ATTALIKA PALMS is a RERA-registered residential project by ATTALIKA REAL ESTATE PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ353380). RERA status: Completed on 9 Dec 2022.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ353380 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 5 Oct 2019 |
| Project duration | 54 months |
| Address | Mohanlalganj, Lucknow |
| Tehsil | Mohanlalganj |
| Applicant type | Company |
| Applicant address | 248 Tej Kumar Plaza, 1 Trilokinath Road, Lucknow 226001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
MAP20180927134413700
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 17 Oct 2019 |
| Original completion | 15 Mar 2024 |
| Revised completion | 14 Sept 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 9 Dec 2022 |
| Registration fee | ₹1,99,500 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The plots shall be demarcated by RCC Marking Pillars |
| 2 | Boundary Wall Boundary Wall 5 ft high |
| 3 | Road Work RCC and bitumen roads |
| 4 | Footpaths The footpaths shall be paved with RCC blocks/Brick with grass planted between them. |
| 5 | Water Supply Including Drinking Water Facilities The Water Supply including Drinking Water Facility shall be provided from Overhead Tank. |
| 6 | Sewer System The Sewer System shall be constructed as per approved map. |
| 7 | Drain The K C Drains shall be provided as per approved map. |
| 8 | Parks The Park shall be developed and landscaped as per approved map passed by the Authority. |
| 9 | Tree Planting The trees shall be planted as per norms and bye-laws and as approved by the competent authority. |
| 10 | Design For Electric Supply Including Street Lighting Design for Electric Supply shall be done as per specifications of U.P. electricity board. The street lighting shall be provided as per approved map. |
| 11 | Community Buildings not applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water sewage treatment plant shall be constructed as per norms of UP Pollution Control Board and shall be constructed in the area as mentioned in the approved map. |
| 13 | Solid Waste Management And Disposal System Trash Bins and Collection Points shall be constructed as per approved plan. |
| 14 | Water Conservation System Rain Water Harvesting System shall be given at various locations to channel excess rainfall and recharge the ground water level. |
| 15 | Energy Management System Including Use of Renewable Energy not applicable |
| 16 | Fire Protection And Fire Safety System not applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services not applicable |
| 18 | Emergency Evacuation Services not applicable |
| 19 | Other Miscellaneous Work not applicable |
Registered agents
3 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | DEEPIKA SHUKLA | UPRERAAGT17304 |
| 2 | Maneesh Kumar Rai | UPRERAAGT18284 |
| 3 | Rahul Kumar Singh | UPRERAAGT20108 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 15 Mar 2024. 1 of them carries a revalidation, valid to 15 Mar 2024.
Sanctioned by Lucknow Development Authority · 38,837 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| MAP 20180927134413700 | 20 Sept 2019 | 15 Mar 2024 | 15 Mar 2027 | 15 Mar 2024 | — | |
| MAP20180927134413700 | 20 Sept 2019 | 15 Mar 2024 | 14 Sept 2024 | 15 Mar 2024 | 20 Sept 2019 valid to 15 Mar 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 14 Sept 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 15 Mar 2024 | 14 Sept 2024 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
45 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 847 | 3370 | Khasra |
| 863 | 1620 | Khasra |
| 885 | 4660 | Khasra |
| 886 | 2590 | Khasra |
| 887 part 1 | 7958 | Khasra |
| 887 part 2 | 195.167 | Khasra |
| 887 part 3 | 760 | Khasra |
| 889 | 1850 | Khasra |
| 890 | 1900 | Khasra |
| 896 | 1890 | Khasra |
| 897 | 10720 | Khasra |
| 898 Part | 780 | Khasra |
| 855 | 786.60 | Khasra |
| 898 Part & 899 | 2310 | Khasra |
| Sale deed · 10300 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 13147 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 21534 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8463 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11984 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 14272 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 14751 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15392 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17627 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5240 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1639/09 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3123 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7974 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10439 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10439 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 12 Oct 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 22 Sept 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 22 Sept 2019 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 22 Sept 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 1 Oct 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 1 Oct 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 1 Oct 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 1 Oct 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 23 Sept 2019 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 1 Oct 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 1 Oct 2019 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ATTALIKA REAL ESTATE PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM82483 |
| PAN | AADCA3774D |
| CIN / TAN | U45201UP1998PTC023996 |
| Name of chairman | Ambrish Agarwal |
| Registered address | 248 Tej Kumar Plaza, 1 Trilokinath Road, Lucknow 226001 |
| RERA contact | |
| Registered since | 2019 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | AREPL - Attalika Palms RERA AccountBankHDFC BankBranchPranay Towers BranchA/C no.IFSCHDFC0000594 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about ATTALIKA PALMS
Is ATTALIKA PALMS RERA registered?
Yes. ATTALIKA PALMS is registered with UPRERA under registration number UPRERAPRJ353380, registered on 17 Oct 2019. Estanzo reproduces that filing; it does not verify the work behind it.
Has ATTALIKA PALMS been completed?
UPRERA lists ATTALIKA PALMS as completed, with a completion certificate dated 9 Dec 2022, against a filed deadline of 14 Sept 2024.
Who is the builder of ATTALIKA PALMS?
ATTALIKA REAL ESTATE PRIVATE LIMITED is the promoter entity that filed ATTALIKA PALMS with UPRERA (promoter RERA ID UPRERAPRM82483). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted ATTALIKA PALMS more time to complete?
UPRERA's record carries 1 completion extension for ATTALIKA PALMS, the latest running to 14 Sept 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does ATTALIKA PALMS have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ATTALIKA PALMS located?
ATTALIKA PALMS is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗