEY MONEY ASSOCIATES LIMITEDUPRERAAGT11535
13IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
14INDIABULLS INVESTMENT ADVISORS LIMITEDUPRERAAGT10238
15Innovance Realty Private LimitedUPRERAAGT13354
16INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
17JAI AMBEY CONSULTANTSUPRERAAGT11064
18JOINT BRICKS PROPMARTUPRERAAGT11518
19Jones Lang LaSalle Property Consultants (India) Pvt LtdUPRERAAGT10791
20JUYAL REALTORSUPRERAAGT11026
21KAPUR ESTATESUPRERAAGT11301
22KNIGHT FRANK INDIA PVT LTDUPRERAAGT12268
23LINK PROPERTIESUPRERAAGT10081
24Mart One Realty Private LimitedUPRERAAGT10104
25Naturetech Realty Private LimitedUPRERAAGT10282
26NEOBRIX CONSULTING PVT LTDUPRERAAGT10059
27PRIME ESTATESUPRERAAGT11881
28PROPAMPLE REALTORS (SANJAY MEHRA)UPRERAAGT12846
29PROPCASA CONSULTANCY PVT. LTD.UPRERAAGT10038
30PROPERTY JUNCTION PRIVATE LIMITEDUPRERAAGT12902
31Propertypistol Realty Pvt LtdUPRERAAGT12730
32PROPSHOPUPRERAAGT10129
33PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED)UPRERAAGT10032
34PUNEET PAAWAUPRERAAGT11287
35RAJ NANDINI ESTATES PRIVATE LIMITEDUPRERAAGT10793
36REAL BRICKS INFRATECHUPRERAAGT13418
37REALTY WORLD INFRATECH PVT. LTD.UPRERAAGT10531
38Sapphire EstateUPRERAAGT12673
39SMC Real Estate Advisors Private LimitedUPRERAAGT10113
40star estateUPRERAAGT10202
41STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
42SYNERGY INFRACONUPRERAAGT10982
43Tarun JainUPRERAAGT11119
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 12 Jan 2022. 1 of them carries a revalidation.

Sanctioned by Greater Noida Authority · 13,413 sqm of land · an approved plan of 6 blocks and 114 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
PLG/(BP)- 3459/ Vol II/25313 Jan 201712 Jan 202211 Jan 202715 Dec 2021—
PLG/(BP)-3459/Vol II/25313 Jan 201712 Jan 202211 Jan 202713 Jun 202313 Jan 2017
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 13 Jun 2023.

#Granted fromExtended uptoNote
115 Dec 202114 Jun 2022Six months extension in view of force majeure caused by covid-19 pandemic
214 Jun 202213 Jun 2023—

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
REP 1403575Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 34217
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 11418
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · PROP/Commercial/2014/2911
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Jun 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New29 Jun 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Jun 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Jun 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Jun 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Jun 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Jun 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 Jun 2018 ↗

Quarterly progress reports

17 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

17 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAR LANDCRAFT LLP
RolePromoter · current
RERA IDUPRERAPRM1081
PANABEFA8308A
CIN / TANAAF-6499
Registered addressUM House, 3rd Floor, Plot No. 35P, UM House, Sector-44, Gurgaon, Haryana – 122002
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
GODREJ GOLF LINK VI RERA 70 ACCOUNTBankICICI Bank LTDBranchsector forty six GurugramA/C no.IFSCICIC0003890
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

8 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)239 (Under Registration - 5 ) → 239 (Under Registration - 3 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)238 (Under Registration - 4 ) → 239 (Under Registration - 5 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)237 (Under Registration - 3 ) → 238 (Under Registration - 4 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)237 (Under Registration - 4 ) → 237 (Under Registration - 3 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)236 (Under Registration - 3 ) → 237 (Under Registration - 4 )
changed in Estanzo’s record
19 Sept 2026
Promoter’s complaints tally (all their projects)235 (Under Registration - 2 ) → 236 (Under Registration - 3 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)235 (Under Registration - 3 ) → 235 (Under Registration - 2 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)235 (Under Registration - 4 ) → 235 (Under Registration - 3 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 7 Oct 2026 · 8 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Windsor at Godrej Golf Links

Is Windsor at Godrej Golf Links RERA registered?

Yes. Windsor at Godrej Golf Links is registered with UPRERA under registration number UPRERAPRJ16712, registered on 29 Jun 2018. Estanzo reproduces that filing; it does not verify the work behind it.

Has Windsor at Godrej Golf Links been completed?

UPRERA lists Windsor at Godrej Golf Links as completed, with a completion certificate dated 30 Jun 2025, against a filed deadline of 13 Jun 2023.

Who is the builder of Windsor at Godrej Golf Links?

AR LANDCRAFT LLP is the promoter entity that filed Windsor at Godrej Golf Links with UPRERA (promoter RERA ID UPRERAPRM1081). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Windsor at Godrej Golf Links more time to complete?

UPRERA's record carries 2 completion extensions for Windsor at Godrej Golf Links, the latest running to 13 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Windsor at Godrej Golf Links have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Windsor at Godrej Golf Links located?

Windsor at Godrej Golf Links is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Windsor at Godrej Golf Links?

The unit plan filed with UPRERA lists OTHER, 3 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Windsor at Godrej Golf Links?

The approved unit plan filed with UPRERA runs from 97 to 126 m² of carpet area (about 1,044 to 1,356 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Windsor at Godrej Golf Links?

The approved unit plan describes 6 blocks and 114 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Windsor at Godrej Golf Links?

About 34 units per acre: 114 planned units across 3.31 acres (13,413 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗