Elara

UPRERARegistered

Elara is a RERA-registered residential project by EMAAR INDIA LIMITED (Formerly known as Emaar MGF Land Limited)) in Ardaunamau, Lucknow (RERA ID UPRERAPRJ223128). Registered with a completion deadline of 5 Sept 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ223128
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start5 Sept 2026
Project duration61 months
AddressC.P, Sector-7, Gomti Nagar Extension, Lucknow., Ardaunamau, Sarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant address306-308, Square One, C-2, District Centre, Saket, South Delhi, New Delhi, Delhi, India, 110017
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/9725/LDA/BP/MS/2026-27/13258/05092026

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered17 Oct 2026
Original completion5 Sept 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹43,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors194 · 1 · 35 (units from plan)
ConfigurationUnitsCarpet area
3 BHK19498-122
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
EL · 3 BHK, OTHER3519498-122
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Tonish Verma
License CA/2002/30237
42 FF, HIG Pink Flats, Raiguru Nagar, Backside MBD Mall, Ferozepur orad, Ludhiana, Punjab, 141012
Engineer
Precilient Engineering Private Limited_
F-19, South City-2, Sec-50, Gurugaon, Haryana, 122018
Contractor
M/s Mega Infra Developers
B-1/236, Vikrant Khand-1, Gomti Nagar, Lucknow, UP, 226010
Sr.Development work declared to RERA
1Demarcation of Plots
1. One plot of size 7518.10 sq. mtr. 2. Primary main entrance gate from the 45 m wide front road
2Boundary Wall
1. 1.80 meters height 2. 387.911 meters length 3. brick/block work construction 4. finishes with plaster and paint.
3Road Work
1. From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. 2. The road wideness starts from 6 mtr.
4Footpaths
1- As mentioned in the Road works, Pedestrian walkway shall be developed along internal roads using interlocking pavers.
5Water Supply Including Drinking Water Facilities
1- We will provide One Borewell for water supply to fill 90 KLD UGT . In addition, there are two static water fire tanks of capacity 200 and 130 KLD where the water need not be filled on daily basis. One monoblock pump set having 15 Cum/hr and head 150 mtr will be installed in UGT Room, which further fill OHT (Fire Tank- 10KLD, Treated Water-30KLD (2 nos). Water will be supplied to each apartment with gravity feeding via downtake pipes installed in shaft. 2- We have provisioned a spare borewell as backup in case of any emergency requirement. 3- We have provisioned the Tanker water connection in our UGT (Underground water tank) for any emergency water requirements.
6Sewer System
All Sewerage water shall go to the 160KLD STP and treated water from STP shall be used in flushing/landscape & excess water shall be connect with the Municipal sewerage system. Pipe Used in Vertical Stacks and inside toilets for Soil/Waste disposal will be UPVC SWR.
7Drain
Storm water network shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit to recharge the Ground water and overflow shall be connect with Municipal drain line.
8Parks
We will provide approx 837 sqm green area with the different activities on designated location as per sanction drawing.
9Tree Planting
We will provide many type of trees all along the boundary wall & green area
10Design For Electric Supply Including Street Lighting
We will design & implement the system as per local electricity Board and will provide 2 centralized Transformer with capacity of 800KVA for apartments and 1000KVA for Common area, HT panel, LT Panel, Feeder Pillar and 2X750KVA DG back for common service & apartments like External lighting, Fountain, STP, Pump room etc.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
All Sewerage water shall be go to the 160KLD STP and treated water from the STP shall be used in flushing/landscape & excess water shall be connect with the Municipal sewerage system.
13Solid Waste Management And Disposal System
Proper garbage collection area provided for the solid waste management. 300KG OWC machine will be provided for the treatment of waste from Households.
14Water Conservation System
Low flow fixtures as well dual flush cistern and raw water harvesting system will be provided to reduce the water consumption and improve the ground water level.
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area. In Pump room also, the equipment shall have energy efficient motor.
16Fire Protection And Fire Safety System
Fire Fighting facility in common areas & apartments will be installed as per local authorities requirement. Electric Sprinkler Main Pump- 1 Electrical Hydrant main Pump-1 Electrical sprinkler Jockey Pump-1 Electrical Hydrant Jockey pump-1 Main Diesel Engine Pump-1 Water Curtain Pump-1 Sprinkler and hydrant system in basement and tower area Fire COntrol room at ground floor with hybrid fire alarm system FAPA, MOEFA for towers, ventilation jet fans for basement area pressurization fans for lift wells lobbies and stairs are naturally cross ventilated
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Staircases/Fire exit lobbies with cross ventilation/pressurization will be provided with emergency exit doors and emergency exit gates.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

65 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1AADHAR PROPMART PRIVATE LIMITEDUPRERAAGT10142
2Abhinav AgarwalUPRERAAGT25868
3Ajay Kumar TiwariUPRERAAGT16350
4Amarnath PandeyUPRERAAGT22741
5ANIL KUMAR VERMAUPRERAAGT14346
6ANKUR SHARMAUPRERAAGT25537
7ARCHANA GUPTAUPRERAAGT10881
8Arvind Kumar VermaUPRERAAGT12382
9Ashish AnandUPRERAAGT25053
10ASHOK KUMAR SINGHUPRERAAGT16615
11Bhan Pratap Singh C/o Pratap AssociatesUPRERAAGT16163
12BRIXWELL REALTY & CONSTRUCTION LLPUPRERAAGT15068
13BYANKTESHWAR PRATAP SINGHUPRERAAGT24395
14ELEGANCE ENTERPRISESUPRERAAGT25477
15Gagan TondonUPRERAAGT14217
16GLICKMAN REALTORS PRIVATE LIMITEDUPRERAAGT25027
17GOLDEN ESTATEUPRERAAGT10397
18Hitesh KesarwaniUPRERAAGT11538
19HITESH KHANNAUPRERAAGT13833
20LINK PROPERTIESUPRERAAGT10081
21M/s MONEYTREE REALTY SERVICES LIMITED formally known as (M/s Moneytree Reality Services Private Limited)UPRERAAGT25048
22Mahima SinghUPRERAAGT17171
23MANGALGRUHUM REALTY PRIVATE LIMITEDUPRERAAGT24450
24Mani Land and Housing LLPUPRERAAGT25232
25manju tripathiUPRERAAGT14947
26MAYANK KUMARUPRERAAGT18366
27MOHAMMAD RASHIDUPRERAAGT15251
28MOHSIN KHANUPRERAAGT22544
29Mukesh kumar SharmaUPRERAAGT11494
30NEOEXCEL LLPUPRERAAGT25260
31NEXT BEES REAL ESTATE LLPUPRERAAGT26012
32Pankaj yadavUPRERAAGT26431
33Prateek ShuklaUPRERAAGT18849
34PRIYANK SHEKHARUPRERAAGT13933
35Pulkit SethiUPRERAAGT25269
36puspanjali mohantyUPRERAAGT23377
37R N ESTATE AND PROPERTIES PRIVATE LIMITEDUPRERAAGT14396
38RADHESH CHANDRAUPRERAAGT10484
39RAJNEESH KUMAR SRIVASTAVAUPRERAAGT13023
40RAKESH DEWANUPRERAAGT15661
41RAMJI SINGHUPRERAAGT23922
42RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
43Renu PandeyUPRERAAGT25718
44Rohit ChandaniUPRERAAGT11546
45Rohit SinghUPRERAAGT19128
46SAIM AHMADUPRERAAGT15637
47SANJEEV KUMAR BANKAUPRERAAGT10894
48Santosh KumarUPRERAAGT13874
49Saurabh MishraUPRERAAGT22712
50SDR INFRA BUILD PVT LTDUPRERAAGT11062
51Shakti pratap singhUPRERAAGT24496
52SHALINI WADHWAUPRERAAGT15032
53SIDHA CONSTRUCTIONSUPRERAAGT11253
54STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
55Sumit SinghUPRERAAGT12057
56SUNIL KUMAR PRAJAPATIUPRERAAGT12499
57TARUN PREET SINGH SAHNIUPRERAAGT12537
58TRINERGY PROP SOLUTIONS PRIVATE LIMITEDUPRERAAGT22608
59VAAP ESTATE PRIVATE LIMITEDUPRERAAGT23033
60Varun Properties Inc.UPRERAAGT11985
61VIKAS PANDEYUPRERAAGT13313
62VINAY KUMAR SINGHUPRERAAGT11226
63VIRENDRA KUMAR DEWANUPRERAAGT13205
64VISHAL BAJPAIUPRERAAGT11344
65VIVEK TRIPATHIUPRERAAGT23738
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 5 Sept 2031.

Sanctioned by Lucknow Development Authority · 7,519 sqm of land · an approved plan of 1 block and 194 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/9725/LDA/BP/MS/2026-27/13258/050920265 Sept 20265 Sept 20315 Sept 20315 Sept 2031
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
CP7581.70Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4455
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · Compliance Report
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New24 Sept 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New9 Oct 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New28 Sept 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New28 Sept 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New9 Oct 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New9 Oct 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New9 Oct 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New7 Sept 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New28 Sept 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New28 Sept 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New28 Sept 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New28 Sept 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New24 Sept 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New9 Oct 2026 ↗
Affidavit on FORM RA-8 for credit availed/ to be availed along with CA certificate regarding disbursementNew9 Oct 2026 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameEMAAR INDIA LIMITED (Formerly known as Emaar MGF Land Limited))
RolePromoter · current
RERA IDUPRERAPRM6473
PANAABCE4308B
CIN / TANU45201DL2005PLC133161
Name of chairmanMr. Majed Khalfan Bin Theniyah
Registered address306-308, Square One, C-2, District Centre, Saket, South Delhi, New Delhi, Delhi, India, 110017
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
EMAAR INDIA LIMITED- COLLECTION ACCOUNT FOR ELARABankStandard Chartered BankBranchHalwasiya Commerce House, LucknowBranch addressUnit No. 1, Ground Floor, Halwasiya Commerce House, Habibullah Estate, 11 M.G. Marg, Lucknow, Uttar Pradesh 226001Branch districtLucknow, Uttar PradeshA/C no.IFSCSCBL0036036Branch emailAnoop. Yadav@sc.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
EMAAR INDIA LIMITED- SEPARATE BANK ACCOUNT FOR ELARABankStandard Chartered BankBranchHalwasiya Commerce House, LucknowBranch addressUnit No. 1, Ground Floor, Halwasiya Commerce House, Habibullah Estate, 11 M.G. Marg, Lucknow, Uttar Pradesh 226001Branch districtLucknow, Uttar PradeshA/C no.IFSCSCBL0036036
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
EMAAR INDIA LIMITED- RERA TRANSACTION ACCOUNT FOR ELARABankStandard Chartered BankBranchHalwasiya Commerce House, LucknowBranch addressUnit No. 1, Ground Floor, Halwasiya Commerce House, Habibullah Estate, 11 M.G. Marg, Lucknow, Uttar Pradesh 226001Branch districtLucknow, Uttar PradeshA/C no.IFSCSCBL0036036
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Elara

Is Elara RERA registered?

Yes. Elara is registered with UPRERA under registration number UPRERAPRJ223128, registered on 17 Oct 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Elara?

The completion date filed with UPRERA is 5 Sept 2031. No completion certificate is on record yet.

Who is the builder of Elara?

EMAAR INDIA LIMITED (Formerly known as Emaar MGF Land Limited)) is the promoter entity that filed Elara with UPRERA (promoter RERA ID UPRERAPRM6473). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Elara have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Elara located?

Elara is registered in Ardaunamau, Lucknow, as filed with UPRERA.

What configurations are available in Elara?

The unit plan filed with UPRERA lists 3 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Elara?

The approved unit plan filed with UPRERA runs from 98 to 122 m² of carpet area (about 1,051 to 1,315 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Elara?

The approved unit plan describes 1 block and 194 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Elara?

About 104 units per acre: 194 planned units across 1.86 acres (7,519 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗