CITIZEN RAM NIVAS

UPRERARegistered

CITIZEN RAM NIVAS is a RERA-registered residential project by CITIZEN INFRAVENTURES PVT LTD in CLIVE ROAD, MEHTA KNETRA CHKITSHALAY MARG, Prayagraj (RERA ID UPRERAPRJ859361). Registered with a completion deadline of 21 Mar 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
12.02%Q3'25
22.69%Q4'25
29.28%Q1'26
35.21%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ859361
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAllahabad Development Authority
Proposed start1 May 2024
Project duration59 months
AddressFREEHOLD PLOT NO 115A(22) CIVIL STATION, CLIVE ROAD, MEHTA KNETRA CHKITSHALAY MARG, Allahabad, Prayagraj
TehsilAllahabad
Applicant typeCompany
Applicant addressA/1 MG MARG, CIVIL LINES, ALLAHABAD-211001 Uttar Pradesh India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Affordable Housing/03031/PDA/BP/23-24/0598/10112023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered1 Aug 2024
Original completion21 Mar 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹36,500
Sanctioning authorityAllahabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors186 · 1 · 16 (units from plan)
  • 2 BHK103 55%
  • 3 BHK83 45%
ConfigurationUnitsCarpet area
2 BHK10369-75
3 BHK8389-90
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · OTHER, 2 BHK, 3 BHK1618669-90
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AR. VATRIKA SINGH
License CA/2011/51859
139, ALLENGANJ, PRAYAGRAJ-211002
Engineer
DR. SANTOSH KUMAR
7/121-B, SWAROOP NAGAR, KANPUR-208002
Contractor
ABHIYAAN BUILDCON PRIVATE LIMITED
14, IBRAHIMPUR, MAJRA KATKA, JHUNSI, PRAYAGRAJ-211019
Sr.Development work declared to RERA
1Demarcation of Plots
PLOT HAS BEEN BOUNDED WITH BOUNDARY WALL. DIMENSION OF PROPERTY NORTH TO SOUTH TOWARDS EAST = 202.6 FEET. NORTH TO SOUTH TOWARDS WEST= 197 FEET. EAST TO WEST TOWARDS NORTH= 339 FEET. EAST TO WEST TOWARDS SOUTH= 339 FEET.
2Boundary Wall
BOUNDARY WALL WILL BE MADE WITH COLUMN WITH PILING AND 9INCH BRICK WORK UPTO 6FT HEIGHT WITH COMPOUND LED LIGHT AND WHITE WASH
3Road Work
12 MTR. WIDE SETBACK ROAD WITH USE OF CONCRETE AND GREEN BELT APPROACH ROAD TO THE PROJECT PART OF MASTER PLAN ROAD
4Footpaths
PEDESTRIAN FOOTPATH (5 FT. WIDE) AND WALKING TRACK WILL BE CONSTRUCTED ALONG THE BUILDING SETBACK UPON COMPLETION OF CIVIL WORK.
5Water Supply Including Drinking Water Facilities
UNDERGROUND TANK (2 NOS. OF 25000 LITER. EACH) WILL BE USED TO SUPPLY WATER FROM BOREWELL TO OVERHEAD WATER TANK SUPPLEMENTED BY NAGAR NIGAM SUPPLY AS PER SERVICE PLAN OF PROJECT
6Sewer System
SEWER SYSTEM PLAN WILL BE PREPARED AS PER SERVICE PLAN OF THE PROJECT AND CONNECTED TO TRUNK NAGAR NIGAM SEWER LINE. DOWN SWR PIPES FROM RESIDENTIAL UNIT WILL BE OF 110MM WIDTH. WHILE UNDERGROUND SEVER LINES RANGING BETWEEN 150MM TO 200MM ALONG WITH 2X2 FT MANHOLE CHAMBER WILL BE PROVIDED
7Drain
PROPER DRAINAGE NETWORK WILL BE PROVIDED AS PER SERVICES PLAN BEING UPLOADED DOWN PVC PIPES FROM RESIDENTIAL UNIT WILL BE OF 110MM WIDTH
8Parks
GREEN AREA DEVELOPMENT OVER 700 SQ MTR WILL BE DONE UPON COMPLETION OF PROJECT. SUCH PARK AREA WILL BE DEVELOPED WITH TREE PLANTATION AND FLOWERING PLANTS AND EVERGREEN SHRUBS. THE PARK AREA WILL HAVE PARK BENCHES AND OUTDOOR LIGHTING. KIDS PLAY AREA WILL BE DEVELOPED WITH SWING AND PLAY PIT OVER 500 SQ .FT. AREA
9Tree Planting
35 NOS OF TREES WILL BE PLANTED INDIGENOUS SPECIES SUCH AS NEEM MANGO ASHOK ALONG WITH AVENUE TREES CHITWAN AMALTAS AND SHRUBS AND BUSHES AND HEDGES
10Design For Electric Supply Including Street Lighting
INFRASTRUCTURE WILL BE DEVELOPED AS PER PuVVNL PROJECT ELECTRICAL PLAN HAS BEEN ATTACHED IN UPLOAD DOCUMENT SECTION. 3 NOS. TRANSFORMERS (400KVA, 250KVA, 250KVA) WILL BE INSTALLED DEPENDING ON THE SANCTIONED LOAD FOR THE PROJECT. ARMOURED CABLE 240MM WILL BE USED TO SUPPLY FROM TRANSFORMER TO BUSBAR SUBSEQUENTLY 16MM AND 10MM CABLE WILL BE USED TO CONNECT ELECTRICAL METERS TO FLAT SUPPLY. STREETS LIGHT OF 200 WATT AND LED COMPOUND LIGHT OF 12 WATT WILL BE PROVIDED THROUGHOUT THE CAMPUS.
11Community Buildings
COMMUNITY AREA WILL BE DEVELOPED ON THE FIRST FLOOR OF THE BUILDING WITH SPACE FOR INDOOR GAME GYM AND LAP POOL. TOTAL AREA EARMARKED ON THE FIRST FLOOR FOR COMMUNITY AREA = 5000 SQ. FT.
12Treatment and Disposal System of Sewage and Sullage water
SEWAGE AND DRAINAGE SYSTEM WILL BE SETUP AS PER NORMS DEFINED BY PDA AND NAGAR NIGAM. DETAILED DRAWING OF SUCH INFRASTRUCTURE WILL BE PRESENTED ALONG WITH COMPLETION DRAWING.
13Solid Waste Management And Disposal System
BEING IN THE HEART OF THE CITY AND BARELY 2 KM FROM NAGAR NIGAM HEAD QUARTER SOLID WASTE MANAGEMENT AND DISPOSAL SYSTEM WILL BE MANAGED BY THE AUTHORITY ON PAYMENT OF REQUISITE FEE FROM USERS.
14Water Conservation System
RAIN WATER HARVESTING WILL BE PROVIDED AS PER THE APPROVED DRAWING OF THE PROJECT AND UPON COMPLETION OF THE PROJECT AS PER NORMS AND NOC WILL BE TAKEN FROM BHU JAL GARBH VIBHAG. RAIN WATER HARVESTING PIT WILL BE DEVELOPED AT TWO LOCATIONS WITHIN THE PREMISES WITH TOTAL CAPACITY = 36 CUBIC MTR. WHICH WILL SUFFICE FOR THE TERRACE AREA OF THE PROPOSED BUILDING.
15Energy Management System Including Use of Renewable Energy
CONVENTIONAL ENERGY MANAGEMENT AND EFFICIENT USE ALONG WITH USE OF RENEWABLE ENERGY WILL BE ENGAGED AT SUITABLE LOCATION WITH IN THE PROJECT. THE PROJECT IS ENVISIONED WITH OPTIMUM USE OF SOLAR POWER. (SOLAR PANEL OF 5 KW WITH SOLAR INVERTER WILL BE PROVIDED FOR COMMON AREA USAGE). COMMON AREA LIGHTING IN CORRIDOR WILL BE LED BASED. RAIN WATER HARVESTING EV CHARGING ALONG WITH DAY TIME LIGHTING USING MAXIMUM SUNLIGHT AMONG OTHER INITIATIVES.
16Fire Protection And Fire Safety System
THE PROJECT HAS BEEN GRANTED PROVISIONAL NOC BY THE FIRE DEPARTMENT, ALL CONDITION LAID DOWN IN THE ATTACHED NOC WILL BE ADHERED TO. AS APPLICABLE UNDER FIRE SAFETY NORMS FIRE EXTINGUISHER AND HOSE REEL ALONG WITH FIRE ALARM WILL BE PROVIDED. MS PIPE OF 150MM B-CLASS ALONG WITH 100MM, 32MM,25MM DIAMETER ALONG WITH BUTTERFLY VALVE 150MM AND 100MM WILL BE USED PRESSURE GAUGE AIR VALVE 25MM WILL BE PROVIDED. HOSE REEL SET 30 MTR AND HYDRANT VALVE 63MM SS. RRL HOSE 15MTR SS ALONG WITH HOSE BOX CABINET WILL BE PROVIDED. 3 NOS FIRE PUMP 360MM TERRACE PUMP ALONG WITH STARTER PANEL. FIRE ALARM SYSTEM WITH PA. FIRE EXTINGUISHER ABC TYPE 6 KG=50 NOS AND CO2 TYPE 4.5 KG= 25 NOS WILL BE USED. AUTOMATED WATER SPRINKLER PENDENT TYPE WILL BE USED IN BASEMENT.
17Social Infrastructure And Other Public Amenities Including Public Health Services
PROJECT IS LOCATED IN VICINITY OF CBD AND IN CLOSE PROXIMITY TO PUBLIC AND PRIVATE HOSPITAL, SCHOOLS, POLICE STATION AND OTHER SOCIAL AND PUBLIC AMENITIES AND EMERGENCY SERVICES.
18Emergency Evacuation Services
AS PER NORMS OF THE FIRE DEPARTMENT AND PROVISIONAL NOC PROVIDED BY THE FIRE DEPARTMENT DESIGNATED 2 NOS ASSEMBLY POINT (2000 SQ FT EACH) WILL BE DEVELOPED WITHIN THE PROJECT TO ENABLE EVACUATION IN CASE OF EMERGENCY.
19Other Miscellaneous Work
OTHER MISCELLANEOUS WORKS WILL BE CARRIED OUT AS PER INSTRUCTION FROM PROJECT ARCHITECT, MEP CONSULTANT, OTHER CONSULTANT AND DEVELOPMENT AUTHORITY.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 21 Mar 2029.

Sanctioned by Allahabad Development Authority · 6,113.54 sqm of land · an approved plan of 1 block and 186 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Affordable Housing/03031/PDA/BP/23-24/0598/1011202322 Mar 202421 Mar 202921 Mar 202921 Mar 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
115A6290.81Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 1/12885/277-376/2853
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1/6043/161-182/3136
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New18 May 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New1 May 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New1 May 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New1 May 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New1 May 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New1 May 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New1 May 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New1 May 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New1 May 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 May 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New1 May 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New1 May 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New3 Jul 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New1 May 2024 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q2.

QuarterConstructionCertificates
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q212.02%CA ↗ · Arch ↗ · Eng ↗
2025-Q322.69%CA ↗ · Arch ↗ · Eng ↗
2025-Q429.28%CA ↗ · Arch ↗ · Eng ↗
2026-Q135.21%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameCITIZEN INFRAVENTURES PVT LTD
RolePromoter · current
RERA IDUPRERAPRM9344
PANAAFCC8707J
CIN / TANALDCO1140G
Name of chairmanNISHITH VERMA
Registered addressA/1 MG MARG, CIVIL LINES, ALLAHABAD-211001 Uttar Pradesh India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameRAM SARAN VERMA
RoleCo-promoter
Applicant typeIndividual
Address22 CLIVE ROAD, HEERA VATIKA, CIVIL LINES, ALLAHABAD-211001
RERA contact

Nearby projects

Prayagraj

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
CITIZEN INFRAVENTURE-COLLECTION ACCOUNT FOR CITIZEN RAM NIVASBankINDIAN BANKBranchHINDI SAHITYA SAMMELAN BRANCHBranch address12 KP KAKKAR ROAD, PRAYAGRAJBranch districtPrayagrajA/C no.IFSCIDIB000A580Branch emaila580@indianbank.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
CITIZEN INFRAVENTURES-SEPARATE ACCOUNT FOR CITIZEN RAM NIVASBankINDIAN BANKBranchHINDI SAHITYA SAMMELAN BRANCHBranch address12, KP KAKKAR ROAD, PRAYAGRAJBranch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
CITIZEN INFRAVENTURES-TRANSACTION A/C FOR CITIZEN RAM NIVASBankINDIAN BANKBranchHINDI SAHITYA SAMMELAN BRANCHBranch address12 KP KAKKAR ROAD, PRAYAGRAJBranch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
21 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CITIZEN RAM NIVAS

Is CITIZEN RAM NIVAS RERA registered?

Yes. CITIZEN RAM NIVAS is registered with UPRERA under registration number UPRERAPRJ859361, registered on 1 Aug 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for CITIZEN RAM NIVAS?

The completion date filed with UPRERA is 21 Mar 2029. No completion certificate is on record yet.

Who is the builder of CITIZEN RAM NIVAS?

CITIZEN INFRAVENTURES PVT LTD is the promoter entity that filed CITIZEN RAM NIVAS with UPRERA (promoter RERA ID UPRERAPRM9344). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does CITIZEN RAM NIVAS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CITIZEN RAM NIVAS located?

CITIZEN RAM NIVAS is registered in CLIVE ROAD, MEHTA KNETRA CHKITSHALAY MARG, Prayagraj, as filed with UPRERA.

What configurations are available in CITIZEN RAM NIVAS?

The unit plan filed with UPRERA lists OTHER, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CITIZEN RAM NIVAS?

The approved unit plan filed with UPRERA runs from 69 to 90 m² of carpet area (about 740 to 967 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CITIZEN RAM NIVAS?

The approved unit plan describes 1 block and 186 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CITIZEN RAM NIVAS?

About 123 units per acre: 186 planned units across 1.51 acres (6,113.54 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗