Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3425
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start9 Aug 2016
Original start18 Oct 2013
Project duration96 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address1st Floor Nikhilesh Palace, 17/4 Ashok Marg Lucknow 226 001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. 3 building permits sanctioned

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Jul 2017
Original completion8 Aug 2021
Revised completion7 Aug 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary3 Jul 2025
Registration fee₹2,18,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors735 · 4 · 19 (units from plan)
Homes · commercial units729 · 6 (shops and offices filed in the same plan)
  • 2 BHK413 56%
  • 3 BHK170 23%
  • 4 BHK72 10%
  • 1 BHK52 7%
  • OTHER15 2%
  • Other13 2%
ConfigurationUnitsCarpet area
4 BHK72116-154
2 BHK41365-99
3 BHK170112-127
1 BHK5244-55
STUDIO722-37
SHOP615-143
OTHER155-252
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 3 BHK, 2 BHK, 4 BHK, OTHER1515290-155
B · 2 BHK, 3 BHK1930490-127
C · 4 BHK, 2 BHK, 3 BHK, SHOP, OTHER191175-154
D · 2 BHK, 1 BHK, STUDIO, 3 BHK, SHOP, OTHER1816215-252
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
REPL
License CA/2005/36401
YMCA Complex, 13 Rana Pratap Marg, Lucknow
Engineer
Er Ashok Gupta
2/127, Vijay Khand, Gomti Nagar, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
CO-ORDINATES: 26.780377N,26.784279S,80.994416E,80.999081W
2Boundary Wall
FRONT WALL OF RCC COLUMNS AND GRILL , REAR BOUNDARY WALL OF RCC AND BRICK
3Road Work
BITUMINOUS ROAD
4Footpaths
PAVER BLOCKS/GREEN PAVERS/TREMIX AND TILES
5Water Supply Including Drinking Water Facilities
AVAILABLE
6Sewer System
CONNECTED
7Drain
CONNECTED
8Parks
UNDER DEVELOPMENT
9Tree Planting
PARTIALLY DONE
10Design For Electric Supply Including Street Lighting
HT LINE PROVIDED BY ANSAL API AND THEN WE ARE PROVIDING ELECTRICAL SUPPLY TO TOWERS THROUGH LT LINE AND RISING MAIN WITH ELECTRICITY PANELS
11Community Buildings
NO SEPARATE BUILDING. PROVISION FOR COMMUNITY FACILITIES UNDER CONSTRUCTION
12Treatment and Disposal System of Sewage and Sullage water
PROVIDED BY ANSAL TOWNSHIP
13Solid Waste Management And Disposal System
PROVIDED BY ANSAL TOWNSHIP
14Water Conservation System
RAIN WATER HARVESTING PROVIDED
15Energy Management System Including Use of Renewable Energy
40 KW SOLAR PANELS PROVIDED
16Fire Protection And Fire Safety System
UNDER INSTALLATION AS PER FIRE NORMS
17Social Infrastructure And Other Public Amenities Including Public Health Services
HEALTH CLUB, SWIMMING POOL, GAMES FACILITY, SKATING RINK, ETC ARE BEING PROVIDED. PHARMACY/LAB AND DOCTORS CHAMBERS PROVIDED
18Emergency Evacuation Services
PROVIDED AS PER FIRE NORMS
19Other Miscellaneous Work
DAYCARE FACILITY AND BANQUET, EATERY, WI-FI LOBBY WITH CAFE AND ESSENTIAL COMMODITIES SHOP PROVIDED
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 8 Aug 2021.

Sanctioned by Lucknow Development Authority · 42,684 sqm of land · an approved plan of 4 blocks and 735 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 7 Aug 2024.

#Granted fromExtended uptoNote
18 Aug 20217 Feb 2022Six months extension in view of force majeure caused by covid-19 pandemic
27 Feb 20227 Aug 2023—
37 Aug 20237 Aug 2024—

Land & documents

8 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
48P/46P/64P/429P13361.348—
429P/417P16817.5 sq mtr—
416P/417P7761.924 sq mtr—
416P/590P/591P/592P/594P4743.398 sq mtr—
48P/46P/64P/429P13361.348Khasra
429P/417P16817.5Khasra
416P/417P7761.924Khasra
416P/590P/591P/592P/594P4743.398Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

5 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 17 Apr 2013.

Registry no.DateTypeArea
264284 Dec 2014self—
701727 Mar 2014self—
701827 Mar 2014self—
20591417 Apr 2013other—
264284 Dec 2014self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 26428
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7017
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7018
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · BF205914
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterprovided
Fire safety (as filed with RERA)provided
Renewable energySolar Energy
Other facilitiessports and club

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameChandra Modern Builders (India) Pvt Ltd
RolePromoter · current
RERA IDUPRERAPRM799
PANAACCC8987F
CIN / TANU45201UP2005PTC029423
Name of chairmanashishalokchandra@gmail.com
Registered address1st Floor Nikhilesh Palace, 17/4 Ashok Marg Lucknow 226 001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
chandra modern builders india pvt ltdBankhdfc bank limitedBranchtekari chambersA/C no.IFSChdfc0001267
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Chandra Panorama

Is Chandra Panorama RERA registered?

Yes. Chandra Panorama is registered with UPRERA under registration number UPRERAPRJ3425, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Chandra Panorama been completed?

UPRERA still lists Chandra Panorama as Registered, so it is not shown as completed here. A completion certificate dated 3 Jul 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Chandra Panorama?

Chandra Modern Builders (India) Pvt Ltd is the promoter entity that filed Chandra Panorama with UPRERA (promoter RERA ID UPRERAPRM799). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Chandra Panorama more time to complete?

UPRERA's record carries 3 completion extensions for Chandra Panorama, the latest running to 7 Aug 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Chandra Panorama have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Chandra Panorama located?

Chandra Panorama is registered in Lucknow, as filed with UPRERA.

What configurations are available in Chandra Panorama?

The unit plan filed with UPRERA lists 4 BHK, 2 BHK, 3 BHK, 1 BHK, STUDIO, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Chandra Panorama?

The approved unit plan filed with UPRERA runs from 5 to 252 m² of carpet area (about 57 to 2,710 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Chandra Panorama?

The approved unit plan describes 4 blocks and 735 units of which 729 are homes and 6 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Chandra Panorama?

About 70 units per acre: 735 planned units across 10.55 acres (42,684 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗