DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI

UPRERARegistered

DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in BHUMI VIKAS EWAM GRAH STHAN YOJNA -03 JHANSI, Jhansi (RERA ID UPRERAPRJ168930). Registered with a completion deadline of 30 Jun 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ168930
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 May 2025
Project duration2 months
AddressBHUMI EWAM VIKAS GRAHSTHAAN YOJNA NO-03 , GWALIOR-KANPUR BYPASS ROAD NH 27 JHANSI, BHUMI VIKAS EWAM GRAH STHAN YOJNA -03 JHANSI, Jhansi, Jhansi
TehsilJhansi
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2965

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered12 Jun 2025
Original completion30 Jun 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary11 Jul 2025
Registration fee₹54,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
JOYTI KATIYAAR
License CA/2005/36456
DIVISION 7 NEELGEERI COMPLEX LUCHNOW
Engineer
D B YADAV
OFFICE OF EXECUTIVE ENGINEER UP AWAS EWAM VIKAS PARISHAD B-1 TALPURA YOJNA JHANSI
Contractor
EXECUTIVE ENGINEER
OFFICE OF EXECUTIVE ENGINEER UP AWAS EWAM VIKAS PARISHAD B1 TAL PURA YOJNA JHANSI
Sr.Development work declared to RERA
1Demarcation of Plots
as per layout approved by housing commissioner . demarcation of plots must be done by bricks or stone piller.
2Boundary Wall
constructed as per specification of UP awas ewam vikas parishad and uppwd . the boudry wall height as per approved by Chief Engineer with RCC column and beam and bricks work.
3Road Work
constructed 6.0m wide , 7.50m wide , 9.0m wide , 12.00m wide and 18 meter as per approved layout . The GSB WMM and BM and SDBC work
4Footpaths
as per approved layout by Interlocking tiles
5Water Supply Including Drinking Water Facilities
as per approved design and drawing approved by UP awas ewam vikas parishad with 400 kl OHT and CWR by laying the internal water supply line . 150 mm 250mm PVC pipe as per required in design of water line approved by CE UPAVP and required water provide by UP Jal nigam or UP Jal sanasthan with prescribe rate in MOU.
6Sewer System
As per approved internal sewer line laid different dia as per required design 150mm ,200mm 250mm 400mm and 600mm dia with required manhole and chamber as well as connecting chamber . the collected sewer should disposed to collection tanks of STP after this the pump the stp next chamber or section for proper treatment . 1 MLD Sewerage treatment plants.
7Drain
As per approved design of internal drain k1 k2 and required section with brick work and RCC as approved design . the collection of all yojna collected water of drains to be disposed by RCC nala of Nagar Nigam
8Parks
As per approved layout . The 11 Nos of big pars lash of trees and greenery . the parks toe wall constructed by Brick work and Mild steel grills . for walking the residence the walking track was constructed .
9Tree Planting
tree and plats development plant for green
10Design For Electric Supply Including Street Lighting
as per approved design the substation and street light for proper lighting . The transferms DB was installing . the line was installing latest and mordern design .
11Community Buildings
to be construct . plots reserved
12Treatment and Disposal System of Sewage and Sullage water
treat by 1 MLD Sewer treatment plat and dispose. sullage water must be proper treated and disposal to the Nagar Nigam RCC nala .
13Solid Waste Management And Disposal System
to by developing the proper manage and dispose . By Door to door collection by Nagar Nigam Under Clean Indian and Healthy India.
14Water Conservation System
by developing rain water harvestment plats and water body.
15Energy Management System Including Use of Renewable Energy
to be development by owners. by roof solar
16Fire Protection And Fire Safety System
to be development by government and owners as per government Guidelines
17Social Infrastructure And Other Public Amenities Including Public Health Services
to be development and planed .must be as per Government Rules.
18Emergency Evacuation Services
to be development b government rules.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 28 Apr 2025.

Sanctioned by U.P. Awas Evam Vikas Parishad · 9,792 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
296530 Jul 202128 Apr 202528 Apr 203030 Jun 2025
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

32 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
23031920Khasra
2342230Khasra
2356390Khasra
2492510Khasra
2504970Khasra
3335470Khasra
3243400Khasra
3251080Khasra
3263560Khasra
3275990Khasra
33515260Khasra
3212020Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New5 May 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Feb 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New10 Feb 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New10 Feb 2025 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New2 May 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New11 Feb 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New10 Feb 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New10 Feb 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New25 Apr 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 May 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New19 Mar 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New11 Feb 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New11 Feb 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New29 Apr 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New25 Apr 2025 ↗

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2025-Q1.

QuarterConstructionCertificates
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UPAVP-COLL A/C DOF 53 NOS PLOT BVEGSYNO3 JHANSIBankHDFC BANK LIMITEDBranchMASIHA GANJ , SIPRI BAZAR , SHIVPURI ROAD JHANSIBranch address392, FIRST FLOOR MASIHA GANJ, SIPRI BAZAR SHIVPURI ROAD . JHANSI UTTER PRADESHBranch districtJhansiA/C no.IFSCHDFC0003858Branch emailneeraj.misra10@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UPAVP-SEP A/C DOF 53 NO PLOT BVEGSYNO3 JHANSIBankHDFC BANKBranchSIPRI BAZARBranch address392. FISRT FLOOR MASHIHAGANJ SIPRIBAZAR SIVPURI ROAD JHANSI .284003Branch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UPAVP-TRANS A/C DOF 53 NO PLOT BVEGSYNO3 JHANSIBankHDFC BANKBranchSIPRI BAZARBranch address392, FIRST FLOOR MASHIHAGANJ, SIPRI BAZAR ROAD , JHANSIBranch districtJhansi, Uttar PradeshA/C no.IFSCHDFC0003858
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI

Is DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI RERA registered?

Yes. DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI is registered with UPRERA under registration number UPRERAPRJ168930, registered on 12 Jun 2025. Estanzo reproduces that filing; it does not verify the work behind it.

Has DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI been completed?

UPRERA still lists DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI as Registered, so it is not shown as completed here. A completion certificate dated 11 Jul 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI located?

DEVELOPING OF 53 NOS PLOTS AT BHUMI VIKAS EWAM GRAH STHAN YOJNA NO-03 JHANSI is registered in BHUMI VIKAS EWAM GRAH STHAN YOJNA -03 JHANSI, Jhansi, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗