Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ12850
Project categoryResidential
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start21 Sept 2017
Project duration49 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    42162

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. Completion certificate filed

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered15 Sept 2017
Original completion31 Mar 2021
Revised completion30 Sept 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary16 Mar 2022
Registration fee₹51,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors112 · 4 · 15 (units from plan)
  • 4 BHK52 46%
  • 3 BHK52 46%
  • 1 BHK4 4%
  • 2 BHK4 4%
ConfigurationUnitsCarpet area
4 BHK52178-195
3 BHK52131-143
1 BHK475-99
2 BHK495
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER-1/TOWER-B · 4 BHK, OTHER, 3 BHK, 1 BHK, 2 BHK152875-179
TOWER-2/TOWER-B · 4 BHK, OTHER, 3 BHK, 1 BHK, 2 BHK152875-178
Tower-3/Tower-A · OTHER, 4 BHK, 3 BHK, 1 BHK, 2 BHK152895-195
Tower-4/Tower-A · 4 BHK, 3 BHK, 1 BHK, 2 BHK, OTHER152895-195
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SIKKA ASSOSIATES
License 93/16497
A-2/1, Africa Avenue, SafdarGunj enclave, New Delhi
Engineer
SAA Associates
CE-CON- Engg HS-25 Second floor (Level 3) Kailash Colony Market New Delhi-110048
Contractor
A. Construction
2nd Floor Leela Mansion, 6A Naval Kishor Road, Hazratganj Lucknow-226001
Sr.Development work declared to RERA
1Demarcation of Plots
Available
2Boundary Wall
Available
3Road Work
Available
4Footpaths
Available
5Water Supply Including Drinking Water Facilities
Available
6Sewer System
Available
7Drain
Available
8Parks
Available
9Tree Planting
Available
10Design For Electric Supply Including Street Lighting
Available
11Community Buildings
Available
12Treatment and Disposal System of Sewage and Sullage water
Available
13Solid Waste Management And Disposal System
Available
14Water Conservation System
Available
15Energy Management System Including Use of Renewable Energy
Available
16Fire Protection And Fire Safety System
Available
17Social Infrastructure And Other Public Amenities Including Public Health Services
Available
18Emergency Evacuation Services
Available
19Other Miscellaneous Work
Available
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

26 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2Abhishek KumarUPRERAAGT17780
3ANIL KUMAR VERMAUPRERAAGT14346
4ARVIND KUMARUPRERAAGT15927
5ASA FINCAP ADVISORS LLPUPRERAAGT10926
6BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
7BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITEDUPRERAAGT14759
8CHANDRA PRAKASH SAXENAUPRERAAGT11046
9CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
10Karshni Buildwell Pvt LtdUPRERAAGT11401
11MOHAMMAD RASHIDUPRERAAGT15251
12Mukesh kumar SharmaUPRERAAGT11494
13RAM KUMAR YADAVUPRERAAGT13784
14REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
15Rohit ChandaniUPRERAAGT11546
16SANJEEV KUMAR BANKAUPRERAAGT10894
17Saurabh GuptaUPRERAAGT14655
18Shashank ShuklaUPRERAAGT17091
19SHINU GUPTAUPRERAAGT18762
20SINAN REALTY LLPUPRERAAGT11785
21SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
22STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
23VINAY KUMAR SINGHUPRERAAGT11226
24VISHESH SRIVASTAVAUPRERAAGT11416
25VIVEK ARORAUPRERAAGT15945
26VIVEK VERMAUPRERAAGT18719
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 20 Jul 2022.

Sanctioned by Lucknow Development Authority · 9,140 sqm of land · an approved plan of 4 blocks and 112 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
421621 Sept 201720 Jul 202220 Jul 202531 Mar 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Sept 2021.

#Granted fromExtended uptoNote
131 Mar 202130 Sept 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
347 Part, 361 Part, 395 Part, 436 Ka9140 Smtr.—
347 Part, 361 Part, 395 Part, 436 Ka9140Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 9 Apr 2015.

Registry no.DateTypeArea
539618 Apr 2015self—
47989 Apr 2015self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 4798
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5396
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New26 Jun 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New13 Jun 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New26 Jun 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New4 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Jun 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Jun 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New4 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New13 Jun 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New13 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old15 Sept 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Sept 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old25 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterThe portable water supply of desired quality & purity shall be ensured by tapping underground water as per approval from authorities.
Fire safety (as filed with RERA)All rules & regulations of NBC is being followed
Health serviceAvailable
Renewable energyProvision for Solar Lights is being provided.

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

6 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

6 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
RolePromoter · current
RERA IDUPRERAPRM10813
PANAAFCA9848N
CIN / TANU70109DL2006PTC389838
Name of chairmanMr. Anwar Rizvi
Registered address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Shalimar Lakecity Pvt. Ltd.BankHDFC BankBranchVibhuti KhandA/C no.IFSCHDFC0004805
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)33 (Under Registration - 1 ) → 33 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)32 (Under Registration - 0 ) → 33 (Under Registration - 1 )
changed in Estanzo’s record
11 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Belvedere Court Phase-1 (GH-4) Integrated Township

Is Belvedere Court Phase-1 (GH-4) Integrated Township RERA registered?

Yes. Belvedere Court Phase-1 (GH-4) Integrated Township is registered with UPRERA under registration number UPRERAPRJ12850, registered on 15 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Belvedere Court Phase-1 (GH-4) Integrated Township been completed?

UPRERA lists Belvedere Court Phase-1 (GH-4) Integrated Township as completed, with a completion certificate dated 16 Mar 2022, against a filed deadline of 30 Sept 2021.

Who is the builder of Belvedere Court Phase-1 (GH-4) Integrated Township?

M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) is the promoter entity that filed Belvedere Court Phase-1 (GH-4) Integrated Township with UPRERA (promoter RERA ID UPRERAPRM10813). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Belvedere Court Phase-1 (GH-4) Integrated Township more time to complete?

UPRERA's record carries 1 completion extension for Belvedere Court Phase-1 (GH-4) Integrated Township, the latest running to 30 Sept 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Belvedere Court Phase-1 (GH-4) Integrated Township have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Belvedere Court Phase-1 (GH-4) Integrated Township located?

Belvedere Court Phase-1 (GH-4) Integrated Township is registered in Lucknow, as filed with UPRERA.

What configurations are available in Belvedere Court Phase-1 (GH-4) Integrated Township?

The unit plan filed with UPRERA lists 4 BHK, 3 BHK, 1 BHK, 2 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Belvedere Court Phase-1 (GH-4) Integrated Township?

The approved unit plan filed with UPRERA runs from 75 to 195 m² of carpet area (about 808 to 2,099 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Belvedere Court Phase-1 (GH-4) Integrated Township?

The approved unit plan describes 4 blocks and 112 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Belvedere Court Phase-1 (GH-4) Integrated Township?

About 50 units per acre: 112 planned units across 2.26 acres (9,140 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗