ARIHANT SEASONS

UPRERARegistered

ARIHANT SEASONS is a RERA-registered residential project by Arihant Urban Space Private Limited in Sector 22D, YEIDA, Gautam Budh Nagar (RERA ID UPRERAPRJ974543). Registered with a completion deadline of 5 Jan 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ974543
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryYamuna Expressway Authority
Proposed start16 Jan 2026
Project duration60 months
AddressGH-11, Sector 22D, Yamuna Expressway Industrial Development Authority (YEIDA), Gautam Budh Nagar, UP, Sector 22D, YEIDA, Jewar, Gautam Budh Nagar
TehsilJewar
Applicant typeCompany
Applicant address602 PLOT No 17 SACHDEVA, TOWER, KARKARDOOMA, East Delhi- 110092, Delhi
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    YEIDA/202601061142/2025/09/11/S/2203

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered24 Feb 2026
Original completion5 Jan 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,11,500
Sanctioning authorityYamuna Expressway Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,043 · 10 · 31 (units from plan)
Homes · commercial units1,028 · 15 (shops and offices filed in the same plan)
  • 3 BHK786 75%
  • 4 BHK230 22%
  • SHOP15 1%
  • 2 BHK8 1%
  • 5 BHK4 <1%
ConfigurationUnitsCarpet area
5 BHK4311-355
4 BHK230152-182
3 BHK78683-100
2 BHK863
SHOP1526-176
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 5 BHK, 4 BHK, OTHER31118182-355
B2 · 5 BHK, 4 BHK30116152-311
C1 · 3 BHK29114100
C2 · 3 BHK29116100
C3 · 3 BHK29116100
Commercial · SHOP11526-176
D3 · 3 BHK2811283
D4 · 3 BHK, 2 BHK2811263-83
D5 · 3 BHK, 2 BHK2811263-83
D6 · 3 BHK2811283
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
VISHAL SHARMA
License CA-1998/23261
B-421, NEW FRIENDS COLONY, NEW DELHI
Engineer
V.D. SHARMA
B-24, SECTOR 67, NOIDA, U.P.
Contractor
PRIME PERFECT BUILDCON PVT LTD
78A GALI NO-11, RAHUL VIHAR-II, SECTOR- 12 GHAZIABAD U.P.
Sr.Development work declared to RERA
1Demarcation of Plots
Plot area 41,252.32 Sqm Attached layout plan As Annexure -1 North-east - Others Property South-east - Others Property South-west - 45.0 Mt wide Road North-west - Others Property
2Boundary Wall
Combination of M.S railing and R.C.C wall. Thickness of boundary wall 300 mm and height of boundary wall 2100 mm.
3Road Work
Yes, concrete road/concrete Pavers with Kerb stone on edge. As per Architect Design.
4Footpaths
Yes, Footpath and walkway path designs will be provided, and all designs will be developed in accordance with the landscape consultants specifications and recommendations like 20 MM to 60 MM pawers etc.
5Water Supply Including Drinking Water Facilities
Yes, The water supply will be collected in underground water reservoirs/Tanks, and Terrace tanks will be filled through a pumping system. (As per Authority). UPVC/CPVC/GI pipe 15 MM to 80 MM as per design requirement.
6Sewer System
Yes, The soil and waste from toilets and kitchen will be collected in pipes / laid underground having Manholes/ Inspection Chambers at appropriate intervals. It is proposed to install sewage treatment plant on the site for treatment of sewage. The quantity of recycle water required in flushing, horticulture be treated up to tertiary level and the balance waste shall be discharged into municipal drainage system after the treatment. The total capacity of sewage treatment plant will be as per consultant around 690 kld. Hence sewage treatment plant shall be installed in various modules as per the growth of population. In this system, the entire civil work will be done at present, but the electro mechanical equipment will be installed for only will be installed as per population growth.
7Drain
Yes, stormwater will be collected in the R.W.H. (Rain Water Harvesting) having 6 pits, 1 pit of 21 cum. for groundwater recharge, and after percolation, the overflow water will be discharged into the municipal storm- water drainage system. (As per drawings by the consultant)
8Parks
Yes, Park designs with plants, water body and shrubs will be developed in accordance with the landscape consultants specifications and recommendations. Along with electrical pole of height 3 to 6 meters placed as per consultant.
9Tree Planting
Yes, as per the landscape consultants design. Around 401 trees.
10Design For Electric Supply Including Street Lighting
Yes, The building shall be supplied power by the State Electricity Board (NPCL). Since the source is unstable due to frequent brown out/ black out, it is proposed that DG power backup shall be provided to all the common services / Commercial Development / 4BHK and back up will be provided to 3BHK apartments with as per divercity factor. Some critical load such as emergency lighting, headed equipment of ELV system etc., shall be additionally backed up using UPS (Battery backup) system. Transformer capacity of 1600 kva.
11Community Buildings
Yes, the project is provided with facilities such as a banquet hall, swimming pool, gym, yoga area, sports hall, and other related amenities.
12Treatment and Disposal System of Sewage and Sullage water
The Treatment scheme is aerobic biological aeration treatment using the fluidized media process. The process is named as Moving Bed Bio Reactor (MBBR). Excess aerobic biological sludge generated will be thickened in the aerobic digester cum thickener tank. STP capicity of 690 kld. The treatment scheme proposed is split into three distinct parts 1. Pre-treatment, which comprises of screening, oil and grease trap. 2. Biological treatment comprising of fluidized media aeration followed by clarification. 3. Tertiary treatment comprising of dual media pressure filtration, activated carbon filtration and disinfection system etc.
13Solid Waste Management And Disposal System
Yes, solid waste will be managed by installing an organic waste converter and though segregation of waste at the household level. 400 kg of waste per day will be recycled.
14Water Conservation System
Yes, Water Conservation will be provided using low flow fixtures / flow restrictors etc. RWH of 6 nos.
15Energy Management System Including Use of Renewable Energy
Solar power system is a renewable energy system, converting the sunlight into electricity by using photovoltaic cells. The light is coverted into electricity by the use of photovoltaic effect. Solar panel shall be installed at the roof of building. Shadow free area shall be provided for the installation for the system at roof top. The solar cells shall face South direction to ensure direct exposure to sun rays. Solar capicity of 55 kwh (solar pv) Solar Plant shall comprise of the following. 1. The solar module to convert sunlight into DC electricity. 2. Using Grid Interactive Inverter (UNIT) to convert DC to AC and directly coupled with Grid Bus in Panel. 3. Further, load shall directly be connected to main bus of the panel.
16Fire Protection And Fire Safety System
As per sanctioned drawing by Fire Department, all provisions with fire pumps, sprinkler, yard hydrant, and automatic alarm systems required for a high-rise building shall be provided. External hydrant are 25 nos. and internal hydrant are 300 nos.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Toilets for disabled and visitors will be provided on the ground floor of every tower. Sports facilities will be provided as per the landscape plan.
18Emergency Evacuation Services
Refuge terraces are required for buildings above 60 m in height. Accordingly, refuge terraces have been provided in every block, along with a dedicated fire- tender path around each tower. (as per sanction plan). Tower A - Refuge areas are provided. Towers B2 - Refuge areas are provided. Tower C1 to C3 - Refuge areas are provided. Tower D3 to D6 - Refuge areas are provided. Balconies in every apartment. A continuous fire-tender path is also provided around each tower for emergency access.
19Other Miscellaneous Work
Guard room, entrance and exit gates, maintenance room, Retail Shops facility, CCTV, calling facility, and security guards for proper watch and ward.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 5 Jan 2031.

Sanctioned by Yamuna Expressway Authority · 41,252 sqm of land · an approved plan of 10 blocks and 1043 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
YEIDA/202601061142/2025/09/11/S/22036 Jan 20265 Jan 20315 Jan 20365 Jan 2031
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-11, Sector 22D, YEIDA42957Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 22169
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New12 Jan 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Jan 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New10 Jan 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New12 Jan 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New31 Jan 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New31 Jan 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Jan 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New31 Jan 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New10 Jan 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jan 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New10 Jan 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New12 Jan 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New10 Jan 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New14 Feb 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2025-Q4 to 2026-Q1.

QuarterConstructionCertificates
2025-Q40%CA ↗ · Arch ↗ · Eng ↗
2026-Q11%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameArihant Urban Space Private Limited
RolePromoter · current
RERA IDUPRERAPRM435544
PANABCCA7846A
CIN / TANDELA82704G
Name of chairmanKAUSHAL KUAMR JAIN
Registered address602 PLOT No 17 SACHDEVA, TOWER, KARKARDOOMA, East Delhi- 110092, Delhi
RERA contact
Registered since2026
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S. ARIHANT URBAN SPACE PVT. LTD. COLLECTION A/C FOR ARIHANT SEASONSBankHDFC BANK LTDBranchANSAL ARCADE SECTOR 18 NOIDABranch addressANSALS FORTUNE ARCADE, K BLOCK SECTOR 18, NOIDA, GAUTAM BUDDH NAGAR , UTTAR PRADESH 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088Branch emailneeraj.kumar36@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/S. ARIHANT URBAN SPACE PVT. LTD. SEP BANK A/C FOR ARIHANT SEASONSBankHDFC BANK LTDBranchANSAL ARCADE SECTOR 18 NOIDABranch addressANSALS FORTUNE ARCADE, K BLOCK, SECTOR 18, NOIDA, GAUTAM BUDDH NAGAR , UTTAR PRADESH 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S. AUSPL RERA TRN A/C FOR ARIHANT SEASONSBankHDFC BANK LTDBranchANSAL ARCADE SECTOR 18 NOIDABranch addressANSAL FORTUNE ARCADE, K BLOCK SECTOR 18, NOIDA GAUTAM BUDDH NAGAR , UTTAR PRADESH 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about ARIHANT SEASONS

Is ARIHANT SEASONS RERA registered?

Yes. ARIHANT SEASONS is registered with UPRERA under registration number UPRERAPRJ974543, registered on 24 Feb 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ARIHANT SEASONS?

The completion date filed with UPRERA is 5 Jan 2031. No completion certificate is on record yet.

Who is the builder of ARIHANT SEASONS?

Arihant Urban Space Private Limited is the promoter entity that filed ARIHANT SEASONS with UPRERA (promoter RERA ID UPRERAPRM435544). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does ARIHANT SEASONS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is ARIHANT SEASONS located?

ARIHANT SEASONS is registered in Sector 22D, YEIDA, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in ARIHANT SEASONS?

The unit plan filed with UPRERA lists 5 BHK, 4 BHK, 3 BHK, OTHER, 2 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in ARIHANT SEASONS?

The approved unit plan filed with UPRERA runs from 26 to 355 m² of carpet area (about 285 to 3,818 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in ARIHANT SEASONS?

The approved unit plan describes 10 blocks and 1,043 units of which 1,028 are homes and 15 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is ARIHANT SEASONS?

About 102 units per acre: 1,043 planned units across 10.19 acres (41,252 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗