Belvedere Court Phase-1 (GH-4) Integrated Township is a RERA-registered residential project by M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) in Lucknow (RERA ID UPRERAPRJ12850). RERA status: Completed on 16 Mar 2022.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ12850 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 21 Sept 2017 |
| Project duration | 49 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | 11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
42162
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 15 Sept 2017 |
| Original completion | 31 Mar 2021 |
| Revised completion | 30 Sept 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 16 Mar 2022 |
| Registration fee | ₹51,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 4 BHK52 46%
- 3 BHK52 46%
- 1 BHK4 4%
- 2 BHK4 4%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 52 | 178-195 |
| 3 BHK | 52 | 131-143 |
| 1 BHK | 4 | 75-99 |
| 2 BHK | 4 | 95 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| TOWER-1/TOWER-B · 4 BHK, OTHER, 3 BHK, 1 BHK, 2 BHK | 15 | 28 | 75-179 |
| TOWER-2/TOWER-B · 4 BHK, OTHER, 3 BHK, 1 BHK, 2 BHK | 15 | 28 | 75-178 |
| Tower-3/Tower-A · OTHER, 4 BHK, 3 BHK, 1 BHK, 2 BHK | 15 | 28 | 95-195 |
| Tower-4/Tower-A · 4 BHK, 3 BHK, 1 BHK, 2 BHK, OTHER | 15 | 28 | 95-195 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Available |
| 2 | Boundary Wall Available |
| 3 | Road Work Available |
| 4 | Footpaths Available |
| 5 | Water Supply Including Drinking Water Facilities Available |
| 6 | Sewer System Available |
| 7 | Drain Available |
| 8 | Parks Available |
| 9 | Tree Planting Available |
| 10 | Design For Electric Supply Including Street Lighting Available |
| 11 | Community Buildings Available |
| 12 | Treatment and Disposal System of Sewage and Sullage water Available |
| 13 | Solid Waste Management And Disposal System Available |
| 14 | Water Conservation System Available |
| 15 | Energy Management System Including Use of Renewable Energy Available |
| 16 | Fire Protection And Fire Safety System Available |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Available |
| 18 | Emergency Evacuation Services Available |
| 19 | Other Miscellaneous Work Available |
Registered agents
26 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | Abhishek Kumar | UPRERAAGT17780 |
| 3 | ANIL KUMAR VERMA | UPRERAAGT14346 |
| 4 | ARVIND KUMAR | UPRERAAGT15927 |
| 5 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 6 | BAJRANG MISHRA C/O BASE INFRA SOLUTION | UPRERAAGT13635 |
| 7 | BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITED | UPRERAAGT14759 |
| 8 | CHANDRA PRAKASH SAXENA | UPRERAAGT11046 |
| 9 | CITYMAX PROPMART PRIVATE LIMITED | UPRERAAGT13792 |
| 10 | Karshni Buildwell Pvt Ltd | UPRERAAGT11401 |
| 11 | MOHAMMAD RASHID | UPRERAAGT15251 |
| 12 | Mukesh kumar Sharma | UPRERAAGT11494 |
| 13 | RAM KUMAR YADAV | UPRERAAGT13784 |
| 14 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 15 | Rohit Chandani | UPRERAAGT11546 |
| 16 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 17 | Saurabh Gupta | UPRERAAGT14655 |
| 18 | Shashank Shukla | UPRERAAGT17091 |
| 19 | SHINU GUPTA | UPRERAAGT18762 |
| 20 | SINAN REALTY LLP | UPRERAAGT11785 |
| 21 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 22 | STRAIGHTEDGE REAL ESTATE PRIVATE LIMITED | UPRERAAGT10067 |
| 23 | VINAY KUMAR SINGH | UPRERAAGT11226 |
| 24 | VISHESH SRIVASTAVA | UPRERAAGT11416 |
| 25 | VIVEK ARORA | UPRERAAGT15945 |
| 26 | VIVEK VERMA | UPRERAAGT18719 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 20 Jul 2022.
Sanctioned by Lucknow Development Authority · 9,140 sqm of land · an approved plan of 4 blocks and 112 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 42162 | 1 Sept 2017 | 20 Jul 2022 | 20 Jul 2025 | 31 Mar 2021 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Sept 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Mar 2021 | 30 Sept 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 347 Part, 361 Part, 395 Part, 436 Ka | 9140 Smtr. | — |
| 347 Part, 361 Part, 395 Part, 436 Ka | 9140 | Khasra |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 9 Apr 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 5396 | 18 Apr 2015 | self | — |
| 4798 | 9 Apr 2015 | self | — |
| Sale deed · 4798 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5396 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 26 Jun 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 13 Jun 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 26 Jun 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Jun 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Jun 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 4 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 13 Jun 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 13 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 15 Sept 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 15 Sept 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 25 Oct 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | The portable water supply of desired quality & purity shall be ensured by tapping underground water as per approval from authorities. |
| Fire safety (as filed with RERA) | All rules & regulations of NBC is being followed |
| Health service | Available |
| Renewable energy | Provision for Solar Lights is being provided. |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
6 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
6 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) |
| Role | Promoter · current |
| RERA ID | UPRERAPRM10813 |
| PAN | AAFCA9848N |
| CIN / TAN | U70109DL2006PTC389838 |
| Name of chairman | Mr. Anwar Rizvi |
| Registered address | 11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Shalimar Lakecity Pvt. Ltd.BankHDFC BankBranchVibhuti KhandA/C no.IFSCHDFC0004805 |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 33 (Under Registration - 1 ) → 33 (Under Registration - 0 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 32 (Under Registration - 0 ) → 33 (Under Registration - 1 ) changed in Estanzo’s record | 11 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record |
Common questions about Belvedere Court Phase-1 (GH-4) Integrated Township
Is Belvedere Court Phase-1 (GH-4) Integrated Township RERA registered?
Yes. Belvedere Court Phase-1 (GH-4) Integrated Township is registered with UPRERA under registration number UPRERAPRJ12850, registered on 15 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Belvedere Court Phase-1 (GH-4) Integrated Township been completed?
UPRERA lists Belvedere Court Phase-1 (GH-4) Integrated Township as completed, with a completion certificate dated 16 Mar 2022, against a filed deadline of 30 Sept 2021.
Who is the builder of Belvedere Court Phase-1 (GH-4) Integrated Township?
M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) is the promoter entity that filed Belvedere Court Phase-1 (GH-4) Integrated Township with UPRERA (promoter RERA ID UPRERAPRM10813). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Belvedere Court Phase-1 (GH-4) Integrated Township more time to complete?
UPRERA's record carries 1 completion extension for Belvedere Court Phase-1 (GH-4) Integrated Township, the latest running to 30 Sept 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Belvedere Court Phase-1 (GH-4) Integrated Township have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Belvedere Court Phase-1 (GH-4) Integrated Township located?
Belvedere Court Phase-1 (GH-4) Integrated Township is registered in Lucknow, as filed with UPRERA.
What configurations are available in Belvedere Court Phase-1 (GH-4) Integrated Township?
The unit plan filed with UPRERA lists 4 BHK, 3 BHK, 1 BHK, 2 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Belvedere Court Phase-1 (GH-4) Integrated Township?
The approved unit plan filed with UPRERA runs from 75 to 195 m² of carpet area (about 808 to 2,099 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Belvedere Court Phase-1 (GH-4) Integrated Township?
The approved unit plan describes 4 blocks and 112 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Belvedere Court Phase-1 (GH-4) Integrated Township?
About 50 units per acre: 112 planned units across 2.26 acres (9,140 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗