CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH.
CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Bahraich (RERA ID UPRERAPRJ17927). Registered with a completion deadline of 30 Jul 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ17927 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Jan 2019 |
| Project duration | 91 months |
| Address | Bahraich, Bahraich |
| Tehsil | Bahraich |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
APD/UNIT-6/BHINGA MARG
2 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 30 Oct 2018 |
| Original completion | 1 Jan 2022 |
| Revised completion | 30 Jul 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 3 Aug 2026 |
| Registration fee | ₹1,02,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 120 | 86 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Single Stories / 120 Nos.Houses · OTHER | 1 | 120 | 86 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Layout Plan |
| 2 | Boundary Wall As per Layout Plan |
| 3 | Road Work As per Layout Plan |
| 4 | Footpaths As per Layout Plan |
| 5 | Water Supply Including Drinking Water Facilities As per Layout Plan of Scheme |
| 6 | Sewer System As per Layout Plan of Scheme |
| 7 | Drain As per Layout Plan of Scheme |
| 8 | Parks As per Layout Plan of Scheme |
| 9 | Tree Planting As per Layout Plan of Scheme |
| 10 | Design For Electric Supply Including Street Lighting As per Layout Plan of Scheme |
| 11 | Community Buildings As per Layout Plan of Scheme |
| 12 | Treatment and Disposal System of Sewage and Sullage water As per Layout Plan of Scheme |
| 13 | Solid Waste Management And Disposal System After completion of scheme will be handed over to local Authority , Local Authority Make Provision for Solid Waste Disposal System |
| 14 | Water Conservation System As per Layout Plan of Scheme |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable |
| 16 | Fire Protection And Fire Safety System Not Applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per Layout Plan of Scheme |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work As per Layout Plan of Scheme |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 1 May 2023. 1 of them carries a revalidation, valid to 1 May 2026.
Sanctioned by U.P. Awas Evam Vikas Parishad · 1,782 sqm of land · an approved plan of 1 block and 120 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 1174/A.P.U.-6 | 2 May 2018 | 1 May 2023 | 30 Apr 2025 | 1 Jan 2022 | — | |
| APD/UNIT-6/BHINGA MARG | 2 May 2018 | 1 May 2023 | 20 Sept 2026 | 1 May 2023 | 2 May 2018 valid to 1 May 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
UPRERA’s record carries 4 completion extensions for this project, the latest running to 30 Jul 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 1 Jan 2022 | 30 Jun 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jun 2022 | 1 May 2023 | — |
| 3 | 1 May 2023 | 30 Jul 2025 | — |
| 4 | 30 Jul 2025 | 30 Jul 2026 | — |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 501,502,503,504,505,506,507,508,509,514,515,518,52 | 47560 | Khasra |
| Khatauni extract · 1420-1425 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1420-1425 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 30 Oct 2018 ↗ |
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 87% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 90% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | EXE. ENG.CD-IV U.P.AWAS EVAM VIKAS PARISHADBankBANK OF INDIABranchINDIRA NAGAR LUCKNOWA/C no.IFSCBKID0006852 |
What has changed on this record
15 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Actual completion | 2026-08-03 first recorded by Estanzo | 10 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH.
Is CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. RERA registered?
Yes. CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. is registered with UPRERA under registration number UPRERAPRJ17927, registered on 30 Oct 2018. Estanzo reproduces that filing; it does not verify the work behind it.
Has CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. been completed?
UPRERA still lists CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. as Registered, so it is not shown as completed here. A completion certificate dated 3 Aug 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH.?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. more time to complete?
UPRERA's record carries 4 completion extensions for CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH., the latest running to 30 Jul 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. located?
CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH. is registered in Bahraich, as filed with UPRERA.
What configurations are available in CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH.?
The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH.?
The approved unit plan describes 1 block and 120 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is CONSTRUCTION OF 11 NOS. S.F.S. SEMI FINISHED M.I.G. HOUSES IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA, BAHRAICH.?
About 273 units per acre: 120 planned units across 0.44 acres (1,782 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗