Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich

UPRERARegistered

Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Bahraich (RERA ID UPRERAPRJ17903). Registered with a completion deadline of 30 Jul 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
85%Q3'25
100%Q4'25
100%Q1'26
100%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ17903
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Jan 2019
Project duration91 months
AddressBahraich, Bahraich
TehsilBahraich
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    870/A.P.U-6

  2. valid to

    Permit revalidated

    APD/UNIT-6/BHINGA

  3. Building permit sanctioned

    APD/UNIT-6/BHINGA

  4. Registered with RERA

  5. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. to

    Extension granted

  9. to

    Extension granted

  10. to

    Extension granted

  11. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  12. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Oct 2018
Original completion1 Jan 2022
Revised completion30 Jul 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary3 Aug 2026
Registration fee₹63,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors190 · 1 · 1 (units from plan)
ConfigurationUnitsCarpet area
OTHER19033
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Single stories/190 houses · OTHER119033
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
JYOTI KATIYAR
License Unit-6
UNIT-6, NILGIRI COMPLEX, INDIRANAGAR, LUCKNOW
Engineer
PRASHANT VARDHAN
CD-4, UPAVP, NILGIRI COMPLEX, INDIRANAGAR, LUCKNOW
Contractor
N.A
N.A
Sr.Development work declared to RERA
1Demarcation of Plots
As per Layout plan
2Boundary Wall
As per Layout plan
3Road Work
As per Layout plan
4Footpaths
As per Layout plan
5Water Supply Including Drinking Water Facilities
As per Layout plan of scheme
6Sewer System
As per Layout plan of scheme
7Drain
As per Layout plan of scheme
8Parks
As per Layout plan of scheme
9Tree Planting
As per Layout plan of scheme
10Design For Electric Supply Including Street Lighting
As per Layout plan of scheme
11Community Buildings
As per Layout plan of scheme
12Treatment and Disposal System of Sewage and Sullage water
As per Layout plan of scheme
13Solid Waste Management And Disposal System
After completion of scheme will be handed over local body and local body will be make provision for solid waste disposal.
14Water Conservation System
As per Layout plan of scheme
15Energy Management System Including Use of Renewable Energy
Not Applicable
16Fire Protection And Fire Safety System
Not Applicable
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Layout plan of scheme
18Emergency Evacuation Services
Not Applicable
19Other Miscellaneous Work
As per Layout plan of scheme
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 1 May 2023. 1 of them carries a revalidation, valid to 1 May 2026.

Sanctioned by U.P. Awas Evam Vikas Parishad · 2,302.42 sqm of land · an approved plan of 1 block and 190 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
870/A.P.U-69 Apr 20188 Apr 20237 Apr 20251 Jan 2022—
APD/UNIT-6/BHINGA2 May 20181 May 202321 Sept 20268 Apr 20232 May 2018
valid to 1 May 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 4 completion extensions for this project, the latest running to 30 Jul 2026.

#Granted fromExtended uptoNote
11 Jan 202230 Jun 2022Six months extension in view of force majeure caused by covid-19 pandemic
230 Jun 20228 Apr 2023—
38 Apr 20237 Jul 2025—
47 Jul 202530 Jul 2026—

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
501,502,503,504,505,506,507,508,509,514,515,518,5247560Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1420-1425
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New28 Oct 2018 ↗

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q285%CA ↗ · Arch ↗ · Eng ↗
2025-Q3100%CA ↗ · Arch ↗ · Eng ↗
2025-Q4100%CA ↗ · Arch ↗ · Eng ↗
2026-Q1100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
EXE.ENG.CD-IV U.P AWAS EVAM VIKAS PARISHADBankBANK OF INDIABranchINDIRA NAGAR LUCKNOWA/C no.IFSCBKID0006852
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

15 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
Actual completion2026-08-03
first recorded by Estanzo
10 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich

Is Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich RERA registered?

Yes. Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich is registered with UPRERA under registration number UPRERAPRJ17903, registered on 31 Oct 2018. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich been completed?

UPRERA still lists Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich as Registered, so it is not shown as completed here. A completion certificate dated 3 Aug 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich more time to complete?

UPRERA's record carries 4 completion extensions for Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich, the latest running to 30 Jul 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich located?

Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich is registered in Bahraich, as filed with UPRERA.

What configurations are available in Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich?

The approved unit plan describes 1 block and 190 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of S.F.S semi finished L.I.G houses in Bahraich-Binga Marg Bhoomi Vikas Evam Grihsthan yojna, Bahraich?

About 334 units per acre: 190 planned units across 0.57 acres (2,302.42 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗