Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ9438
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAgra Development Authority
Proposed start21 Jul 2014
Original start21 Jul 2014
Project duration98 months
AddressAgra, Agra
TehsilAgra
Applicant typeCompany
Applicant addressSHOP NO S-4,4A II ND FLOOR APARNA MALL HOSPITAL ROAD AGRA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    1052/BFL/1/02-03

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. valid to

    Permit revalidated

    1052/BFL/1/02-03/1

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion21 Mar 2022
Revised completion20 Sept 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary7 Jan 2025
Registration fee₹1,31,000
Sanctioning authorityAgra Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors462 · 5 · 15 (units from plan)
  • 2 BHK352 76%
  • 3 BHK110 24%
ConfigurationUnitsCarpet area
2 BHK35280
3 BHK110105
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK A · OTHER, 2 BHK158880
BLOCK B · OTHER, 2 BHK158880
BLOCK C · OTHER, 2 BHK158880
BLOCK D · OTHER, 2 BHK158880
BLOCK E · OTHER, 3 BHK15110105
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Amit Juneja
License CA/2003/31190
Gee Gee Nursing Home,Sanjay Palace, Agra
Engineer
Iqbal Bahadur
Sanjay Palace, Agra
Contractor
Arvind Construction company
village, cegunna,kirawali,Agra
Sr.Development work declared to RERA
1Demarcation of Plots
The project land is demarcated with boundary wall
2Boundary Wall
12 feet high secured boundary wall
3Road Work
Interlocking paver block
4Footpaths
Interlocking paver block
5Water Supply Including Drinking Water Facilities
24x7 water supply through OHT
6Sewer System
As per Approved design
7Drain
Open Surface lined drain
8Parks
Lush green 2 parks
9Tree Planting
Tree planting along the boumdary wall and in park
10Design For Electric Supply Including Street Lighting
Separate Transformer dedicated for project supply - DVSNL
11Community Buildings
Clubhouse for residents gathering and enjoyment
12Treatment and Disposal System of Sewage and Sullage water
As per approved design
13Solid Waste Management And Disposal System
N.A.
14Water Conservation System
Rain water Harevesting
15Energy Management System Including Use of Renewable Energy
N.A
16Fire Protection And Fire Safety System
As per Fire department Norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A.
18Emergency Evacuation Services
As per Fire department Norms
19Other Miscellaneous Work
As required
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Mar 2017. It carries a revalidation, valid to 31 May 2022.

Sanctioned by Agra Development Authority · 25,143 sqm of land · an approved plan of 5 blocks and 462 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
1052/BFL/1/02-0322 Mar 201222 Mar 201731 May 202221 Mar 20221 Jun 2017
valid to 31 May 2022
as 1052/BFL/1/02-03/1
Plans and approvals filed with RERA
DocumentFile
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 20 Sept 2022.

#Granted fromExtended uptoNote
121 Mar 202220 Sept 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2082918 sq. m—
20622224.92 sq. m—
206, 208 in Parts132Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

5 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 3 Jun 2011.

Registry no.DateTypeArea
915316 Aug 2011self—
886218 Jul 2011self—
1026212 Sept 2011self—
111527 Oct 2011self—
60463 Jun 2011self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 9153
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8862
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8074
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7809
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8128
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old11 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old11 Aug 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old11 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old11 Aug 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old11 Aug 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old11 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old11 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking wateravailable
Fire safety (as filed with RERA)available
Health serviceGYM,PARK, CLUB HOUSE
Other facilitiesSTP

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePREM INFRACITY PVT LTD
RolePromoter · current
RERA IDUPRERAPRM13614
PANAAFCP7090K
CIN / TANU70102UP2010PTC040660
Name of chairmanASHISH MANGAL
Registered addressSHOP NO S-4,4A II ND FLOOR APARNA MALL HOSPITAL ROAD AGRA
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Agra

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PREM INFRACITY PVT. LTD.BankBank of indiaBranchSANJAY PALACEA/C no.IFSCBKID0007254
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about aparna prem

Is aparna prem RERA registered?

Yes. aparna prem is registered with UPRERA under registration number UPRERAPRJ9438, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has aparna prem been completed?

UPRERA still lists aparna prem as Registered, so it is not shown as completed here. A completion certificate dated 7 Jan 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of aparna prem?

PREM INFRACITY PVT LTD is the promoter entity that filed aparna prem with UPRERA (promoter RERA ID UPRERAPRM13614). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted aparna prem more time to complete?

UPRERA's record carries 1 completion extension for aparna prem, the latest running to 20 Sept 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does aparna prem have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is aparna prem located?

aparna prem is registered in Agra, as filed with UPRERA.

What configurations are available in aparna prem?

The unit plan filed with UPRERA lists OTHER, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in aparna prem?

The approved unit plan filed with UPRERA runs from 80 to 105 m² of carpet area (about 862 to 1,131 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in aparna prem?

The approved unit plan describes 5 blocks and 462 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is aparna prem?

About 74 units per acre: 462 planned units across 6.21 acres (25,143 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗