34 No LIG Finished Houses in Lohramau Yojna Sultanpur is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Sultanpur (RERA ID UPRERAPRJ15931). Registered with a completion deadline of 31 Dec 2020.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ15931 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Aug 2018 |
| Project duration | 35 months |
| Address | Sultanpur, Sultanpur |
| Tehsil | Sultanpur |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
92/Unit-3
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Extension granted (2)
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 3 May 2018 |
| Original completion | 31 Jan 2020 |
| Revised completion | 31 Dec 2020 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 28 Nov 2020 |
| Registration fee | ₹23,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 59 | 25 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 1 · OTHER | 1 | 59 | 25 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Completed |
| 2 | Boundary Wall N/A |
| 3 | Road Work Completed |
| 4 | Footpaths N/A |
| 5 | Water Supply Including Drinking Water Facilities Work in Progress |
| 6 | Sewer System Completed |
| 7 | Drain Work in Progress |
| 8 | Parks Completed |
| 9 | Tree Planting Work in Progress |
| 10 | Design For Electric Supply Including Street Lighting Work in Progress |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water S.T.P. Praposed |
| 13 | Solid Waste Management And Disposal System N/A |
| 14 | Water Conservation System N/A |
| 15 | Energy Management System Including Use of Renewable Energy N/A |
| 16 | Fire Protection And Fire Safety System N/A |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services N/A |
| 19 | Other Miscellaneous Work N/A |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 31 Jan 2020.
Sanctioned by U.P. Awas Evam Vikas Parishad · 3,575 sqm of land · an approved plan of 1 block and 59 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 92/Unit-3 | 16 Mar 2016 | 31 Jan 2020 | 31 Jan 2020 | 31 Jan 2020 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 30 Jun 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Jan 2020 | 30 Jun 2021 | — |
| 2 | 31 Jan 2020 | 31 Dec 2020 | — |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 55, 56, 57, 58, 59 | 3574.81 | — |
| 56 | 520 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 23 May 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 4081 | 23 May 2015 | self | — |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 16 Dec 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 16 Dec 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 16 Dec 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 16 Dec 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 16 Dec 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 12 Apr 2019 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 23 Nov 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 23 Nov 2019 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | As per norms |
| Fire safety (as filed with RERA) | As per norms |
| Health service | As per norms |
| Renewable energy | As per norms |
| Other facilities | As per norms |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2020-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Sultanpur
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | FLEXIBankUnion Bank of IndiaBranchAshiyana BranchA/C no.IFSCUBIN0559571 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
Common questions about 34 No LIG Finished Houses in Lohramau Yojna Sultanpur
Is 34 No LIG Finished Houses in Lohramau Yojna Sultanpur RERA registered?
Yes. 34 No LIG Finished Houses in Lohramau Yojna Sultanpur is registered with UPRERA under registration number UPRERAPRJ15931, registered on 3 May 2018. Estanzo reproduces that filing; it does not verify the work behind it.
Has 34 No LIG Finished Houses in Lohramau Yojna Sultanpur been completed?
UPRERA still lists 34 No LIG Finished Houses in Lohramau Yojna Sultanpur as Registered, so it is not shown as completed here. A completion certificate dated 28 Nov 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of 34 No LIG Finished Houses in Lohramau Yojna Sultanpur?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed 34 No LIG Finished Houses in Lohramau Yojna Sultanpur with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted 34 No LIG Finished Houses in Lohramau Yojna Sultanpur more time to complete?
UPRERA's record carries 2 completion extensions for 34 No LIG Finished Houses in Lohramau Yojna Sultanpur, the latest running to 30 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does 34 No LIG Finished Houses in Lohramau Yojna Sultanpur have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is 34 No LIG Finished Houses in Lohramau Yojna Sultanpur located?
34 No LIG Finished Houses in Lohramau Yojna Sultanpur is registered in Sultanpur, as filed with UPRERA.
What configurations are available in 34 No LIG Finished Houses in Lohramau Yojna Sultanpur?
The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in 34 No LIG Finished Houses in Lohramau Yojna Sultanpur?
The approved unit plan describes 1 block and 59 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is 34 No LIG Finished Houses in Lohramau Yojna Sultanpur?
About 67 units per acre: 59 planned units across 0.88 acres (3,575 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗