Anthem is a RERA-registered residential project by M/S BHARAT NAGAR HOUSING in Agra (RERA ID UPRERAPRJ8530). Registered with a completion deadline of 5 Sept 2022.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ8530 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Jul 2017 |
| Original start | 1 Jul 2017 |
| Project duration | 63 months |
| Address | Agra, Agra |
| Tehsil | Agra |
| Applicant type | Partnership Firm |
| Applicant address | 2/27, SETH GALI,AGRA |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
573/NP02/2017
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated
199
Building permit sanctioned
199
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 11 Aug 2017 |
| Original completion | 30 Jul 2018 |
| Revised completion | 5 Sept 2022 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 11 Mar 2022 |
| Registration fee | ₹5,74,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots This is irregular shape of plot, having total 12 no. of entry gate in which 1 main gate having grand entrance from the 24m wide front road and rest of 11 are secondary gates. Site is covered by many housing society. |
| 2 | Boundary Wall 3 m high and 230 mm thick Boundary wall designed with european theme. AAC block work and rcc work in column and beam. At the center face of boundary wall there is a Logo of Anthem which give a beautiful iconic design to boundary wall. |
| 3 | Road Work At the main avenue dark gray and light gray colors cobble stones are used and bitumen road. |
| 4 | Footpaths There are 3 type of road in this society (7.5 m, 9m and 10.5m), having 1.5 m wide footpath. 60 mm thick pavers used in footpath with beautiful pattern. |
| 5 | Water Supply Including Drinking Water Facilities UP JAl Board will provide the water supply to each Plot and Individual tenant may be also ground water after taking approval from statuary departmen. Also end user shall be used their individual RO system as per their requirement, if required we can consider overhead tank also of appropriate capacity to cover the water supply for entire town ship. |
| 6 | Sewer System Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system. |
| 7 | Drain Storm water shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municple drain line. Also as per CGWA, each tenant have to construct individual Plot RWH if plot area shall be more 100 sqmt. |
| 8 | Parks There are 4 main central park are provided with the different activities and another park is near club and ews having gaming and swimming pool facilities. |
| 9 | Tree Planting There are 5 type of trees povided in site with the total no. of 480. which are kachnar, gulmauhar, amaltas, kusum and neem. |
| 10 | Design For Electric Supply Including Street Lighting We have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,Fountain,STP,Pump room etc. |
| 11 | Community Buildings A club is provided in Anthem, which is designed in beautiful european theme. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system. |
| 13 | Solid Waste Management And Disposal System There are a proper garbage collection area provided for the solid waste management. |
| 14 | Water Conservation System We will sugggested to tenant to use low flow fixtures as well dual flush cistern and rai water harvesting system to reduce the water consumption and improve the ground water level. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.And we will suggest to tenant also to use LED lights Fitting. |
| 16 | Fire Protection And Fire Safety System This Project don’t have any high rise building, its have individual Plot for Residential as well as Commercial.Hence there are not need to do any Fire Fighting facility.Individual owner can be installed their own system as per their and local authorities requirement. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municple drain. |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 6 Mar 2022. 1 of them carries a revalidation.
Sanctioned by U.P. Awas Evam Vikas Parishad · 1,11,689 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 573/NP02/2017 | 7 Mar 2017 | 6 Mar 2022 | 6 Mar 2025 | 6 Mar 2022 | — | |
| 199 | 28 Jan 2022 | 6 Mar 2022 | 6 Mar 2025 | 5 Sept 2022 | 28 Jan 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 5 Sept 2022.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jul 2018 | 6 Mar 2022 | — |
| 2 | 6 Mar 2022 | 5 Sept 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| POCKET-A, SECTOR-15, AVAS VIKAS YOJNA, AVAS VIKAS | 113777.29 SQ.MTR. | — |
| POCKET-A, SECTOR-15, AVAS VIKAS YOJNA, AVAS VIKAS | 113777.29 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 4 Jan 2017.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| BAHI NO.1 JILD NO. 12662 PAGE NO. 155 TO 176 SERIA | 4 Jan 2017 | self | — |
| Sale deed · BAHI NO.1 JILD NO. 12662 PAGE NO. 155 TO 176 SR.NO. 52 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 8 Aug 2017 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 8 Aug 2017 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 8 Aug 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 8 Aug 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 8 Aug 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 8 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Other facilities | NO |
Quarterly progress reports
10 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
10 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | M/S BHARAT NAGAR HOUSING |
| Role | Promoter · current |
| RERA ID | UPRERAPRM17432 |
| PAN | AAMFB9466D |
| Registered address | 2/27, SETH GALI,AGRA |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Agra
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | BHARAT NAGAR HOUSINGBankYES BANK LIMITEDBranchMAIN BRANCH, AGRAA/C no.IFSCYESB0000050 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Anthem
Is Anthem RERA registered?
Yes. Anthem is registered with UPRERA under registration number UPRERAPRJ8530, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Anthem been completed?
UPRERA still lists Anthem as Registered, so it is not shown as completed here. A completion certificate dated 11 Mar 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Anthem?
M/S BHARAT NAGAR HOUSING is the promoter entity that filed Anthem with UPRERA (promoter RERA ID UPRERAPRM17432). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Anthem more time to complete?
UPRERA's record carries 2 completion extensions for Anthem, the latest running to 5 Sept 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Anthem have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Anthem located?
Anthem is registered in Agra, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗