CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI

UPRERARegistered

CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Hardoi (RERA ID UPRERAPRJ968069). Registered with a completion deadline of 2 Sept 2022. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ968069
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Apr 2019
Project duration42 months
AddressHardoi, Hardoi
TehsilHardoi
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2302/AP-6

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered20 Feb 2019
Original completion31 Mar 2022
Revised completion2 Sept 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹15,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors96 · 2 · 4 (units from plan)
ConfigurationUnitsCarpet area
1 BHK9623
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · 1 BHK44823
2 · 1 BHK44823
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
PADAM MOHAN
License CA/87/11151
NEELGIRI COMPLEX, INDIRA NAGAR LUCKNOW
Engineer
DR. K. NARAYAN
IET SITAPUR ROAD LUCKNOW
Contractor
U P AWAS VIKAS PARISHAD
104 MAHATMA GANDHI MARG LUCKNOW
Sr.Development work declared to RERA
1Demarcation of Plots
Flat Constructed on Khasra No. 240(Mi) Village Tatyura, Bawan Road, Hardoi.
2Boundary Wall
Not Proposed at present
3Road Work
Internal Road will constructed by UPAVP and trunk road will constucted by UP PWD as per GO -1878/Aath-1-16-80/Miscellaneous/2010 date- 17.10.2018
4Footpaths
Not Proposed at present
5Water Supply Including Drinking Water Facilities
Intrnal Drinking water facility will be Provide by UPAVP and External Water Facility will be provide by UP JAL NIGAM, Hardoi as per GO -1878/Aath-1-16-80/Miscellaneous/2010 date- 17.10.2018
6Sewer System
Internal Sewer facility will beProvide by UPAVP and ExternalSever Facility will be provide by UP JAL NIGAM, Hardoi as per GO -1878/Aath-1-16-80/Miscellaneous/2010 date- 17.10.2018
7Drain
Internal Drain facility will beProvide by UPAVP and External Facility will be provide by UP JAL NIGAM, Hardoi as per GO -1878/Aath-1-16-80/Miscellaneous/2010 date- 17.10.2018
8Parks
Will be Constructed by UPAVP Hardoi.
9Tree Planting
Will be done by UPAVP Hardoi.
10Design For Electric Supply Including Street Lighting
Inter Electric Supply and Street Lighting will be Provide by UPAVP, External Electric Supply and stree Lighting will be provide by UPPCL Hardoi, as per GO -1878/Aath-1-16-80/Miscellan eous/2010 date- 17.10.2018
11Community Buildings
Community building like health center, Schools, Angabaries etc. Will be done by concerning Department as per GO -1878/Aath-1-16-80/Miscellaneous/2010 date- 17.10.2018
12Treatment and Disposal System of Sewage and Sullage water
Will be done by UP JAL NIGAM, Hardoi as per GO -1878/Aath-1-16-80/Miscellaneous/2010 date- 17.10.2018
13Solid Waste Management And Disposal System
Will be done by UP JAL NIGAM, Hardoi as per GO -1878/Aath-1-16-80/Miscellaneous/2010 date- 17.10.2018
14Water Conservation System
Not Applicable
15Energy Management System Including Use of Renewable Energy
WIll be done by UP Power Corporation Hardoi as per GO -1878/Aath-1-16-80/Miscellaneous/2010 date- 17.10.201
16Fire Protection And Fire Safety System
As per PMAY Narms/ Specified
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social infrastructure like health center, Schools, Anganbaries etc. Will be done by concerning Department as per GO -1878/Aath-1-16-80/Miscellaneous/2010 date- 17.10.2018
18Emergency Evacuation Services
Not Applicable
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 29 Aug 2023.

Sanctioned by U.P. Awas Evam Vikas Parishad · an approved plan of 2 blocks and 96 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2302/AP-630 Aug 201829 Aug 202328 Aug 20253 Mar 2022
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 2 Sept 2022.

#Granted fromExtended uptoNote
131 Mar 20222 Sept 2022—

Land & documents

22 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
24015000Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 3256/7-BHULEKH/BHU0PU0GRA0/2018
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New11 Feb 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New15 Jan 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New15 Jan 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New15 Jan 2019 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New15 Jan 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New11 Feb 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New11 Feb 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New11 Feb 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New11 Feb 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New11 Feb 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New11 Feb 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New11 Feb 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New11 Feb 2019 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PROJECT MANAGER CU HARDOIBankHDFC BANK LTD.BranchHARDOI UTTAR PRADESHA/C no.IFSCHDFC0000659
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI

Is CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI RERA registered?

Yes. CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI is registered with UPRERA under registration number UPRERAPRJ968069, registered on 20 Feb 2019. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI?

The completion date filed with UPRERA is 2 Sept 2022. No completion certificate is on record yet.

Who is the builder of CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI more time to complete?

UPRERA's record carries 1 completion extension for CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI, the latest running to 2 Sept 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI located?

CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI is registered in Hardoi, as filed with UPRERA.

What configurations are available in CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in CONSTRUCTION OF 96 NOS (G+3) HOUSES UNDER PMAY AT TATYURA DIST. HARDOI?

The approved unit plan describes 2 blocks and 96 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗