Eiffel Vivassa Estate Phase 1

UPRERARegistered

Eiffel Vivassa Estate Phase 1 is a RERA-registered residential project by EIFFEL INFRADEVELOPERS PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ669500). Registered with a completion deadline of 14 Sept 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ669500
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 May 2019
Project duration65 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompany
Applicant address10th Floor, Eldeco Corporate Chamber-II, Plot No. TC-58-V & TC-59-V, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh, India, 226010
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    MAP 20180719104540210

  2. 3 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 Jun 2019
Original completion15 Mar 2024
Revised completion14 Sept 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary15 May 2025
Registration fee₹69,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors192 · 4 · 12 (units from plan)
  • 3 BHK96 50%
  • 2 BHK96 50%
ConfigurationUnitsCarpet area
3 BHK96113
2 BHK9687
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
ASTRID 1 · 3 BHK1248113
ASTRID 2 · 3 BHK1248113
ELARA 1 · 2 BHK124887
ELARA 2 · 2 BHK124887
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sanjay Kumar Gupta
License CA/89/12382
First Floor Edleco Corp. Chamber 1 Vibhuti Khand, Lucknow
Engineer
Rajesh Kumar Singh
10th Floor, Eldeco Corporate Chamber - II, Vibhuti Khand, Gomti Nagar, Lucknow
Contractor
SN Tiwari
Prabha Enterprises 182-C, Eldeco Udyan-1, Bangla Bazzar Lucknow 226002
Sr.Development work declared to RERA
1Demarcation of Plots
Site is a single plot well demarcated at its location and approached by 45 mt. wide road on the south-east side. On the west side is an existing boundary of IIIT and on the east side is a proposed 18 mt. road.
2Boundary Wall
2.5 mt. high and 230 mm thick Boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry gate complex.
3Road Work
Complete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junctions and BLOCK entry points.
4Footpaths
All internal roads to have 0.75m wide footpath in 40- 60 mm thick concrete/granite pavers or equivalent finishes.
5Water Supply Including Drinking Water Facilities
underground water to be supplied through the terrace tank.
6Sewer System
Centralized Sewerage system as per design shall be Provided. All Sewerage disposal shall go to the STP for treatment and treated, recycled water shall be used for gardening and complex washing. overflow from the STP shall be connected to the Municipal sewerage system.
7Drain
A stormwater system as per design shall be Provided. Stormwater from terrace tops, Roads and other landscape areas shall be connected to the Stormwater drain channel and go to the Rainwater harvesting Pits to recharge the Groundwater and overflow shall be connected to Municipal drainage on main 45 mt. road.
8Parks
Highly enriched green parks with grass cover and plantation/shrubs have been proposed on approved location. Facilities like open Gym and children play equipments to be part of green areas.
9Tree Planting
"There are 5 types of trees proposed at the site: which are kachnar, gulmauhar, amaltas, kusum and neem."
10Design For Electric Supply Including Street Lighting
A well-designed electricity distribution system, as per norms of electricity Board, will be in place along with centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, STP, Pump room etc. 20% of street lighting shall have a solar panel.
11Community Buildings
Club Building With Basic Recreational Facilities Like Gym, Library And Common Room And Pool Facility. The Said Facility Will Be Shared By The Allottees Of Phase 2 Also.
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system shall be Provided. All Sewerage disposal shall go to the STP for treatment and after treatment, water shall be recycled and will be used in gardening, washing and flushing system . Overflow from the STP shall be connected with the Municipal sewerage system.
13Solid Waste Management And Disposal System
"Proper garbage disposal/collection point has been proposed. Nagar Nigam to collect garbage from this point. for solid waste management."
14Water Conservation System
A well-designed rainwater harvesting system has been planned along with 6 no. recharge pits for the whole building complex to conserve water. Rainwater from internal roads, rooftops and gardens shall be directed towards recharge pits through drain channels and pipes.
15Energy Management System Including Use of Renewable Energy
We will use LED light fittings in external and common areas as well as 20% solar street lights. In the STP and Pump room all the equipment shall have energy efficient motors/pumps.
16Fire Protection And Fire Safety System
Since the building is less than 45m in height all the fire norms shall be followed as NBC with the approval of the fire department. A dedicated pipeline along with hydrants will be connected to wet risers. Terrace tanks shall have a separate storage facility to store water for fire fighting.
17Social Infrastructure And Other Public Amenities Including Public Health Services
A creche for the children of labours during the construction period with play and study facility. Temporary toilets for workers during the construction period and an emergency medical kit.
18Emergency Evacuation Services
Exits from each and every point have been planned and proposed as per norms in case of emergency.
19Other Miscellaneous Work
N.A.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1VANDANA AGARWALUPRERAAGT13353
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 15 Mar 2024. 1 of them carries a revalidation.

Sanctioned by Lucknow Development Authority · 12,849 sqm of land · an approved plan of 4 blocks and 192 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
MAP 2018071910454021016 Mar 201915 Mar 202415 Mar 202715 Mar 2024—
MAP 2018071910454021016 Mar 201915 Mar 202415 Mar 202714 Sept 2024—
MAP 2018071910454021016 Mar 201915 Mar 202415 Mar 202714 Sept 202416 Mar 2019
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 14 Sept 2024.

#Granted fromExtended uptoNote
115 Mar 202414 Sept 2024Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
481, 480KA, 479KA, 477, 615, 614(part) 616(part), 617(part)12848.8Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 18456
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6279
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 12015
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9932
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 517
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15002
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 11764
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 11039
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 11040
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New21 May 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New24 May 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New24 May 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New24 May 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 May 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 May 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New24 May 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New22 May 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 May 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New24 May 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New22 May 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New22 May 2019 ↗

Quarterly progress reports

18 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

18 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameEIFFEL INFRADEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM84896
PANAADCE5855F
CIN / TANU70100UP2013PTC061342
Name of chairmanSHIV KUMAR GARG
Registered address10th Floor, Eldeco Corporate Chamber-II, Plot No. TC-58-V & TC-59-V, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh, India, 226010
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
EIFFEL INFRADEVELOPERS PRIVATE LIMITEDBankICICI BANK LTDBranchINDRA NAGAR BRANCHA/C no.IFSCICIC0000591
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

7 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)11 (Under Registration - 1 ) → 12 (Under Registration - 2 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)11 (Under Registration - 3 ) → 11 (Under Registration - 1 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)11 (Under Registration - 5 ) → 11 (Under Registration - 3 )
changed in Estanzo’s record
15 Sept 2026
Promoter’s complaints tally (all their projects)10 (Under Registration - 4 ) → 11 (Under Registration - 5 )
changed in Estanzo’s record
13 Sept 2026
Promoter’s complaints tally (all their projects)8 (Under Registration - 3 ) → 10 (Under Registration - 4 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)5 (Under Registration - 1 ) → 8 (Under Registration - 3 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)4 (Under Registration - 1 ) → 5 (Under Registration - 1 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 7 Oct 2026 · 7 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Eiffel Vivassa Estate Phase 1

Is Eiffel Vivassa Estate Phase 1 RERA registered?

Yes. Eiffel Vivassa Estate Phase 1 is registered with UPRERA under registration number UPRERAPRJ669500, registered on 26 Jun 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has Eiffel Vivassa Estate Phase 1 been completed?

UPRERA still lists Eiffel Vivassa Estate Phase 1 as Registered, so it is not shown as completed here. A completion certificate dated 15 May 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Eiffel Vivassa Estate Phase 1?

EIFFEL INFRADEVELOPERS PRIVATE LIMITED is the promoter entity that filed Eiffel Vivassa Estate Phase 1 with UPRERA (promoter RERA ID UPRERAPRM84896). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Eiffel Vivassa Estate Phase 1 more time to complete?

UPRERA's record carries 1 completion extension for Eiffel Vivassa Estate Phase 1, the latest running to 14 Sept 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Eiffel Vivassa Estate Phase 1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Eiffel Vivassa Estate Phase 1 located?

Eiffel Vivassa Estate Phase 1 is registered in Lucknow, as filed with UPRERA.

What configurations are available in Eiffel Vivassa Estate Phase 1?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Eiffel Vivassa Estate Phase 1?

The approved unit plan filed with UPRERA runs from 87 to 113 m² of carpet area (about 937 to 1,214 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Eiffel Vivassa Estate Phase 1?

The approved unit plan describes 4 blocks and 192 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Eiffel Vivassa Estate Phase 1?

About 60 units per acre: 192 planned units across 3.18 acres (12,849 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗