U.P. Awas Evam Vikas Parishad

UPRERA

U.P. Awas Evam Vikas Parishad (RERA ID: UPRERAPRM4243) is a promoter entity registered with UP-RERA since 2017. It has 151 projects on record with Estanzo, of which 2 are on RERA's Default-on-QPR list.

Summarize this record with:ChatGPTPerplexityClaudeGrok

One legal entity’s record; a brand may register through several. Complaint counts are allegations, with no outcome attached.

Projects by this promoter

151 on record
Registered151each project counted once, under the authority’s own step
1120(G+3) no. of EWS houses at sec-17 mandola viha UPRERA
UPRERAPRJ8844 · Ghaziabad
Promised completion 31 Mar 2019
Registered
12 Nos. Residential Plots in Shakumbhari Vihar Yojna, Saharanpur. UPRERA
UPRERAPRJ456583 · Saharanpur
Promised completion 29 Feb 2024
Registered
131/144 Type Duplex and 69/142 Type Residential Houses in Sector-3, Scheme No. 11, Jagriti Vihar (Ext.), Meerut UPRERA
UPRERAPRJ268476 · Meerut
Promised completion 19 May 2026 · Extended
Registered
137 NO SFS HOUSE IN SECT 14 OF MAJHOLA YOJ. NO 04 VISTAAR MORADABAD UPRERA
UPRERAPRJ410085 · Moradabad
Promised completion 25 Jan 2029
Registered
169 Nos. Residential Plots in Soot Mill Awasiya Yojna Distt. Etawah UPRERA
UPRERAPRJ104249 · Etawah
Promised completion 1 Feb 2023
Registered
170 nos Plots in sector 10, Siddharth vihar yojna, Ghaziabad UPRERA
UPRERAPRJ403668 · Ghaziabad
Promised completion 27 Apr 2030
Registered
21 No. EWS 18/40 Type Houses UPRERA
UPRERAPRJ8458 · Barabanki
Promised completion 30 Jun 2019
Registered
21 Nos. Commercial Plot At Sector-2C Sikandra Yojna Agra UPRERA
UPRERAPRJ331046 · Agra
Promised completion 21 Jan 2030
Registered
274 FLATS GANGA ENCLAVE UPRERA
UPRERAPRJ9530 · Kanpur Nagar
Promised completion 31 Aug 2019 · Extended
Registered
2BHK (S+4) TYPE FLAT SECTOR-9A, MAJHOLA YOJNA-4, P UPRERA
UPRERAPRJ9476 · Moradabad
Promised completion 2 Sept 2018
Registered
34 No LIG Finished Houses in Lohramau Yojna Sultanpur UPRERA
UPRERAPRJ15931 · Sultanpur
Promised completion 31 Dec 2020 · Extended
Registered
42 No. MIG 45/75 Type finished houses at Lohramau Yojna Sultanpur UPRERA
UPRERAPRJ15932 · Sultanpur
Promised completion 31 Dec 2020 · Extended
Registered
48 Nos. EWS Houses in Sec-7A at Awadh Vihar Yojna, Lucknow UPRERA
UPRERAPRJ451179 · Lucknow
Promised completion 31 Aug 2021
Registered
59 NO SFS HOUS SEC 12A MAJHOLA YOJ 4 VISTAR MBD UPRERA
UPRERAPRJ365258 · Moradabad
Promised completion 5 Jan 2029
Registered
A-72 Semi finished houses at Spining Mill Yojna Et UPRERA
UPRERAPRJ9344 · Etawah
Promised completion 27 Aug 2021 · Extended
Registered
A72 type finished 32nos house at spinning mill awa UPRERA
UPRERAPRJ9615 · Etawah
Promised completion 30 Sept 2020 · Extended
Registered
Alaknanda Enclave, GH 2 and GH 3, Sector 3, Awadh UPRERA
UPRERAPRJ8433 · Lucknow
Promised completion 31 Mar 2018
Registered
Amrapali Enclave (Part-1), Hardoi Road UPRERA
UPRERAPRJ8081 · Lucknow
Promised completion 15 May 2021 · Extended
Registered
ARAVALI ENCLAVE UPRERA
UPRERAPRJ4308 · Lucknow
Promised completion 20 Feb 2020 · Extended
Registered
BASERA-1 AWADH VIHAR YOJNA, LUCKNOW UPRERA
UPRERAPRJ9974 · Lucknow
Promised completion 30 Mar 2019 · Extended
Registered

Showing 20 of 151 projects on record. See all 151 projects

Promoters sharing a director

none matched

Linked by a director’s DIN, never by name alone. Each company is its own record.

No other promoter shares a director with U.P. Awas Evam Vikas Parishad on record. RERA lists its directors without a DIN, and names alone are never matched.

Filings for more time

72 filings
Extension filings72
Projects with at least one38 of 100
Longest single extension1,125 days - Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad
Latest extension runs to29 Jan 2027 - Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad
Permits carrying a revalidation26 across 20 projects

Directors & ownership

1 named by UPRERA
Chairman
BALKAR SINGH

Promoter timeline

13 Aug 2013 - 1 Oct 2026
  1. Completion certificate filed
    official source ↗
  2. Extension filed
    new completion date on file 29 Jan 2027as recorded by UPRERA: Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026official source ↗
  3. Completion certificate filed
    official source ↗
  4. Completion certificate filed
    official source ↗
  5. Completion certificate filed
    official source ↗
  6. Completion certificate filed
    official source ↗
  7. Completion certificate filed
    official source ↗
  8. Extension filed
    new completion date on file 29 Oct 2026as recorded by UPRERA: Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026official source ↗
  9. Completion certificate filed
    official source ↗
  10. Completion certificate filed
    official source ↗
  11. Completion certificate filed
    official source ↗
  12. Completion certificate filed
    official source ↗
Show 271 earlier filings
  1. Project registered
    official source ↗
  2. Project registered
    official source ↗
  3. Completion certificate filed
    official source ↗
  4. Completion certificate filed
    official source ↗
  5. Extension filed
    new completion date on file 31 Dec 2026official source ↗
  6. Project registered
    official source ↗
  7. Completion certificate filed
    official source ↗
  8. Completion certificate filed
    official source ↗
  9. Permit revalidated
    as recorded by UPRERA: UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018official source ↗
  10. Project registered
    official source ↗
  11. Extension filed
    new completion date on file 30 Jul 2026official source ↗
  12. Completion certificate filed
    official source ↗
  13. Extension filed
    new completion date on file 30 Jul 2026official source ↗
  14. Extension filed
    new completion date on file 29 Oct 2026official source ↗
  15. Project registered
    official source ↗
  16. Project registered
    official source ↗
  17. Permit revalidated
    valid to 3 Jun 2028as recorded by UPRERA: 4/PMAY/CD-19/Anura/205 R/2020official source ↗
  18. Completion certificate filed
    official source ↗
  19. Extension filed
    new completion date on file 19 May 2026official source ↗
  20. Project registered
    official source ↗
  21. Extension filed
    new completion date on file 30 Mar 2026official source ↗
  22. Extension filed
    new completion date on file 30 Sept 2026official source ↗
  23. Extension filed
    new completion date on file 19 Dec 2026official source ↗
  24. Extension filed
    new completion date on file 30 May 2026official source ↗
  25. Extension filed
    new completion date on file 30 May 2026official source ↗
  26. Completion certificate filed
    official source ↗
  27. Completion certificate filed
    official source ↗
  28. Extension filed
    new completion date on file 17 Sept 2025official source ↗
  29. Project registered
    official source ↗
  30. Completion certificate filed
    official source ↗
  31. Completion certificate filed
    official source ↗
  32. Completion certificate filed
    official source ↗
  33. Completion certificate filed
    official source ↗
  34. Extension filed
    new completion date on file 30 Sept 2026official source ↗
  35. Completion certificate filed
    official source ↗
  36. Permit revalidated
    valid to 29 Nov 2027as recorded by UPRERA: 1249/20/8/2019official source ↗
  37. Project registered
    official source ↗
  38. Extension filed
    new completion date on file 29 Nov 2025official source ↗
  39. Completion certificate filed
    official source ↗
  40. Completion certificate filed
    official source ↗
  41. Completion certificate filed
    official source ↗
  42. Completion certificate filed
    official source ↗
  43. Extension filed
    new completion date on file 29 Jan 2027official source ↗
  44. Extension filed
    new completion date on file 30 Jun 2025official source ↗
  45. Extension filed
    new completion date on file 19 Dec 2024official source ↗
  46. Permit revalidated
    valid to 19 Dec 2026as recorded by UPRERA: 5732/AP/8official source ↗
  47. Project registered
    official source ↗
  48. Project registered
    official source ↗
  49. Extension filed
    new completion date on file 30 Mar 2025official source ↗
  50. Extension filed
    new completion date on file 30 Mar 2025official source ↗
  51. Extension filed
    new completion date on file 29 Sept 2024official source ↗
  52. Completion certificate filed
    official source ↗
  53. Permit revalidated
    as recorded by UPRERA: 076024official source ↗
  54. Extension filed
    new completion date on file 3 Sept 2024official source ↗
  55. Extension filed
    new completion date on file 11 Nov 2023official source ↗
  56. Extension filed
    new completion date on file 30 Jul 2025official source ↗
  57. Extension filed
    new completion date on file 26 Jan 2024official source ↗
  58. Completion certificate filed
    official source ↗
  59. Completion certificate filed
    official source ↗
  60. Project registered
    official source ↗
  61. Completion certificate filed
    official source ↗
  62. Extension filed
    new completion date on file 7 Jul 2025official source ↗
  63. Extension filed
    new completion date on file 30 Sept 2023as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  64. Extension filed
    new completion date on file 30 Sept 2023as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  65. Extension filed
    new completion date on file 30 Sept 2023as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  66. Permit revalidated
    valid to 20 Mar 2027as recorded by UPRERA: UPHDB/APD/UNIT6/PMAY/KANKAHA/LKO/CDLKO01/232/2023official source ↗
  67. Permit revalidated
    as recorded by UPRERA: UPHDB/APD/UNIT6/PMAY/KANKAHA/LKO/CDLKO01/232/2023official source ↗
  68. Extension filed
    new completion date on file 19 Dec 2023official source ↗
  69. Completion certificate filed
    official source ↗
  70. Completion certificate filed
    official source ↗
  71. Extension filed
    new completion date on file 29 Mar 2024official source ↗
  72. Project registered
    official source ↗
  73. Project registered
    official source ↗
  74. Completion certificate filed
    official source ↗
  75. Completion certificate filed
    official source ↗
  76. Extension filed
    new completion date on file 1 May 2023official source ↗
  77. Extension filed
    new completion date on file 8 Apr 2023official source ↗
  78. Completion certificate filed
    official source ↗
  79. Completion certificate filed
    official source ↗
  80. Extension filed
    new completion date on file 8 Feb 2023official source ↗
  81. Project registered
    official source ↗
  82. Extension filed
    new completion date on file 27 Apr 2023official source ↗
  83. Extension filed
    new completion date on file 2 Sept 2022official source ↗
  84. Extension filed
    new completion date on file 30 Sept 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  85. Permit revalidated
    valid to 27 Mar 2027as recorded by UPRERA: APD/VN-3/P.LOP/ SEC-5/OBARI YOJNA/BARABANKI/EE, CD-AYO-01/SE AYO CIRCLE/74 / HC-28/03/2022official source ↗
  86. Extension filed
    new completion date on file 27 Aug 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  87. Project registered
    official source ↗
  88. Extension filed
    new completion date on file 30 Jun 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  89. Extension filed
    new completion date on file 30 Jun 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  90. Extension filed
    new completion date on file 30 Jun 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  91. Extension filed
    new completion date on file 30 Jun 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  92. Completion certificate filed
    official source ↗
  93. Extension filed
    new completion date on file 19 Jun 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  94. Project registered
    official source ↗
  95. Extension filed
    new completion date on file 28 Apr 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  96. Project registered
    official source ↗
  97. Extension filed
    new completion date on file 29 Mar 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  98. Extension filed
    new completion date on file 29 Mar 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  99. Completion certificate filed
    official source ↗
  100. Completion certificate filed
    official source ↗
  101. Completion certificate filed
    official source ↗
  102. Completion certificate filed
    official source ↗
  103. Extension filed
    new completion date on file 29 Dec 2021official source ↗
  104. Extension filed
    new completion date on file 12 May 2022official source ↗
  105. Project registered
    official source ↗
  106. Extension filed
    new completion date on file 27 Aug 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  107. Completion certificate filed
    official source ↗
  108. Project registered
    official source ↗
  109. Extension filed
    new completion date on file 15 May 2021official source ↗
  110. Project registered
    official source ↗
  111. Completion certificate filed
    official source ↗
  112. Completion certificate filed
    official source ↗
  113. Extension filed
    new completion date on file 30 Jun 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  114. Completion certificate filed
    official source ↗
  115. Project registered
    official source ↗
  116. Extension filed
    new completion date on file 30 Jun 2021official source ↗
  117. Completion certificate filed
    official source ↗
  118. Extension filed
    new completion date on file 13 May 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  119. Project registered
    official source ↗
  120. Permit revalidated
    valid to 22 Oct 2020as recorded by UPRERA: 2292/Va0Ni0-7/GEN-23/229(II)official source ↗
  121. Project registered
    official source ↗
  122. Extension filed
    new completion date on file 30 Jan 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  123. Project registered
    official source ↗
  124. Project registered
    official source ↗
  125. Project registered
    official source ↗
  126. Project registered
    official source ↗
  127. Project registered
    official source ↗
  128. Extension filed
    new completion date on file 29 Dec 2020as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  129. Extension filed
    new completion date on file 29 Dec 2020as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  130. Extension filed
    new completion date on file 29 Dec 2020as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  131. Permit revalidated
    valid to 3 Jun 2025as recorded by UPRERA: 4/PMAY/CD-19/Anura/205 R/2020official source ↗
  132. Extension filed
    new completion date on file 30 Nov 2020as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  133. Extension filed
    new completion date on file 30 Sept 2020as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  134. Extension filed
    new completion date on file 28 Feb 2021official source ↗
  135. Extension filed
    new completion date on file 31 Dec 2020official source ↗
  136. Extension filed
    new completion date on file 31 Dec 2020official source ↗
  137. Extension filed
    new completion date on file 31 Dec 2020official source ↗
  138. Extension filed
    new completion date on file 30 Jun 2021official source ↗
  139. Extension filed
    new completion date on file 30 Jun 2020official source ↗
  140. Completion certificate filed
    official source ↗
  141. Completion certificate filed
    official source ↗
  142. Completion certificate filed
    official source ↗
  143. Completion certificate filed
    official source ↗
  144. Completion certificate filed
    official source ↗
  145. Completion certificate filed
    official source ↗
  146. Completion certificate filed
    official source ↗
  147. Extension filed
    new completion date on file 31 Jul 2020official source ↗
  148. Completion certificate filed
    official source ↗
  149. Completion certificate filed
    official source ↗
  150. Extension filed
    new completion date on file 2 Jan 2020official source ↗
  151. Completion certificate filed
    official source ↗
  152. Completion certificate filed
    official source ↗
  153. Completion certificate filed
    official source ↗
  154. Completion certificate filed
    official source ↗
  155. Completion certificate filed
    official source ↗
  156. Completion certificate filed
    official source ↗
  157. Completion certificate filed
    official source ↗
  158. Completion certificate filed
    official source ↗
  159. Completion certificate filed
    official source ↗
  160. Completion certificate filed
    official source ↗
  161. Completion certificate filed
    official source ↗
  162. Completion certificate filed
    official source ↗
  163. Completion certificate filed
    official source ↗
  164. Completion certificate filed
    official source ↗
  165. Extension filed
    new completion date on file 20 Feb 2020official source ↗
  166. Completion certificate filed
    official source ↗
  167. Completion certificate filed
    official source ↗
  168. Completion certificate filed
    official source ↗
  169. Completion certificate filed
    official source ↗
  170. Completion certificate filed
    official source ↗
  171. Completion certificate filed
    official source ↗
  172. Completion certificate filed
    official source ↗
  173. Completion certificate filed
    official source ↗
  174. Completion certificate filed
    official source ↗
  175. Completion certificate filed
    official source ↗
  176. Completion certificate filed
    official source ↗
  177. Completion certificate filed
    official source ↗
  178. Completion certificate filed
    official source ↗
  179. Completion certificate filed
    official source ↗
  180. Completion certificate filed
    official source ↗
  181. Project registered
    official source ↗
  182. Project registered
    official source ↗
  183. Project registered
    official source ↗
  184. Project registered
    official source ↗
  185. Project registered
    official source ↗
  186. Project registered
    official source ↗
  187. Project registered
    official source ↗
  188. Project registered
    official source ↗
  189. Permit revalidated
    valid to 2 Jan 2027as recorded by UPRERA: APD/DN-3/LOP-PMAY/Barabanki/CIR-3/CD-2/42official source ↗
  190. Permit revalidated
    valid to 19 Dec 2026as recorded by UPRERA: 5732/AP/8official source ↗
  191. Extension filed
    new completion date on file 31 Aug 2019official source ↗
  192. Extension filed
    new completion date on file 9 Nov 2019official source ↗
  193. Project registered
    official source ↗
  194. Project registered
    official source ↗
  195. Permit revalidated
    valid to 10 Sept 2026as recorded by UPRERA: UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018official source ↗
  196. Permit revalidated
    valid to 9 Sept 2026as recorded by UPRERA: UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018official source ↗
  197. Permit revalidated
    valid to 19 Aug 2026as recorded by UPRERA: 418/AP-3/PMAYofficial source ↗
  198. Permit revalidated
    valid to 19 Aug 2026as recorded by UPRERA: 418/AP-3/PMAYofficial source ↗
  199. Project registered
    official source ↗
  200. Project registered
    official source ↗
  201. Project registered
    official source ↗
  202. Project registered
    official source ↗
  203. Permit revalidated
    valid to 1 May 2026as recorded by UPRERA: APD/UNIT-6/BHINGA MARGofficial source ↗
  204. Permit revalidated
    valid to 1 May 2026as recorded by UPRERA: APD/UNIT-6/BHINGAofficial source ↗
  205. Project registered
    official source ↗
  206. Project registered
    official source ↗
  207. Extension filed
    new completion date on file 30 Mar 2019official source ↗
  208. Extension filed
    new completion date on file 30 Mar 2019official source ↗
  209. Project registered
    official source ↗
  210. Project registered
    official source ↗
  211. Permit revalidated
    valid to 15 Nov 2020as recorded by UPRERA: 073058official source ↗
  212. Permit revalidated
    valid to 25 Dec 2025as recorded by UPRERA: 3622official source ↗
  213. Project registered
    official source ↗
  214. Project registered
    official source ↗
  215. Project registered
    official source ↗
  216. Project registered
    official source ↗
  217. Project registered
    official source ↗
  218. Project registered
    official source ↗
  219. Project registered
    official source ↗
  220. Project registered
    official source ↗
  221. Project registered
    official source ↗
  222. Project registered
    official source ↗
  223. Project registered
    official source ↗
  224. Project registered
    official source ↗
  225. Project registered
    official source ↗
  226. Project registered
    official source ↗
  227. Project registered
    official source ↗
  228. Project registered
    official source ↗
  229. Project registered
    official source ↗
  230. Project registered
    official source ↗
  231. Project registered
    official source ↗
  232. Project registered
    official source ↗
  233. Project registered
    official source ↗
  234. Project registered
    official source ↗
  235. Project registered
    official source ↗
  236. Project registered
    official source ↗
  237. Project registered
    official source ↗
  238. Project registered
    official source ↗
  239. Project registered
    official source ↗
  240. Project registered
    official source ↗
  241. Project registered
    official source ↗
  242. Project registered
    official source ↗
  243. Project registered
    official source ↗
  244. Project registered
    official source ↗
  245. Project registered
    official source ↗
  246. Project registered
    official source ↗
  247. Project registered
    official source ↗
  248. Project registered
    official source ↗
  249. Project registered
    official source ↗
  250. Project registered
    official source ↗
  251. Project registered
    official source ↗
  252. Project registered
    official source ↗
  253. Project registered
    official source ↗
  254. Project registered
    official source ↗
  255. Project registered
    official source ↗
  256. Project registered
    official source ↗
  257. Project registered
    official source ↗
  258. Project registered
    official source ↗
  259. Project registered
    official source ↗
  260. Project registered
    official source ↗
  261. Project registered
    official source ↗
  262. Project registered
    official source ↗
  263. Project registered
    official source ↗
  264. Project registered
    official source ↗
  265. Project registered
    official source ↗
  266. Permit revalidated
    as recorded by UPRERA: N/Aofficial source ↗
  267. Permit revalidated
    as recorded by UPRERA: N/Aofficial source ↗
  268. Permit revalidated
    as recorded by UPRERA: AP No. 55/Unit-3official source ↗
  269. Permit revalidated
    as recorded by UPRERA: A.P. No. 55/Unit-3official source ↗
  270. Permit revalidated
    valid to 24 Jun 2021as recorded by UPRERA: 3375/AV/901official source ↗
  271. Permit revalidated
    as recorded by UPRERA: 3048/A-4/468official source ↗

Quarterly reports filed, by financial year

FY 2020-21
116 reports across 36 projects
FY 2021-22
107 reports across 32 projects
FY 2022-23
100 reports across 29 projects
FY 2023-24
85 reports across 25 projects
FY 2024-25
87 reports across 24 projects
FY 2025-26
88 reports across 28 projects
FY 2026-27
22 reports across 20 projects
Counts the reports UPRERA publishes as filed.
A filing is not an outcome.

Common questions about U.P. Awas Evam Vikas Parishad

How many projects has U.P. Awas Evam Vikas Parishad registered with RERA?

Estanzo holds 151 projects on record with UPRERA, filed by U.P. Awas Evam Vikas Parishad (promoter RERA ID UPRERAPRM4243). This counts filings by this legal entity only - a builder brand may file through several entities.

Who are the directors of U.P. Awas Evam Vikas Parishad?

U.P. Awas Evam Vikas Parishad disclosed 1 director or partner to UPRERA, listed on this page as published. Estanzo shows the names and roles from that filing only.

When was U.P. Awas Evam Vikas Parishad registered with RERA?

U.P. Awas Evam Vikas Parishad has been registered with UPRERA since 27 Jul 2017.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗