Civitech Strings is a RERA-registered residential project by SA.G.Realtech Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ646272). Registered with a completion deadline of 10 Jul 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ646272 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Dec 2020 |
| Project duration | 80 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | 65 Shrestha Vihar Delhi-110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
PLG/(BP)/3207(S)/2019/5986
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Permit revalidated (2)
2 building permits sanctioned
- valid to
Permit revalidated
SM-19-Dec-2023
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 16 Jan 2021 |
| Original completion | 10 Jul 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹95,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK620 71%
- 2 BHK212 24%
- SHOP30 3%
- PENTHOUSE12 1%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 620 | 57-80 |
| PENTHOUSE | 12 | 60-68 |
| 2 BHK | 212 | 57-89 |
| SHOP | 30 | 7-23 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Tower A · OTHER, 3 BHK, PENTHOUSE | 27 | 204 | 60-60 |
| Tower B · OTHER, 3 BHK, 2 BHK | 28 | 216 | 57-80 |
| Tower C · OTHER, 3 BHK, 2 BHK, PENTHOUSE | 28 | 212 | 57-80 |
| Tower D · OTHER, 3 BHK, PENTHOUSE | 27 | 208 | 60-60 |
| Tower E · SHOP, 2 BHK | 2 | 34 | 7-89 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Project plot area is 18000 SQ.M. Plot will be demarcated by boundary walls made of RCC frameworks and brickwork. having height of 8 feet |
| 2 | Boundary Wall Boundary wall made of masonary pucca, RCC framework between other plots. Boundary wall made of masonary pucca RCC framework , Jaali with planters in front of commercial. |
| 3 | Road Work Internal Road on extended basement slab designed as per fire tender load finished with cement concrete Inter-locking tiles with kerb stone on sides for motorable vehicular movement and fire tender movement. |
| 4 | Footpaths Footpaths will be of Cement concrete/Stone/Grass Pavers/ interlocking tiles. shall be constructed in Order to allow in filtration of surface runoff of rainwater |
| 5 | Water Supply Including Drinking Water Facilities Project having dual source of Water supply. One from water supply available from authority sources and Second water to be collected in Under Ground and Terrace Tanks equipped with Hydro Pneumatic Pump. |
| 6 | Sewer System Sewer will be connected through sewer line from all WC and then into collection chamber for Sewerage treatment (STP) as EC conditions. |
| 7 | Drain surface rainwater will be collected via drain lines from balconies , roof top , open areas into rainwater harvesting pits to recharge the ground water level. |
| 8 | Parks Landscape with civil work of masonary and stone, horticulture work and various types of plantation landscape architect. |
| 9 | Tree Planting Trees planting along boundary of the plot as per sanctioned drawing from authority. |
| 10 | Design For Electric Supply Including Street Lighting street lighting will have dual source of power. One is solar power and another is Power supply from N.P.C.L. as per required/ sanctioned load for common area and facilities along with D.G. power back-up. |
| 11 | Community Buildings Community building having Banquet at ground floor with its ancillary areas, air conditioned Gym at first floor Indoor Game Facilities at ground floor. |
| 12 | Treatment and Disposal System of Sewage and Sullage water sewage waste and sullage water will be treated by S.T.P. of 345 KLD capacity . treated water will be used for plantation and rest will be released through Authority Sewerage System. |
| 13 | Solid Waste Management And Disposal System project use Organic Waste Converter to treat solid waste , Collection Bins and Segregation Table will be provided. |
| 14 | Water Conservation System usage of dual flush systems for flush cisterns. Rain Water Harvesting system, Drip Irrigation with sprinklers. |
| 15 | Energy Management System Including Use of Renewable Energy all street and park lighting will solar powered . 50 percent of the same will be provided with dual (solar/electrical ). |
| 16 | Fire Protection And Fire Safety System Basement Hydrant, Sprinklers, 2 Nos. of Electrical Pump of 2850 lpm, 2 Nos. of Diesel Pump of 2850 lpm, 2 Nos. of Jockey Pumps of 180 lpm, Water Curtain Pump of 2850 lpm. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Proper water supply and sanitary facilities in visitor toilets at ground floor of every tower. |
| 18 | Emergency Evacuation Services All towers have balconies and two staircases for emergency evacuation used for fire and life safety . |
| 19 | Other Miscellaneous Work Guard Room at main entry and exit gate, electrical room /electrical sub-station , entrance lobbies at ground floor in all towers. CCTV surveillance system at entry and exit point. |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | BULLMEN REALTY INDIA PRIVATE LIMITED | UPRERAAGT10138 |
Permits & extensions
4 permits
An approval and the date it runs to - not proof the work matching it was done.
4 sanctioning permits are on record with UPRERA, the latest valid to 10 Jul 2027. 3 of them carry a revalidation, the latest valid to 1 Jan 2030.
Sanctioned by Greater Noida Authority · 18,000 sqm of land · an approved plan of 5 blocks and 874 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| PLG/(BP)/3207(S)/2019/5986 | 13 Sept 2019 | 12 Sept 2024 | 12 Sept 2027 | 12 Sept 2027 | — | |
| — | 13 Sept 2024 | 10 Jul 2028 | 10 Jul 2027 | 10 Jul 2022 valid to 10 Jul 2027 as SM-24-Mar-2021:10493 | ||
| SM-24-Mar-2021 | 10 Jul 2022 | 10 Jul 2027 | 1 Jan 2031 | 10 Jul 2027 | 10 Jul 2022 valid to 1 Jan 2030 | |
| SM-24-Mar-2021 | 10 Jul 2022 | 10 Jul 2027 | 1 Jan 2031 | 10 Jul 2027 | 1 Jan 2025 valid to 1 Jan 2030 as SM-19-Dec-2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-02B Sector-12 Greater NOIDA | 18000 | Plot |
| Lease deed · 8778 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Allotment letter from the authority · PROP/BRS-05/2010/459 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Builders/BRS05-2010-2011/778 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Builders/BRS05-2010-11/778 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 12 Jan 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 12 Nov 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 4 Dec 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Dec 2020 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 7 Dec 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 12 Nov 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 12 Nov 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 12 Nov 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 12 Nov 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 4 Dec 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 8 Jan 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 5 Jan 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 8 Jan 2021 ↗ |
Quarterly progress reports
24 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
24 quarterly progress reports are on file with UPRERA, covering 2020-Q3 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 90% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 49% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 52% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 60% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SA.G.Realtech Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM127059 |
| PAN | AASCS3051N |
| CIN / TAN | U70109DL2012PTC245312 |
| Name of chairman | Subodh Goel |
| Registered address | 65 Shrestha Vihar Delhi-110092 |
| RERA contact | |
| Registered since | 2020 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SAG Realtech Private Limited collection Account for Civitech Strings (main A/C)BankHDFC BANKBranchSECTOR-62 NOIDABranch addressHDFC BANK C-25 , Stellar IT Park , SECTOR-62, NOIDA-201301, Gautambudh Nagar-UPBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002649Branch emailashish.malhotra(at)hdfc.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SAG Realtech Private Limited separate Account for Civitech StringsBankHDFC BANKBranchSector 62 NOIDABranch addressHDFC BANK C-25, Stellar IT park , Sector-62 NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002649Branch emailashish.malhotra(at)hdfcbank.com |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SAG Realtech Private Limited RERA transaction account for Civitech stringsBankHDFC BANKBranchSector-62 NODIABranch addressHDFC BANK, C-25, Stellar IT park, Sector-62, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002649Branch emailashish.malhotra(at)hdfcbank.com |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Civitech Strings
Is Civitech Strings RERA registered?
Yes. Civitech Strings is registered with UPRERA under registration number UPRERAPRJ646272, registered on 16 Jan 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Civitech Strings?
The completion date filed with UPRERA is 10 Jul 2027. No completion certificate is on record yet.
Who is the builder of Civitech Strings?
SA.G.Realtech Private Limited is the promoter entity that filed Civitech Strings with UPRERA (promoter RERA ID UPRERAPRM127059). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Civitech Strings have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Civitech Strings located?
Civitech Strings is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Civitech Strings?
The unit plan filed with UPRERA lists OTHER, 3 BHK, PENTHOUSE, 2 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Civitech Strings?
The approved unit plan filed with UPRERA runs from 7 to 89 m² of carpet area (about 74 to 957 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Civitech Strings?
The approved unit plan describes 5 blocks and 874 units of which 844 are homes and 30 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Civitech Strings?
About 196 units per acre: 874 planned units across 4.45 acres (18,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗