DLF Techpark Noida Phase 2

UPRERARegistered

DLF Techpark Noida Phase 2 is a RERA-registered commercial project by URVASI INFRATECH PRIVATE LIMITED in Plot No.1, Sector 143A, Noida, Gautam Buddha Nagar, U.P, Gautam Budh Nagar (RERA ID UPRERAPRJ385951). Registered with a completion deadline of 25 Nov 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
90.64%Q3'25
92.42%Q4'25
96.2%Q1'26
95.05%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ385951
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Apr 2023
Project duration44 months
AddressPlot No. 1, Sector 143A, Noida, Gautam Buddha Nagar, U.P, Plot No.1, Sector 143A, Noida, Gautam Buddha Nagar, U.P, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant address12TH FLOOR, DLF GATEWAY TOWER, DLF CITY, PHASE-III NATIONAL HIGHWAY NO. 8 GURGAON 122002 HR
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    NOIDA/CAP/2021/V-720/720

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. 3 completion certificates filed

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered16 Aug 2024
Original completion30 Sept 2026
Revised completion25 Nov 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary29 May 2025
Registration fee₹2,58,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors26 · 2 · 13 (units from plan)
ConfigurationUnitsCarpet area
OTHER264,352-4,787
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block D · OTHER13134,352-4,787
Block E · OTHER13134,352-4,787
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ROHIT SAINI
License CA/2020/121021
E-1, Block E, Sector 55, Noida
Engineer
RAKESH CHAUHAN
1/11042 STREET NO.7 SUBASH PARK, NAVIN SHAHDARA, DELHI 110032
Contractor
M/s RSB INFRASTRUCTURE LIMITED
SCO-34, First Floor, Sector-11, DLF, Faridabad-121006
Sr.Development work declared to RERA
1Demarcation of Plots
We have 3 side road plot of total size 100256 sq. mtr. (proposed project covered 33310 sq. mtr.) having 3 entrance gate towards east side (45 m. wide road), 2 entrance gate towards south side (45 m . Wide road) and 1 entrance gate towards west side (30 m. Wide road)
2Boundary Wall
"Data Centre 2 - The total boundary wall height is 2400mm and barbed wire above. (Data Centre 3) - The total boundary wall height is 2400mm and barbed wire above."
3Road Work
Data Centre 2 & 3) - Minimum 6M wide driveways are planned in tremix.
4Footpaths
" Data Centre 2 & 3) - Barrier free pedestrian movement is planned to connect different areas while avoiding vehicular clashes."
5Water Supply Including Drinking Water Facilities
(Data Centre 2 &3 )Treated water supply is provided through WTP Plant Room.
6Sewer System
"Combined STP Provided for Data Centre 1,IT Block of Phase 1 & Data Centre 2 also. MBBR STP provided in Campus."
7Drain
Storm water drainage provided. Storm water from Terrace, Roads and other landscape area shall be connected to Storm water drain channel with its further connectivity to Rain water harvesting Pit for recharge the Ground water. Overflow from RWH Pit shall be connected to Municipal drain line.
8Parks
" Data Centre 2 & 3) - Green area is planned along plot line and along the building. Multipurpose lawn is also planned."
9Tree Planting
" Data Centre 2 &3) - Trees are planned along boundary wall as buffer planting. Trees are also planned along building."
10Design For Electric Supply Including Street Lighting
"Common Area and Base Build lighting shall be Planned . As far as concern of High Side electrical System shall be deigned by STT(Client) We will design & implement Electrical System as per NBC Code/ Local Electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc."
11Community Buildings
Not proposed
12Treatment and Disposal System of Sewage and Sullage water
MBBR STP provided in Campus. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system, when would come into force.
13Solid Waste Management And Disposal System
" Block B - Combined STP Provided for Data Centre1 ,IT Block of Phase 1 and Data Centre 2 also"
14Water Conservation System
Project shall be planned with low flow fixtures as well dual flush cistern. Further rainwater harvesting system is also proposed to improve the ground water level.
15Energy Management System Including Use of Renewable Energy
" Data Centre 2 & 3 - We have provided LED Lighting for common area and external infra. Solar power generation we are using."
16Fire Protection And Fire Safety System
Fire Fighting and Fire Protection system is planned in campus as per NBC Code.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not proposed.
18Emergency Evacuation Services
Fire staircase shall be provided. And Refuse area shall also be provided as part of emergency evacuation services.
19Other Miscellaneous Work
Not proposed
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 25 Nov 2026.

Sanctioned by Noida Authority · 24,796 sqm of land · an approved plan of 2 blocks and 26 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
NOIDA/CAP/2021/V-720/72026 Nov 202125 Nov 202625 Nov 202930 Sept 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 25 Nov 2026.

#Granted fromExtended uptoNote
130 Sept 202625 Nov 2026—

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot No. 1, Sector 143 A, Noida24,796.04Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 897
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Khatauni extract · Merger of Land by way of amalgamation - DLF Commercial to DLF Home Developers
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Land Transfer to Urvasi Infratech - by DLF Home Developers
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Subsidiary Relationship between DLF home Developers and DLF Commercial
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Subsidiary Relationship between DLF home Developers and Urvasi Infratech
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · No Dues Certificate - Lease Payment - Urvasi Infratech
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Board Resolution authorizing Rajeev Singh as Authorized Signatory for RERA
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Scheme of Arrangement sanctioned by Honble High Court as per order dated 11.01.2011
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Lease deed · 5730
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
General body resolution
The resolution authorising an apartment owners’ association to act as the registering entity.
not reported—
Affidavit on balance development work
The promoter’s sworn statement about the development work still to be finished.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New1 Jul 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New1 Apr 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New1 Apr 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New1 Apr 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Apr 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Apr 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Apr 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New1 Apr 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 May 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New1 Apr 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New8 May 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New8 May 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New1 Apr 2024 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2023-Q1 to 2026-Q1.

QuarterConstructionCertificates
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q290.64%CA ↗ · Arch ↗ · Eng ↗
2025-Q392.42%CA ↗ · Arch ↗ · Eng ↗
2025-Q496.2%CA ↗ · Arch ↗ · Eng ↗
2026-Q195.05%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameURVASI INFRATECH PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM190453
PANAAACU9148A
CIN / TANDELU03476E
Name of chairmanMr. Sanjeev Shekhar Sharma
Registered address12TH FLOOR, DLF GATEWAY TOWER, DLF CITY, PHASE-III NATIONAL HIGHWAY NO. 8 GURGAON 122002 HR
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Urvasi Infratech Private Limited - Collection A/c - DLF Techpark Noida Phase 2BankICICI BankBranchK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301Branch addressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031Branch emailshweta.sin@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Urvasi Infratech Private Limited-Separate A/c-DLF Techpark Noida Phase 2BankICICI BankBranchK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301Branch addressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Urvasi Infratech Private Limited-Transaction A/c-DLF Techpark Noida Phase 2BankICICI BankBranchK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301Branch addressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Revised completion date on file2026-09-30 → 2026-11-25
changed in Estanzo’s record
7 Oct 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about DLF Techpark Noida Phase 2

Is DLF Techpark Noida Phase 2 RERA registered?

Yes. DLF Techpark Noida Phase 2 is registered with UPRERA under registration number UPRERAPRJ385951, registered on 16 Aug 2024. Estanzo reproduces that filing; it does not verify the work behind it.

Has DLF Techpark Noida Phase 2 been completed?

UPRERA still lists DLF Techpark Noida Phase 2 as Registered, so it is not shown as completed here. A completion certificate dated 29 May 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of DLF Techpark Noida Phase 2?

URVASI INFRATECH PRIVATE LIMITED is the promoter entity that filed DLF Techpark Noida Phase 2 with UPRERA (promoter RERA ID UPRERAPRM190453). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted DLF Techpark Noida Phase 2 more time to complete?

UPRERA's record carries 1 completion extension for DLF Techpark Noida Phase 2, the latest running to 25 Nov 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does DLF Techpark Noida Phase 2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is DLF Techpark Noida Phase 2 located?

DLF Techpark Noida Phase 2 is registered in Plot No.1, Sector 143A, Noida, Gautam Buddha Nagar, U.P, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in DLF Techpark Noida Phase 2?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in DLF Techpark Noida Phase 2?

The approved unit plan filed with UPRERA runs from 4,352 to 4,787 m² of carpet area (about 46,845 to 51,531 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in DLF Techpark Noida Phase 2?

The approved unit plan describes 2 blocks and 26 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is DLF Techpark Noida Phase 2?

About 4 units per acre: 26 planned units across 6.13 acres (24,796 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗