Earth Sapphire Court

UPRERAAbeyance

Earth Sapphire Court is a RERA-registered commercial project by EARTH INFRASTRUCTURES LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ9887). RERA status: Abeyance.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Abeyance.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ9887
Project categoryCommercial
Registration typeOngoing
RERA statusAbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary
Proposed start7 Oct 2010
Original start7 Oct 2010
Project duration99 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressB-100, Second Floor, Nariana Industrial Area, Phase-1 Delhi South West Delhi DL 110028 IN
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  4. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Abeyance. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered24 Oct 2017
Original completion31 Dec 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,20,000

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Design Forum International
License CA/91/13697
C 10 Sec.3 Noida
Engineer
Design Forum International
C 10 Sec.3 Noida

Permits & extensions

0 permits

An approval and the date it runs to - not proof the work matching it was done.

20,911 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Plans and approvals filed with RERA
DocumentFile
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗

Land & documents

2 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
PLOT NO-4820911—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 2 Sept 2009.

Registry no.DateTypeArea
108392 Sept 2009other—
Document checklist
DocumentStatusUploaded
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old12 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterMunicipal supplied water from HUDA / MCG will be treated for domestic purposes as per norms.
Fire safety (as filed with RERA)As per the National Building Code (NBC-2005, part IV), the basic minimum requirement for Fire Fighting Installation shall be provided for the proposed Project. • Fire alarms in case of fire • Display of emergency exits, emergency phone nos. • Overhead tanks and underground tank of reserve water for firefighting. • Fire hydrants and Hose reels. • Sprinklers shall be provided as per NBC. • Portable fire extinguishers shall be provided as per fire norms.
Health serviceMedical and other public health services will be provided.
Renewable energySolar power heaters/panels installation is under consideartion.
Other facilitiesSullage water ? STP will be provided to treat sewage and treated water will be used for flushing and gardening.

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameEARTH INFRASTRUCTURES LIMITED
RolePromoter · current
RERA IDUPRERAPRM19657
PANAABCE8286C
CIN / TANU45400DL2007PLC164905
Name of chairmanRAJNEESH MITTAL, VIKAS GUPTA, ATUL GUPTA
Registered addressB-100, Second Floor, Nariana Industrial Area, Phase-1 Delhi South West Delhi DL 110028 IN
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Earth Infrastructure Ltd.BankAxis BankBranchD.B GuptaA/C no.IFSCUTIB0000739
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about Earth Sapphire Court

Is Earth Sapphire Court RERA registered?

Yes. Earth Sapphire Court is registered with UPRERA under registration number UPRERAPRJ9887, registered on 24 Oct 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Earth Sapphire Court?

The completion date filed with UPRERA is 31 Dec 2018. No completion certificate is on record yet.

Who is the builder of Earth Sapphire Court?

EARTH INFRASTRUCTURES LIMITED is the promoter entity that filed Earth Sapphire Court with UPRERA (promoter RERA ID UPRERAPRM19657). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Earth Sapphire Court have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Earth Sapphire Court located?

Earth Sapphire Court is registered in Gautam Budh Nagar, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗