WOODLAND PARADISE RUDRAKSH KALPTARU is a RERA-registered residential project by Rudraksh Developers private limited in Lucknow (RERA ID UPRERAPRJ9168). Registered with a completion deadline of 15 Oct 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ9168 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 15 Aug 2017 |
| Project duration | 51 months |
| Address | Bakshi Ka Talab**, Lucknow |
| Tehsil | Bakshi Ka Talab** |
| Applicant type | Company |
| Applicant address | WOODLAND GARDEN, OFF KURSI ROAD, SCORPIO CLUB THANA GUDMBA |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
16/NAKSHA/JILA PANCHAYAT/2017-18
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 11 Aug 2017 |
| Original completion | 16 Apr 2021 |
| Revised completion | 15 Oct 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹38,500 |
| Sanctioning authority | Any Other Competent Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 120 | 54 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 2 BHK | 4 | 40 | 54 |
| B · 2 BHK | 4 | 40 | 54 |
| c · 2 BHK | 4 | 40 | 54 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation of plots is completed. |
| 2 | Boundary Wall NA |
| 3 | Road Work Yet to be started |
| 4 | Footpaths NA |
| 5 | Water Supply Including Drinking Water Facilities Arrangements are made for water supply including drinking water facilities through submersible boring. |
| 6 | Sewer System Sewer System to be provided through Septic Tank (Shankar Balram) |
| 7 | Drain Yet to be started |
| 8 | Parks NA |
| 9 | Tree Planting Approx.50 trees will be planted during our project construction. |
| 10 | Design For Electric Supply Including Street Lighting To be provided by LESA. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water NA |
| 13 | Solid Waste Management And Disposal System NA |
| 14 | Water Conservation System Yet to be started |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System Yet to be started |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services To be constructed along with the building. Seperate Stair and Lift will be provided. |
| 19 | Other Miscellaneous Work NIL |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 17 Apr 2019.
Sanctioned by Any Other Competent Authority · 6,660 sqm of land · an approved plan of 3 blocks and 120 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 16/NAKSHA/JILA PANCHAYAT/2017-18 | 25 Apr 2017 | 17 Apr 2019 | 17 Apr 2021 | 16 Apr 2021 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 15 Oct 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 16 Apr 2021 | 15 Oct 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 577 | 6660SQM | — |
| 577 | 6660 | Khasra |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 8 May 2008.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 5948 | 18 Oct 2008 | self | — |
| 2521/08 | 8 May 2008 | self | — |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 5 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 5 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 10 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | SUMMER SABLE PUMP |
| Fire safety (as filed with RERA) | HOSEREL TERIS TANK 10000LTR TERIS PUMP 900LPM FIRE EXTINGUISHER |
| Health service | N A |
| Renewable energy | N A |
| Other facilities | N A |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
7 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Rudraksh Developers private limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM7071 |
| PAN | AADCR3701M |
| CIN / TAN | U45201UP2003PTC028094 |
| Name of chairman | Sanjiv Jaiswal |
| Registered address | WOODLAND GARDEN, OFF KURSI ROAD, SCORPIO CLUB THANA GUDMBA |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | RUDRAKSH DEVELOPERS PRIVATE LIMITEDBankHDFC BANKBranchJANKIPURAMA/C no.IFSCHDFC0001908 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about WOODLAND PARADISE RUDRAKSH KALPTARU
Is WOODLAND PARADISE RUDRAKSH KALPTARU RERA registered?
Yes. WOODLAND PARADISE RUDRAKSH KALPTARU is registered with UPRERA under registration number UPRERAPRJ9168, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for WOODLAND PARADISE RUDRAKSH KALPTARU?
The completion date filed with UPRERA is 15 Oct 2021. No completion certificate is on record yet.
Who is the builder of WOODLAND PARADISE RUDRAKSH KALPTARU?
Rudraksh Developers private limited is the promoter entity that filed WOODLAND PARADISE RUDRAKSH KALPTARU with UPRERA (promoter RERA ID UPRERAPRM7071). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does WOODLAND PARADISE RUDRAKSH KALPTARU show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Has UPRERA granted WOODLAND PARADISE RUDRAKSH KALPTARU more time to complete?
UPRERA's record carries 1 completion extension for WOODLAND PARADISE RUDRAKSH KALPTARU, the latest running to 15 Oct 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does WOODLAND PARADISE RUDRAKSH KALPTARU have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is WOODLAND PARADISE RUDRAKSH KALPTARU located?
WOODLAND PARADISE RUDRAKSH KALPTARU is registered in Lucknow, as filed with UPRERA.
What configurations are available in WOODLAND PARADISE RUDRAKSH KALPTARU?
The unit plan filed with UPRERA lists 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in WOODLAND PARADISE RUDRAKSH KALPTARU?
The approved unit plan describes 3 blocks and 120 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is WOODLAND PARADISE RUDRAKSH KALPTARU?
About 73 units per acre: 120 planned units across 1.65 acres (6,660 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗