7th Avenue - Gaur City is a RERA-registered residential project by Gaursons Hi-Tech Infrastructure Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ6695). Registered with a completion deadline of 6 Mar 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6695 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Jan 2016 |
| Original start | 1 Jan 2016 |
| Project duration | 87 months |
| Address | Dadri, Gautam Budh Nagar |
| Tehsil | Dadri |
| Applicant type | Company |
| Applicant address | Gaur Biz Park Plot No-1, Abhay Khand-II Indirapuram, Ghaziabad, U.P. Pin-201014 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plg(BP)-3557/GH/6201
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- valid to
Permit revalidated
PLG/BP 3557/5967
Completion certificate filed
Completion certificate filed
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 7 Sept 2022 |
| Revised completion | 6 Mar 2023 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 18 Oct 2019 |
| Registration fee | ₹1,84,500 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK2,208 74%
- 3 BHK684 23%
- SHOP96 3%
- OTHER7 <1%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 2,208 | 50-59 |
| OTHER | 7 | 72-1,543 |
| SHOP | 96 | 9-88 |
| 3 BHK | 684 | 60-71 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| BLOCK-A · SHOP, 2 BHK | 33 | 266 | 15-59 |
| BLOCK-B · 2 BHK | 32 | 256 | 59 |
| BLOCK-C · 2 BHK | 32 | 256 | 50 |
| BLOCK-D · 2 BHK | 32 | 256 | 50 |
| BLOCK-E · 2 BHK | 32 | 256 | 50 |
| BLOCK-F · 2 BHK | 32 | 256 | 50 |
| BLOCK-G · 2 BHK | 32 | 256 | 50 |
| BLOCK-H · OTHER, 2 BHK | 22 | 162 | 58 |
| BLOCK-I · SHOP, 3 BHK | 33 | 268 | 13-70 |
| BLOCK-J · SHOP, 3 BHK | 33 | 268 | 13-71 |
| BLOCK-K · SHOP, 2 BHK | 33 | 266 | 9-54 |
| BLOCK-L · SHOP, OTHER, 3 BHK | 25 | 229 | 10-88 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Designated plots is demarcated as per the Lease plan issued by the authority |
| 2 | Boundary Wall Boundary wall has already been constructed on site |
| 3 | Road Work Internal roads designed of different R.O.W. as per requirement |
| 4 | Footpaths Footpaths is provided as per the Layout plan |
| 5 | Water Supply Including Drinking Water Facilities Municipal water supply is used for drinking purpose. |
| 6 | Sewer System Sewerage system is used with STP as per the design calculation |
| 7 | Drain Separate drainage line is used as per the design requirement |
| 8 | Parks Landscape area is provided as per Local Building Bye-laws |
| 9 | Tree Planting No. of trees as per the approved drawings & requirements. |
| 10 | Design For Electric Supply Including Street Lighting Electric supply including street lighting is provided as per the Layout plan. |
| 11 | Community Buildings Designed for community facilities as per the design requirement |
| 12 | Treatment and Disposal System of Sewage and Sullage water Disposal system of Sewage and Sullage water is being used through STP which is used for Landscape and flushing purpose. |
| 13 | Solid Waste Management And Disposal System All the solid waste managed as per the biogradible waste converted in to compost and non biogradible delivered to registered recyclable agencies. |
| 14 | Water Conservation System Low flow water fixtures being used for water conservation and STP water is used for landscape and flushing purpose. |
| 15 | Energy Management System Including Use of Renewable Energy Specific U-value glass is used for energy management and for roof insulation light colour tiles is used, and for renewable energy Solar photovoltic energy is used for common areas. |
| 16 | Fire Protection And Fire Safety System Fire system and fire safety system is installed in the buildings as per the NBC norms. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Social infrastructure and other public amenities including public health services are provided as per local Building Bye-laws |
| 18 | Emergency Evacuation Services As per Enviornment management plan and Disaster management plan all provisions are made including assembly point |
| 19 | Other Miscellaneous Work Other Miscellaneous work is provided as per the Layout Plan |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 8 Oct 2020. It carries a revalidation, valid to 7 Sept 2022.
Sanctioned by Greater Noida Authority · 35,880 sqm of land · an approved plan of 12 blocks and 2995 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Plg(BP)-3557/GH/6201 | 9 Oct 2015 | 8 Oct 2020 | 6 Sept 2027 | 7 Sept 2022 | 8 Sept 2017 valid to 7 Sept 2022 as PLG/BP 3557/5967 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 6 Mar 2023.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 7 Sept 2022 | 6 Mar 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-01 | 503216 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 5 May 2010.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 8016 | 5 May 2010 | self | — |
| Lease deed · 8016 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 10 Aug 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 29 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 29 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 29 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 29 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 29 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 29 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 20 Nov 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 20 Nov 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 20 Nov 2020 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 31 Jul 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 31 Jul 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 31 Jul 2017 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 31 Jul 2017 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 31 Jul 2017 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 31 Jul 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 31 Jul 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 31 Jul 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 31 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | yes |
| Fire safety (as filed with RERA) | yes |
| Renewable energy | yes |
| Other facilities | Community and Landscaping |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
12 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
12 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Gaursons Hi-Tech Infrastructure Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM1769 |
| PAN | AACCG8097J |
| CIN / TAN | DELG10667G |
| Name of chairman | Manoj Gaur |
| Registered address | Gaur Biz Park Plot No-1, Abhay Khand-II Indirapuram, Ghaziabad, U.P. Pin-201014 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Gaursons Hi-Tech Infrastructure Private LimitedBankBank of BarodaBranchPARLIAMENT NEW DELHIA/C no.IFSCBARB0PARLIA |
What has changed on this record
4 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 648 (Under Registration - 2 ) → 648 (Under Registration - 0 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 648 (Under Registration - 3 ) → 648 (Under Registration - 2 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 647 (Under Registration - 2 ) → 648 (Under Registration - 3 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 647 (Under Registration - 3 ) → 647 (Under Registration - 2 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 25 Sept 2026 · 4 movements on record |
Common questions about 7th Avenue - Gaur City
Is 7th Avenue - Gaur City RERA registered?
Yes. 7th Avenue - Gaur City is registered with UPRERA under registration number UPRERAPRJ6695, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has 7th Avenue - Gaur City been completed?
UPRERA still lists 7th Avenue - Gaur City as Registered, so it is not shown as completed here. A completion certificate dated 18 Oct 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of 7th Avenue - Gaur City?
Gaursons Hi-Tech Infrastructure Private Limited is the promoter entity that filed 7th Avenue - Gaur City with UPRERA (promoter RERA ID UPRERAPRM1769). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted 7th Avenue - Gaur City more time to complete?
UPRERA's record carries 1 completion extension for 7th Avenue - Gaur City, the latest running to 6 Mar 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does 7th Avenue - Gaur City have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is 7th Avenue - Gaur City located?
7th Avenue - Gaur City is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in 7th Avenue - Gaur City?
The unit plan filed with UPRERA lists 2 BHK, OTHER, SHOP and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in 7th Avenue - Gaur City?
The approved unit plan filed with UPRERA runs from 9 to 1,543 m² of carpet area (about 99 to 16,614 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in 7th Avenue - Gaur City?
The approved unit plan describes 12 blocks and 2,995 units of which 2,899 are homes and 96 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is 7th Avenue - Gaur City?
About 338 units per acre: 2,995 planned units across 8.87 acres (35,880 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗