Ashok Trade Centre

UPRERARegistered

Ashok Trade Centre is a RERA-registered commercial project by Ashok Infraproperties Private Limited in Jhansi (RERA ID UPRERAPRJ984790). Registered with a completion deadline of 29 Dec 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ984790
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryJhansi Development Authority
Proposed start1 Apr 2019
Project duration57 months
AddressJhansi, Jhansi
TehsilJhansi
Applicant typeCompany
Applicant address143, first floor, tribhuvan complex, ishwar nagar Mathura Road , New Delhi-110065
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    040400318

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 Mar 2019
Original completion30 Jun 2023
Revised completion29 Dec 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹33,000
Sanctioning authorityJhansi Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors51 · 1 · 8 (units from plan)
Homes · commercial units14 · 37 (shops and offices filed in the same plan)
  • SHOP37 73%
  • OTHER14 27%
ConfigurationUnitsCarpet area
OTHER1421-376
SHOP3713-39
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
- · OTHER, SHOP85113-39
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 144.9 m² for a SHOP, 174.8 m² for a SHOP, 182 m² for a SHOP, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Anupam Nayak
License CA/99/24976
7, Railway Road, Bhagirthi Kunj, Ganeshpur, Roorkee, Haridwar, Uttarakhand- 247667
Engineer
Shashikant Aterkar
146, Solani puram, Roorkee, Haridwar, Uttarakhand- 247667
Contractor
Ashok Infraproperties Private Limited
143, First Floor, Tribhuvan Complex Ishwar Nagar, Mathura Road New Delhi 110065
Sr.Development work declared to RERA
1Demarcation of Plots
N.A.
2Boundary Wall
8" High R.C.C. and Brick wall
3Road Work
R.C.C. Road (TRIMMEX)
4Footpaths
Interlocking Pavers
5Water Supply Including Drinking Water Facilities
2 tanks of 2500 litres with R.O. system
6Sewer System
Soak Pit and Septic Tank
7Drain
450X600 Brick work
8Parks
137.50 Sq. mtr.
9Tree Planting
20 Trees out of which 10 are evergreen trees
10Design For Electric Supply Including Street Lighting
D.G. Set (Back-up) 62.5 KVA and Government Electricity Supply
11Community Buildings
N.A.
12Treatment and Disposal System of Sewage and Sullage water
S.T.P. (15 KLD)
13Solid Waste Management And Disposal System
Collection system has been proposed to be developed in the building
14Water Conservation System
Rain Water Harvesting
15Energy Management System Including Use of Renewable Energy
Solar Panel at terrace
16Fire Protection And Fire Safety System
As per NBC Norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Proper provision for social infra and public amenities provided
18Emergency Evacuation Services
Marked in Plan
19Other Miscellaneous Work
Misc. work
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 27 Aug 2023.

Sanctioned by Jhansi Development Authority · 2,229 sqm of land · an approved plan of 1 block and 51 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
04040031828 Aug 201827 Aug 202327 Aug 202630 Jun 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Dec 2023.

#Granted fromExtended uptoNote
130 Jun 202329 Dec 2023Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
99/42323.42Plot
107189.10Plot
107560.87Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 228
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3746
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4271
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New4 Mar 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New23 Feb 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New4 Mar 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New23 Feb 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New4 Mar 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New4 Mar 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New4 Mar 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New4 Mar 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New23 Feb 2019 ↗

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2020-Q2 to 2023-Q3.

QuarterConstructionCertificates
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAshok Infraproperties Private Limited
RolePromoter · current
RERA IDUPRERAPRM12182
PANAAKCA2686F
CIN / TANU70200DL2012PTC230823
Name of chairmanRajesh Yadav
Registered address143, first floor, tribhuvan complex, ishwar nagar Mathura Road , New Delhi-110065
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Jhansi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ASHOK INFRAPROPERTIES PRIVATE LIMITEDBankPUNJAB NATIONAL BANKBranchMLB MEDICAL COLLEGE JHANSIA/C no.IFSCPUNB0460200
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Ashok Trade Centre

Is Ashok Trade Centre RERA registered?

Yes. Ashok Trade Centre is registered with UPRERA under registration number UPRERAPRJ984790, registered on 26 Mar 2019. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Ashok Trade Centre?

The completion date filed with UPRERA is 29 Dec 2023. No completion certificate is on record yet.

Who is the builder of Ashok Trade Centre?

Ashok Infraproperties Private Limited is the promoter entity that filed Ashok Trade Centre with UPRERA (promoter RERA ID UPRERAPRM12182). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Ashok Trade Centre more time to complete?

UPRERA's record carries 1 completion extension for Ashok Trade Centre, the latest running to 29 Dec 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Ashok Trade Centre have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Ashok Trade Centre located?

Ashok Trade Centre is registered in Jhansi, as filed with UPRERA.

What configurations are available in Ashok Trade Centre?

The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Ashok Trade Centre?

The approved unit plan filed with UPRERA runs from 13 to 376 m² of carpet area (about 141 to 4,050 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Ashok Trade Centre?

The approved unit plan describes 1 block and 51 units of which 14 are homes and 37 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Ashok Trade Centre?

About 93 units per acre: 51 planned units across 0.55 acres (2,229 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗