AMAATRA CRYSTAL (Formerly CRYSTAL) is a RERA-registered residential project by S B LANDCON PVT LTD in Ghaziabad (RERA ID UPRERAPRJ13055). Registered with a completion deadline of 30 Sept 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ13055 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 25 Oct 2015 |
| Original start | 25 Oct 2015 |
| Project duration | 120 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | 59 SHIVA KHAND VIVEK VIHAR DELHI |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
65/ZONE-5/2014-15
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Permit revalidated (2)
2 building permits sanctioned
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated
639/Pravartan Zone - 5/ 2023
Building permit sanctioned
639/Pravartan Zone - 5/ 2023
- to
Extension granted
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
2 completion certificates filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 26 Sept 2017 |
| Original completion | 31 Dec 2022 |
| Revised completion | 30 Sept 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 10 Mar 2026 |
| Registration fee | ₹23,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK75 51%
- 3 BHK44 30%
- 4 BHK28 19%
- 1 BHK1 1%
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 1 | 46 |
| 2 BHK | 75 | 54-65 |
| 3 BHK | 44 | 79 |
| 4 BHK | 28 | 118-126 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| CRYSTAL (S-1) · 1 BHK, 2 BHK, 3 BHK, 4 BHK | 22 | 148 | 46-126 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots GH Plot No. 2, Jaipuria Sunrise Greens, Opposire Manipal Hospital, NH-24, Ghaziabad. |
| 2 | Boundary Wall Boundary wall upto 3 meters height on the four sides of the plot shall be provided. |
| 3 | Road Work All roads in integrated society township will be combination of concrete in desired thickness as per drawing, will be executed later. |
| 4 | Footpaths All footpaths in the integrated society township will be made from the concrete pavers of different color, shape and thickness. |
| 5 | Water Supply Including Drinking Water Facilities Water supply including drinking facility and other misc. work will be provided in the integrated society as required places. |
| 6 | Sewer System Main sewer line has been designed as per norms and partially lay in basement ceiling and will finally connect to the STP. |
| 7 | Drain Underground system using uPVC and masonry chambers for smooth drainage system. |
| 8 | Parks Parks in the integrated society shall be provided as per approved map. |
| 9 | Tree Planting Tree planting has been designed as per the Authority guidelines/ approved drawings. |
| 10 | Design For Electric Supply Including Street Lighting Design has been done as per UP Electricity Board guidelines and shall be provided necessary switchgear, etc. for distributing electricity at LT voltage |
| 11 | Community Buildings Club has been designed as per authority norms/ approved drawings and facilities like Party Hall, Gaming Zone, Entertainment Area, etc. shall be provided. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Capacity of the STP shall be provided as per norms. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer. |
| 13 | Solid Waste Management And Disposal System Manual collection and organic waste converted shall be provided in the Project. |
| 14 | Water Conservation System Recycling of treated water and rainwater system shall be provided. |
| 15 | Energy Management System Including Use of Renewable Energy Single point metering will be there for energy purchase from the grid/ power supply company. |
| 16 | Fire Protection And Fire Safety System Fire tender road shall be provided as per NBC. Fire fighting system along with pumps and water storage tanks shall be provided as per NBC and NOC from fire department |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Facilities of STP, organic waste converted shall be provided. |
| 18 | Emergency Evacuation Services Staircase shall be constructed in the tower to exit in emergency exit as per norms. |
| 19 | Other Miscellaneous Work Building space, retail shops, etc. shall be sold. |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 DEGREE VENTURES PRIVATE LIMITED | UPRERAAGT18728 |
Permits & extensions
4 permits
An approval and the date it runs to - not proof the work matching it was done.
4 sanctioning permits are on record with UPRERA, the latest valid to 28 Mar 2025. 3 of them carry a revalidation.
Sanctioned by Ghaziabad Development Authority · 3,540 sqm of land · an approved plan of 1 block and 148 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 65/ZONE-5/2014-15 | 1 Jul 2014 | 1 Jul 2019 | 30 Jun 2023 | 30 Jun 2023 | — | |
| 639/Pravartan Zone - 5/ 2023 | 28 Mar 2023 | 28 Mar 2025 | 28 Mar 2025 | 30 Jun 2023 | 28 Mar 2023 | |
| 639/Pravartan Zone - 5/ 2023 | 17 Nov 2020 | 30 Jun 2022 | 28 Mar 2025 | 28 Mar 2025 | 17 Nov 2020 | |
| 639/Pravartan Zone - 5/ 2023 | 17 Nov 2020 | 30 Jun 2022 | 30 Sept 2025 | 30 Sept 2025 | 17 Nov 2020 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 30 Sept 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2022 | 30 Jun 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jun 2023 | 28 Mar 2025 | — |
| 3 | 28 Mar 2025 | 30 Sept 2025 | — |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1471 | 66 | — |
| 1483 | 1140 | — |
| 1484 | 702 | — |
| 1485 | 1634 | — |
| 1471 | 66 | Khasra |
| 1483 | 1140 | Khasra |
| 1484 | 702 | Khasra |
| 1485 | 1634 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 14 Jan 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 272/65-92/12625/1 | 14 Jan 2015 | self | — |
| Registry document · 12625 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 7 Oct 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 26 Jul 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 26 Jul 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 26 Jul 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 26 Jul 2022 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 25 Sept 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 25 Sept 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Yes |
| Fire safety (as filed with RERA) | Approval Details |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
22 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
22 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 88.56% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | S B LANDCON PVT LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM12552 |
| PAN | AATCS9036L |
| CIN / TAN | U70100DL2013PTC260840 |
| Name of chairman | RUPESH AGGARWAL, PAWAN GARG |
| Registered address | 59 SHIVA KHAND VIVEK VIHAR DELHI |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | S. B. LANDCON PVT LTD - COLLECTION ACCOUNT FOR AMAATRA CRYSTALBankAU SMALL FINANCE BANK LIMITEDBranchRAJ NAGAR, GHAZIABADBranch addressC-29, RDC, Raj Nagar Ghaziabad-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCAUBL0002105Branch emailyunjanika.sharma.aubank.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | S B LANDCON PVT LTD SEPARATE BANK ACCOUNT AMAATRA CRYSTALBankAU SMALL FINANCE BANK LIMITEDBranchRAJ NAGAR GHAZIABADBranch addressC-29, RDC, Raj Nagar Ghaziabad-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCAUBL0002105Branch emailyunjanika.sharma.aubank.in |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | S. B. LANDCON PVT LTD - RERA TRANSACTION ACCOUNT FOR AMAATRA CRYSTALBankAU SMALL FINANCE BANK LIMITEDBranchRAJ NAGAR GHAZIABADBranch addressC-29, RDC, Raj Nagar Ghaziabad-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCAUBL0002105Branch emailyunjanika.sharma.aubank.in |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 2 (Under Registration - 2 ) → 2 (Under Registration - 0 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 0 (Under Registration - 0 ) → 2 (Under Registration - 2 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 9 Sept 2026 · 2 movements on record |
Common questions about AMAATRA CRYSTAL (Formerly CRYSTAL)
Is AMAATRA CRYSTAL (Formerly CRYSTAL) RERA registered?
Yes. AMAATRA CRYSTAL (Formerly CRYSTAL) is registered with UPRERA under registration number UPRERAPRJ13055, registered on 26 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has AMAATRA CRYSTAL (Formerly CRYSTAL) been completed?
UPRERA still lists AMAATRA CRYSTAL (Formerly CRYSTAL) as Registered, so it is not shown as completed here. A completion certificate dated 10 Mar 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of AMAATRA CRYSTAL (Formerly CRYSTAL)?
S B LANDCON PVT LTD is the promoter entity that filed AMAATRA CRYSTAL (Formerly CRYSTAL) with UPRERA (promoter RERA ID UPRERAPRM12552). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted AMAATRA CRYSTAL (Formerly CRYSTAL) more time to complete?
UPRERA's record carries 3 completion extensions for AMAATRA CRYSTAL (Formerly CRYSTAL), the latest running to 30 Sept 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does AMAATRA CRYSTAL (Formerly CRYSTAL) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is AMAATRA CRYSTAL (Formerly CRYSTAL) located?
AMAATRA CRYSTAL (Formerly CRYSTAL) is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in AMAATRA CRYSTAL (Formerly CRYSTAL)?
The unit plan filed with UPRERA lists 1 BHK, 2 BHK, 3 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in AMAATRA CRYSTAL (Formerly CRYSTAL)?
The approved unit plan filed with UPRERA runs from 46 to 126 m² of carpet area (about 500 to 1,359 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in AMAATRA CRYSTAL (Formerly CRYSTAL)?
The approved unit plan describes 1 block and 148 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is AMAATRA CRYSTAL (Formerly CRYSTAL)?
About 169 units per acre: 148 planned units across 0.87 acres (3,540 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.