RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3504
Project categoryCommercial
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start20 Jun 2014
Original start20 Jun 2014
Project duration133 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressGF-09,Plaza M-6, Jasola District Centre , New Delhi-110025
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    PLG/(BP) 1445-VOL-II/3737, PLG/(BP) 1448/8637 30.11.2016

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered10 Aug 2017
Original completion31 Dec 2024
Revised completion30 Jun 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹7,40,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors5,290 · 1 · 19 (units from plan)
ConfigurationUnitsCarpet area
OTHER5,2905-120
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
WTC Noida · OTHER195,2905-120
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 261.08 m² for a OTHER, 468.32 m² for a OTHER, 607.58 m² for a OTHER and 5 other units like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
M/s Abaxial Architects Pvt. Ltd., M/s Planning & Design Bureau, M/s Vintech Consultants
License CA/2010/50974
Plot No. 8, Pocket 1, Jasola 110025
Engineer
M/s Planning & Design Bureau
M-31, Greater Kailash Part-II, New Delhi-110048
Contractor
M/s Proactive Construction Pvt. Ltd.
Plot No. 13A, Tech Zone, Greater Noida
Sr.Development work declared to RERA
1Demarcation of Plots
Completed
2Boundary Wall
N.A
3Road Work
Internal road to be Provided on site
4Footpaths
Internal footpaths to be Provided on site
5Water Supply Including Drinking Water Facilities
To be Provided on Site
6Sewer System
Internal sewer system to be Provided on site
7Drain
Internal Drain to be Provided on site
8Parks
N.A
9Tree Planting
Internal tree planting to be Provided on site
10Design For Electric Supply Including Street Lighting
Internal electric supply to be Provided on site
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
Internal Treatment & Disposal system of sewage & sullage water to be Provided on site
13Solid Waste Management And Disposal System
Internal waste management system to be Provided on site
14Water Conservation System
Internal water conversation system to be Provided on site
15Energy Management System Including Use of Renewable Energy
Internal Energy Management system to be Provided on site
16Fire Protection And Fire Safety System
All provisions already taken in design
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A
18Emergency Evacuation Services
All provisions already taken in design
19Other Miscellaneous Work
To be Provided on Site
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

134 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ALMIGHTY INFRAESTATE PVT LTDUPRERAAGT10163
3AMIT KUMARUPRERAAGT11730
4AMIT KUMARUPRERAAGT14654
5amit Kumar SharmaUPRERAAGT13946
6amit kumar sharmaUPRERAAGT15317
7AMIT PANDEYUPRERAAGT14589
8ANAROCK Property Consultants Private LimitedUPRERAAGT10265
9Anil KumarUPRERAAGT14560
10ANIL KUMAR VERMAUPRERAAGT14346
11Anupam Kumar GauravUPRERAAGT12510
12ANURADHA YADAVUPRERAAGT11055
13ANURAG GUPTAUPRERAAGT14504
14ARCHANA GUPTAUPRERAAGT10881
15ARUN KUMAR JAINUPRERAAGT14769
16ATN BUILDTECH PVT. LTD.UPRERAAGT13348
17Bajaj Capital Investment Centre LimitedUPRERAAGT11036
18BALAJI PROPERTIES & ARCADE PRIVATE LIMITEDUPRERAAGT11143
19Bharat SinghUPRERAAGT10914
20Brijendra SinghUPRERAAGT10496
21BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED)UPRERAAGT11569
22Clicbrics Technologies Private Limited. Formerly Redbrics ITES India Pvt LtdUPRERAAGT10906
23DEEP AKASHUPRERAAGT11679
24DEEPAK KUMARUPRERAAGT13607
25DINESH KUMARUPRERAAGT11019
26DINESH KUMAR DIWAKARUPRERAAGT10988
27Dinesh SinghUPRERAAGT12536
28DIVYA KUMARIUPRERAAGT12330
29Elphos Associates Private LimitedUPRERAAGT14518
30FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
31GAJENDRA SINGHUPRERAAGT12944
32GATEWAY PROPMART PVT LTDUPRERAAGT10384
33GAURAV JAINUPRERAAGT11716
34Gaurav KaushikUPRERAAGT15389
35GAURAV SAINIUPRERAAGT15301
36GAURAV SARAFUPRERAAGT13979
37gaurav sharmaUPRERAAGT12678
38GAUTAM ASSOCIATESUPRERAAGT11617
39GOLDEN STAR REAL ESTATESUPRERAAGT10303
40IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
41Imperial Real Estate Solutions Private LimitedUPRERAAGT12329
42INDIABULLS INVESTMENT ADVISORS LIMITEDUPRERAAGT10238
43Investor Mart C/o Amar SangwanUPRERAAGT13201
44INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
45INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
46JAI AMBEY CONSULTANTSUPRERAAGT11064
47Jones Lang LaSalle Property Consultants (India) Pvt LtdUPRERAAGT10791
48kumar vishal singhUPRERAAGT13728
49M.S. ConsultantsUPRERAAGT10079
50MADHYAM ESTATE LINKERS PVT LTDUPRERAAGT10509
51Manav BhatnagarUPRERAAGT15223
52Manav SharmaUPRERAAGT11086
53MANOJ DWIVEDIUPRERAAGT15229
54Manoj GuptaUPRERAAGT12797
55Manoj KumarUPRERAAGT12848
56Manoj Kumar Goel C/o D Estate WorldUPRERAAGT15144
57Manoj Kumar GuptaUPRERAAGT10608
58Mart One Realty Private LimitedUPRERAAGT10104
59MuditUPRERAAGT12276
60Mukesh kumar SharmaUPRERAAGT11494
61MUKESH SINGH-OM SAI GLOBALUPRERAAGT15063
62MUKUL ARORAUPRERAAGT14461
63MUKUL BANAUPRERAAGT13633
64Mukul VermaUPRERAAGT12031
65Narendra SinghUPRERAAGT14206
66NEXT WAVE REALTORS C/O MUKESH RAIUPRERAAGT14629
67NIMBUS PROPMART PVT. LTD.UPRERAAGT11459
68Nirmal Estate C/O Satya Prakash OjhaUPRERAAGT12705
69Nishant kumar SinghUPRERAAGT14770
70OM NARAYAN SHUKLAUPRERAAGT14911
71Ovearth Private LimitedUPRERAAGT10091
72PARDEEP KUMAR SAWHNEYUPRERAAGT13008
73PARMESHWAR PRASADUPRERAAGT14454
74pawan kumarUPRERAAGT15211
75Pawan Kumar GuptaUPRERAAGT12919
76Pegasus Infra Consulting Pvt Ltd ( formerly known as Investors Infrahome Pvt Ltd)UPRERAAGT10062
77prabhat sharmaUPRERAAGT14535
78PRANAV KUMAR SINGHUPRERAAGT11147
79PRATAP SINGHUPRERAAGT12669
80Praveen KumarUPRERAAGT14021
81PRAVEEN KUMAR SINGHUPRERAAGT14369
82PRIME ESTATESUPRERAAGT11881
83PROPCASA CONSULTANCY PVT. LTD.UPRERAAGT10038
84PROPERTY JUNCTION PRIVATE LIMITEDUPRERAAGT12902
85PROPFOLIO PRIVATE LIMITEDUPRERAAGT10358
86PROPONOMICS (Prop-Praveen Kumar)UPRERAAGT14976
87PROPSHOPUPRERAAGT10129
88PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED)UPRERAAGT10032
89PROPZONE INFRATECHUPRERAAGT10285
90PUNEET PAAWAUPRERAAGT11287
91PUNEET SHARMAUPRERAAGT12353
92R K PROPERTIESUPRERAAGT11201
93RAHULUPRERAAGT11454
94RAJ NANDINI ESTATES PRIVATE LIMITEDUPRERAAGT10793
95Rajanish Kumar SinghUPRERAAGT12387
96RAJEEV KUMARUPRERAAGT10524
97Rajendra Kumar AgarwalUPRERAAGT11030
98Rajesh SinghUPRERAAGT11077
99Rakesh Kumar SinghalUPRERAAGT10137
100RAM KUMAR TIWARIUPRERAAGT14400
101RAM KUMAR YADAVUPRERAAGT13784
102RAM SINGHUPRERAAGT13480
103RAMESH SINGHUPRERAAGT15129
104RAMVEER SINGH CHAUHANUPRERAAGT13620
105RANJAN KUMAR C/O ANKUR REAL ESTATE DEVELOPERSUPRERAAGT13363
106RAO Homez Pvt.LtdUPRERAAGT13780
107Ravinder KumarUPRERAAGT13377
108REAL HOMEZUPRERAAGT11572
109REALTY WORLD INFRATECH PVT. LTD.UPRERAAGT10531
110Reckon Projects Pvt.Ltd.UPRERAAGT10043
111REETA MAURYA C/O SHIVA ASSOCIATEUPRERAAGT13650
112RITIKAUPRERAAGT13797
113Rudra Property Inn Pvt LtdUPRERAAGT12555
114sanjay kumarUPRERAAGT13075
115Sanjeev BhallaUPRERAAGT12198
116SANJEEV KUMARUPRERAAGT15085
117SANJEEV KUMAR BANKAUPRERAAGT10894
118SANJEEV RANJAN KUMARUPRERAAGT13619
119SANTOSH KUMARUPRERAAGT10156
120Santosh KumarUPRERAAGT13874
121Saurabh GuptaUPRERAAGT14655
122Saurabh KumarUPRERAAGT13983
123SHRI RAM NISHADUPRERAAGT14690
124SINAN REALTY LLPUPRERAAGT11785
125Smart InfraReality Private LimitedUPRERAAGT10057
126SMC Real Estate Advisors Private LimitedUPRERAAGT10113
127SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
128star estateUPRERAAGT10202
129SUMAN GOTHWALUPRERAAGT13868
130Sunil KumarUPRERAAGT12719
131SUNIL KUMARUPRERAAGT14586
132SUNIL KUMARUPRERAAGT15024
133Sushil vyasUPRERAAGT13744
134VALUEMAX ADVISORS CONSULTING PRIVATE LIMITEDUPRERAAGT11361
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Jun 2020.

Sanctioned by Greater Noida Authority · 72,985 sqm of land · an approved plan of 1 block and 5290 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/(BP) 1445-VOL-II/3737, PLG/(BP) 1448/8637 30.11.20161 Jul 201530 Jun 202030 Jun 202531 Dec 2024
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2025.

#Granted fromExtended uptoNote
131 Dec 202430 Jun 2025Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
TZ 13A & 13B72985—
13A & 13 B72985Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 5 May 2009.

Registry no.DateTypeArea
53205 May 2009self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 5320 & 5321
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 5320 & 5321
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · IND/IT/2007/434
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · IND/IT/2007/435
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · Vahi No.1, Jild No.4535 page no.349/386 sl no.5321
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Vahi No.1, Jild No.4535 page no.349/386 sl no.5321
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Vahi No.1, Jild No.4535 page no.349/386 sl no.5321
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Vahi No.1, Jild No.4535 page no.349/386 sl no.5321
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Sale deed · Vahi No.1, Jild No.4535 page no.349/386 sl no.5321 & 5320
The registered deed by which the promoter bought the land.
PDF ↗
Lease deed · Vahi No.1, Jild No.4535 page no.349/386 sl no.5321 & 5320
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Vahi No.1, Jild No.4535 page no.349/386 sl no.5321 & 5320
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · 5320 & 5321
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · 5320 & 5321
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · 5320 & 5321
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Jan 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New2 Aug 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New2 Aug 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Aug 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old17 Oct 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old17 Oct 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old17 Oct 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old17 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterDetails mentioned in attachments
Fire safety (as filed with RERA)Details mentioned in attachments
Renewable energyDetails mentioned in attachments
Other facilitiesDetails mentioned in attachments

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameWTC Noida Development Company Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM5370
PANAALCS6345L
CIN / TANU45300DL2007PTC162288
Name of chairmanDetails are mentioned in attachments
Registered addressGF-09,Plaza M-6, Jasola District Centre , New Delhi-110025
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
WTC NoidaBankHDFCBranchSarita ViharA/C no.IFSCHDFC0000480
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)765 (Under Registration - 9 ) → 765 (Under Registration - 2 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)765 (Under Registration - 10 ) → 765 (Under Registration - 9 )
changed in Estanzo’s record
9 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 29 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about WTC Noida

Is WTC Noida RERA registered?

Yes. WTC Noida is registered with UPRERA under registration number UPRERAPRJ3504, registered on 10 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for WTC Noida?

The completion date filed with UPRERA is 30 Jun 2025. No completion certificate is on record yet.

Who is the builder of WTC Noida?

WTC Noida Development Company Pvt. Ltd. is the promoter entity that filed WTC Noida with UPRERA (promoter RERA ID UPRERAPRM5370). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does WTC Noida show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted WTC Noida more time to complete?

UPRERA's record carries 1 completion extension for WTC Noida, the latest running to 30 Jun 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does WTC Noida have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is WTC Noida located?

WTC Noida is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in WTC Noida?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in WTC Noida?

The approved unit plan filed with UPRERA runs from 5 to 120 m² of carpet area (about 54 to 1,294 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in WTC Noida?

The approved unit plan describes 1 block and 5,290 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is WTC Noida?

About 293 units per acre: 5,290 planned units across 18.03 acres (72,985 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗