Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
16.76%Q3'25
19.38%Q4'25
21.88%Q1'26
27.49%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ705722
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start15 Jan 2024
Project duration60 months
Address325 Part, 326 Part, 328 Part, 348 Part, 349 Part, 350 Part, 351 Part, 352 Part, 353 Part, 354 Part, 355 Part, Village Baghamau, Baghamau, Lucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/08385/LDA/BP/22-23/4013/05062023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Jan 2024
Original completion31 Dec 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹86,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors135 · 2 · 37 (units from plan)
  • 4 BHK131 97%
  • OTHER2 1%
  • PENTHOUSE2 1%
ConfigurationUnitsCarpet area
4 BHK131283
OTHER2424
PENTHOUSE2341
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower-1 · 4 BHK, OTHER, PENTHOUSE3465283-424
Tower-2 · 4 BHK, OTHER, PENTHOUSE3770283-424
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Rudraksha Charan
License CA/2011/53000
D-102 Chhatarpur, New Delhi-110074
Engineer
Mr. Pankish Goel
B-74, Sector-57, Noida-201301
Contractor
Mr. Satinder Sawhney
129-C, Gobind Nagar, Race Course, Dehradun-248001
Sr.Development work declared to RERA
1Demarcation of Plots
As per approved sanction plan.This is single plot Polygon shaped , having total 1 no. of entry gate and 1no. of exit gate from the 24 mtr wide front road and 24 mtr internal road. Site is surronded by 45 mtr road along with green from North & East Sides and from West side with developers plot.
2Boundary Wall
1.8 - 2.1m high and 200 mm thick Boundary wall designed or with MS Railing as per approved design. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates may of of MS Steel steel structure as per approved design are developed with boundary.
3Road Work
Trimix / asphalt road will be used as per deisgn suggested by the Architect for internal road.
4Footpaths
All internal roads will have narrow footpath with tiles pavers or equivalent finishes as per landscape design.
5Water Supply Including Drinking Water Facilities
All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Ground water may also be used and user can have their individual RO system as per their requirement.The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.
6Sewer System
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement. after treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
7Drain
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
8Parks
There is a significant green area beside building including green parks, play areas for childrens and different recretional activities.
9Tree Planting
The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view.
10Design For Electric Supply Including Street Lighting
We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,Pump room etc.
11Community Buildings
Fully centralised AC Club House/community center is proposed in the towers, swimming pool and some temporary kiosks on the central atrium with sitting area of each building. Club comprises multiple facility indoor playing areas etc.
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
13Solid Waste Management And Disposal System
Project shall have  waste segregation area. The solid waste shall be encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas and other waste shall be handed over to the government vendors for further disposal.
14Water Conservation System
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of  recharge pits
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex. Also timer control panels shall be used for efficient energy management.
16Fire Protection And Fire Safety System
All Fire norms shall be followed as per NBC code and approval of fire department. fire sprinklers,smoke detectors,FHC with pumps are provided as per norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
The Social infrastructure shall be provided with domestic water supply with tanks,STP treted water for flushing with tanks and irrigation ,storm /rain water drainage system,sewer drainage system,waste water drainage system,firefighting system including sprinklers ,FHC detectors ,fire water tank ,authority main power supply ,DG power backup for essential common supply,lifts.
18Emergency Evacuation Services
Fire Staricase is provided in the each building, with fire resistant doors, basements have 1 (one) access and exit in case of emergency. Dedicated assembly areas are also defined in the campus.Adequate signage is also provided.
19Other Miscellaneous Work
Not applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

30 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
29BUY9 CONSULTANTS LLPUPRERAAGT21783
3ANAROCK Property Consultants Private LimitedUPRERAAGT10265
4Anoop ShuklaUPRERAAGT20695
5Asit Gupta C/O Dwelling HomesUPRERAAGT20902
6CITY1ONE REALTORS PRIVATE LIMITEDUPRERAAGT24285
7Faizan AhmadUPRERAAGT22810
8GOLDEN ESTATEUPRERAAGT10397
9Housenotch Private LimitedUPRERAAGT22132
10Karshni Buildwell Pvt LtdUPRERAAGT11401
11MOHAMMAD RASHIDUPRERAAGT15251
12Mohan yadavUPRERAAGT17933
13MOHSIN KHANUPRERAAGT22544
14Mukesh kumar SharmaUPRERAAGT11494
15Pulkit SethiUPRERAAGT25269
16Rahul GuptaUPRERAAGT22028
17RAMJI SINGHUPRERAAGT23922
18REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
19Rohit ChandaniUPRERAAGT11546
20Rohit SinghUPRERAAGT19128
21SANJEEV KUMAR BANKAUPRERAAGT10894
22Santosh KumarUPRERAAGT13874
23SAURABH JOSHIUPRERAAGT24268
24Shailendra Kumar SinghUPRERAAGT19422
25Shashank ShuklaUPRERAAGT17091
26Smart InfraReality Private LimitedUPRERAAGT10057
27SUNIL SINGH CHAUHANUPRERAAGT23321
28SUSHILA DEVI SRIVASTAVAUPRERAAGT15738
29VINAY KUMAR SINGHUPRERAAGT11226
30Vivekanand ShuklaUPRERAAGT21638
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 31 Aug 2028.

Sanctioned by Lucknow Development Authority · 16,196 sqm of land · an approved plan of 2 blocks and 135 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/08385/LDA/BP/22-23/4013/050620231 Sept 202331 Aug 202831 Aug 203131 Dec 2028
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
325 Part, 326 Part, 328 Part, 348 Part, 349 Part, 350 Part, 351 Part, 352 Part, 353 Part, 354 Part, 355 Part34746Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4798
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5396
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 8785
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 7344
The registered deed by which the promoter bought the land.
PDF ↗
Lease deed · 9652
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Land Area Chart
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · AddressProof_Directors
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Affidavit
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Map and Revised Affidavit for Leasehold Land
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Affidavit
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New21 Nov 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New21 Nov 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New21 Nov 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New21 Nov 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 Nov 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Nov 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New21 Nov 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New21 Nov 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Dec 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New21 Nov 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New21 Nov 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Nov 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New21 Nov 2023 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New21 Nov 2023 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q1.

QuarterConstructionCertificates
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q216.76%CA ↗ · Arch ↗ · Eng ↗
2025-Q319.38%CA ↗ · Arch ↗ · Eng ↗
2025-Q421.88%CA ↗ · Arch ↗ · Eng ↗
2026-Q127.49%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
RolePromoter · current
RERA IDUPRERAPRM10813
PANAAFCA9848N
CIN / TANU70109DL2006PTC389838
Name of chairmanMr. Anwar Rizvi
Registered address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ANS DPL COL AC PINNACLE GH-13BankState Bank of IndiaBranchCommercial Branch LucknowBranch address6A, Way Road, Gokhle Marg, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166Branch emailsbi.04166@sbi.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ANS DPL SEP AC PINNACLE GH-13BankState Bank of IndiaBranchCommercial Branch, LucknowBranch address6A, Way Road, Gokhle Marg, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ANS DPL TRANSACTION AC PINNACLE GH-13BankState Bank of IndiaBranchCommercial Branch, LucknowBranch address6A, Way Road, Gokhle Marg, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)33 (Under Registration - 1 ) → 33 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)32 (Under Registration - 0 ) → 33 (Under Registration - 1 )
changed in Estanzo’s record
11 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Pinnacle GH-13

Is Pinnacle GH-13 RERA registered?

Yes. Pinnacle GH-13 is registered with UPRERA under registration number UPRERAPRJ705722, registered on 27 Jan 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Pinnacle GH-13?

The completion date filed with UPRERA is 31 Dec 2028. No completion certificate is on record yet.

Who is the builder of Pinnacle GH-13?

M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) is the promoter entity that filed Pinnacle GH-13 with UPRERA (promoter RERA ID UPRERAPRM10813). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Pinnacle GH-13 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Pinnacle GH-13 located?

Pinnacle GH-13 is registered in Baghamau, Lucknow, as filed with UPRERA.

What configurations are available in Pinnacle GH-13?

The unit plan filed with UPRERA lists 4 BHK, OTHER and PENTHOUSE. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Pinnacle GH-13?

The approved unit plan filed with UPRERA runs from 283 to 424 m² of carpet area (about 3,041 to 4,566 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Pinnacle GH-13?

The approved unit plan describes 2 blocks and 135 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Pinnacle GH-13?

About 34 units per acre: 135 planned units across 4.00 acres (16,196 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗