ADITYA SCO COMPLEX

UPRERARegistered

ADITYA SCO COMPLEX is a RERA-registered commercial project by UTILITY ESTATES PRIVATE LIMITED in PARK TOWN, INTEGRATED TOWNSHIP, SHAHPUR BAMHETA, PARGANA DASNA,, Ghaziabad (RERA ID UPRERAPRJ645055). Registered with a completion deadline of 31 Dec 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
49.34%Q3'25
56.84%Q4'25
57.5%Q1'26
71.69%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ645055
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Aug 2024
Project duration53 months
AddressPLOT NO.- COMMERCIAL-2, PARK TOWN, INTEGRATED TOWNSHIP, SHAHPUR BAMHETA, PARGANA DASNA,, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address10, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    COMMERCIAL BUILDING/07390/GDA/BP/24-25/0448/11072024

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Sept 2024
Original completion31 Dec 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹45,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors108 · 1 · 5 (units from plan)
Homes · commercial units0 · 108 (shops and offices filed in the same plan)
ConfigurationUnitsCarpet area
SHOP10819-179
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
ADITYA SCO COMPLEX · SHOP510819-179
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
GIAN P. MATHUR FOR GIAN P. MATHUR AND ASSOCIATES PRIVATE LIMITED
License CA/80/05769
C-55, EAST OF KAILASH NEW DELHI-110065 PH. +91 11 46599599, WEBSITE WWW.GPMINDIA.COM
Engineer
GULAM SARWAR FOR KEEN ASSOCIATES PVT. LTD.
FIRST FLOOR, H-53, COMMERCIAL AREA, SECTOR-63 NOIDA, UTTAR PRADESH PH +91 120 4240514
Contractor
GLOBAL ENGINEERING CONTRACTS INDIA
F-411, SECTOR-17, VASUNDHARA, GHAZIABAD, UTTAR PRADESH-201012
Sr.Development work declared to RERA
1Demarcation of Plots
30.00 METER ROAD TO THE SOUTH EAST, OTHER PROPERTY TO THE NORTH WEST AND SOUTH WEST AND 30.00 METER GREEN BELT TO THE NORTH EAST.
2Boundary Wall
COMBINATION OF RCC COLUMN/BEAM WITH 230MM WIDE BRICK WORK/MS WORK WITH 1.80 METER HEIGHT APPROX.
3Road Work
COMBINATION OF 100MM THICK CONCRETE FLOORING/CONCRETE PAVER WITH GSB BASE HAVING DRIVE WAY WIDTH OF 6.00 METER.
4Footpaths
COMBINATION OF PAVERS/SOFT DEVELOPMENT ON COMPACTED SUBGRADE.
5Water Supply Including Drinking Water Facilities
THE MAIN SOURCE OF DRINKING WATER WILL BE GROUND WATER AND SHALL BE EXTRACTED THROUGH TUBE WELL AND SUPPLIED BY UNDERGROUND WATER TANK APPROX. 15 KLD RWA WATER/15KLD DOMESTIC TANK CAPACITY EACH AND OVERHEAD WATER TANK HAVING TWO CHAMBERS OF APRROXIMATE CAPACITY OF DOMESTIC 15 KL AND FIRE 10 KL EACH.
6Sewer System
THE SOIL AND WASTE SHALL BE CARRIED DOWN IN SEPARATE INDEPENDENTLY VENTED RCC NP2 PIPES HAVING DIAMETER FROM 150MM TO 250MM. TWO PIPE DRAINAGE SYSTEMS SHALL BE ADOPTED AS PER ASPE STANDARD.
7Drain
SEPARATE AND INDEPENDENT RAINWATER DRAINAGE SYSTEM SHALL BE PROVIDED FOR COLLECTING RAINWATER FROM TERRACE, PAVED AREA, LAWNS AND ROAD WITH VERTICAL UPVC PIPES 100MM DIA AND HORIZONTAL RCC HUMES PIPES 200-300MM DIA.
8Parks
Green Area is 349.58 sqm.
9Tree Planting
DOCUMENT ATTACHED PLANTING STRATEGY APPROX. 15 TREES SHALL BE PLNTED ALONG BOUNDARY/OPEN AREA.
10Design For Electric Supply Including Street Lighting
11KV INCOMING SUPPLY SHALL BE PROVIDED. WHICH SHALL BE CONVERTED IN 415V SUPPLY AND SAME SHALL BE FEED ENTIRE SYSTEM. THE TIME SWITCH OPERATED EXTERNAL LIGHT SHALL BE PROVIDED. THE LUX LEVEL SHALL BE MEET AS PER NBC -2016 GUIDELINES. APPROX. 60 NO. OF DIFFERENT HEIGHT ALONG ROAD/OPEN AREAS ARE PLANNED.
11Community Buildings
N.A.
12Treatment and Disposal System of Sewage and Sullage water
CONNECTED TO SEWRAGE TREATMENT PLANT OF APPROX. CAPACITY OF 30 KLD FOR TREATMENT OF SEWRAGE AND SULLGE WASTE. THE PLANT SHALL COMPRISE OF PRELIMINARY, SECONDARY(CHEMICAL AND BIOLOGICAL) AND TERTIARY TREATMENT UNITS.
13Solid Waste Management And Disposal System
CLOSED CONTAINER WILL BE PROVIDE FOR COLLECTION OF SOLID WASTE AND WILL BE DISPOSED AS PER DUE PROCESS
14Water Conservation System
1 HARVESTING CHAMBER HAVING DESILTING CHAMBER OF 3.00 METER X 1.5 METER X 1.5 METER DEPTH AND HARVESTING PIT OF 3.0 METER DIAMETER AND 3 METER DEPTH SHALL BE DONE
15Energy Management System Including Use of Renewable Energy
Yes, We are providing Solar Panel system as shown on terrace floor of sheet no. 5/6 in sanctioned drawing.
16Fire Protection And Fire Safety System
AS PER FIRE NORMS PROVIDED (NBC-2016)
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A. (It is a Commercial Building)
18Emergency Evacuation Services
STAIRECASE HAVING WIDTH OF 1.50 METER AND 300MM TREAD/150MM RISER AS DESIRED WITH SINAGE PLANNED
19Other Miscellaneous Work
NIL
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 28 Jul 2029.

Sanctioned by Ghaziabad Development Authority · 3,491 sqm of land · an approved plan of 1 block and 108 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
COMMERCIAL BUILDING/07390/GDA/BP/24-25/0448/1107202429 Jul 202428 Jul 202928 Jul 203231 Dec 2028
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
16431038Khasra
16441136Khasra
16451229Khasra
164688.61Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1430-1435
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 3477
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3487
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3487
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New1 Aug 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New1 Aug 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New1 Aug 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New1 Aug 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New1 Aug 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New1 Aug 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New17 Aug 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New1 Aug 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New1 Aug 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New1 Aug 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New1 Aug 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New1 Aug 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New6 Sept 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New1 Aug 2024 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2024-Q2 to 2026-Q2.

QuarterConstructionCertificates
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q249.34%CA ↗ · Arch ↗ · Eng ↗
2025-Q356.84%CA ↗ · Arch ↗ · Eng ↗
2025-Q457.5%CA ↗ · Arch ↗ · Eng ↗
2026-Q171.69%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameUTILITY ESTATES PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM1595
PANAAACU5134E
CIN / TANU45202DL2001PTC113391
Name of chairmanMR. BIR SINGH PUNDIR
Registered address10, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UTILITY ESTATES PRIVATE LIMITED-COLLECTION ACCOUNT FOR ADITYA SCO COMPLEXBankAU SMALL FINANCE BANK LIMITEDBranchINDIRAPURAM GHAZIABADBranch addressPLOT NO.- 8, SPACE NO. 1, GAUR GRAVITY BLOCK NO. A AND B, VAIBHAV KHAND INDIRAPURAM GHAZIABAD UTTAR PRADESH- 201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCAUBL0002480Branch emailINDRAPURAM_GHAZIABAD@AUBANK.IN
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UTILITY ESTATES PRIVATE LIMITED-SEPARATE BANK ACCOUNT FOR ADITYA SCO COMPLEXBankAU SMALL FINANCE BANK LIMITEDBranchINDIRAPURAM GHAZIABADBranch addressPLOT NO.- 8, SPACE NO.- 1, GAUR GRAVITY, BLOCK NO. A AND B, VAIBHAV KHAND, INDIRAPURAM GHAZIABAD, U.P. 201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCAUBL0002480
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UTILITY ESTATES PRIVATE LIMITED-RERA TRANSACTION ACCOUNT FOR ADITYA SCO COMPLEXBankAU SMALL FINANCE BANK LIMITEDBranchINDIRAPURAM GHAZIABADBranch addressPLOT NO.-8, SPACE NO.-1, GAUR GRAVITY BLOCK A AND B VAIBHAV KHAND INDIRAPURAM GHAZIABAD U.P. 201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCAUBL0002480
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
19 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about ADITYA SCO COMPLEX

Is ADITYA SCO COMPLEX RERA registered?

Yes. ADITYA SCO COMPLEX is registered with UPRERA under registration number UPRERAPRJ645055, registered on 27 Sept 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ADITYA SCO COMPLEX?

The completion date filed with UPRERA is 31 Dec 2028. No completion certificate is on record yet.

Who is the builder of ADITYA SCO COMPLEX?

UTILITY ESTATES PRIVATE LIMITED is the promoter entity that filed ADITYA SCO COMPLEX with UPRERA (promoter RERA ID UPRERAPRM1595). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does ADITYA SCO COMPLEX have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ADITYA SCO COMPLEX located?

ADITYA SCO COMPLEX is registered in PARK TOWN, INTEGRATED TOWNSHIP, SHAHPUR BAMHETA, PARGANA DASNA,, Ghaziabad, as filed with UPRERA.

What configurations are available in ADITYA SCO COMPLEX?

The unit plan filed with UPRERA lists SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in ADITYA SCO COMPLEX?

The approved unit plan filed with UPRERA runs from 19 to 179 m² of carpet area (about 202 to 1,923 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in ADITYA SCO COMPLEX?

The approved unit plan describes 1 block and 108 units of which 0 are homes and 108 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is ADITYA SCO COMPLEX?

About 125 units per acre: 108 planned units across 0.86 acres (3,491 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗