Eureka Park - Phase 2 is a RERA-registered residential project by Land Kart Builders Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ469983). Registered with a completion deadline of 30 Sept 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ469983 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Oct 2021 |
| Project duration | 60 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | Landkart Builders Private Limited Eureka Park Plot No. - SC 02/A-1 Sector- 150, Noida, Gautam Budhha Nagar Uttar Pradesh- 201310 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
NOIDA/IV/1500/934
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 6 Oct 2021 |
| Original completion | 30 Sept 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,56,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 688 | 71-91 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| TOWER 15- TYPE C2 · 3 BHK | 23 | 88 | 91-91 |
| TOWER 16- TYPE C2 · 3 BHK | 23 | 88 | 71-91 |
| TOWER 17- TYPE C2 · 3 BHK | 23 | 88 | 91-91 |
| TOWER 18- TYPE C2 · 3 BHK | 23 | 88 | 91-91 |
| TOWER-11-TYPE B2 · 3 BHK | 29 | 112 | 73 |
| TOWER-12- TYPE B2 · 3 BHK | 29 | 112 | 73 |
| TOWER-14- TYPE B1 · 3 BHK | 29 | 112 | 73 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The plot is part of over all sports city in sector 150 Noida. The Same is demarcated as per the overall approved master plan. |
| 2 | Boundary Wall The Boundary wall shall be constructed on 2 sides towards the outer boundary of sports city. The boundary face towards inner side of the sports city shall be developed with MS frames and soft fence through plantation. |
| 3 | Road Work The internal roads shall be constructed in black asphalt road/bitumen with WBM and other required layers. |
| 4 | Footpaths The foothpath shall be constructed in project with concrete finish or as per the landscape design. |
| 5 | Water Supply Including Drinking Water Facilities All apartments shall be provided with domestic water for household activities and STP treated water for flushing. The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water. |
| 6 | Sewer System The Sewer system of the project is designed with chambers and manholes and the entire sewer is routed to STP for treated. The treated water from sewer is supplied for irrigation in landscapes and flushing in toilets. The extra water from sewer shall be coonected to master services of the sports city for usage in other green areas of the sports city. |
| 7 | Drain The Drain system is planned with combinations of drains ,chambers and manholes.The entire storm water is routed to rain water harvesting pits for recharging the ground water. The overflow from the recharge pits shall be connected to the master services of the sports city. |
| 8 | Parks The Parks and other landscaped areas will be developed with kids playing areas, multipurose lawn,badminton court,putting green and other playing areas. |
| 9 | Tree Planting The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape. |
| 10 | Design For Electric Supply Including Street Lighting The entire electricity is planned as per the electricity norms and in addition DG power backup is provided in the essentrial common areas of the project. And limited power backup (depending on size of apartment) for necessary amenities is provided in the apartment as well. |
| 11 | Community Buildings Community Building will be constucted in project with mini-theatre,spa with steam and sauna ,swimming pools with changing rooms,yoga/medidation room, multipurpose hall ,Gymanasium,squash court,indoor playing areas etc. |
| 12 | Treatment and Disposal System of Sewage and Sullage water The swer system of the project is designed with chambers and manholes. and the entire sewer is routed to STP for treated. The treated water from sewer is supplied for irrigation in landscape and flushing in toilets. The extra water from sewer shall be connected to master services of the sports city for usage in othrer green areas of the sports city. |
| 13 | Solid Waste Management And Disposal System The solid waste shall be encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas. From where the BIO WASTE shall be converted to manure through OWC within the campus and other waste shall be handed over to the government vendors for further disposal. |
| 14 | Water Conservation System For water conservation all toilets shall be provided with dual flush fixtures,low fittings shall be provided and Treated water from STP shall be used for irrigation and flushing. |
| 15 | Energy Management System Including Use of Renewable Energy For energy management the meters shall be installed at all critical locations and further maximum LED light fixtures shall be used in common areas. Solar street light shall be provided on the roads as per the authority recommendation. Water supplied through common solar heating system to all kitchens. |
| 16 | Fire Protection And Fire Safety System The fire protection and safety systems are provided as per the approved scheme from fire authorities with sprinklers and smoke/heat detectors and where recommended/required. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services The Social infrastructure shall be provided with domestic water supply with tanks,STP treted water for flushing with tanks and irrigation ,storm /rain water drainage system,sewer drainage system,waste water drainage system,firefighting system including sprinklers ,FHC detectors ,fire water tank ,authority main power supply ,Dg power backup for essential common supply,lifts. |
| 18 | Emergency Evacuation Services For emergency evacuation the staircases are provided ,lifts rea provided and a dedicated assembly areas are also defined in the campus.Adequate signage is also provided. |
| 19 | Other Miscellaneous Work Not applicable |
Registered agents
95 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | Aakriti Mittal | UPRERAAGT14548 |
| 3 | ACUBE SOLUTIONS | UPRERAAGT10220 |
| 4 | Adesh Kumar | UPRERAAGT17449 |
| 5 | Aditya Agarwal | UPRERAAGT21260 |
| 6 | ALOK UPADHYAY | UPRERAAGT12497 |
| 7 | AMIT GAUR | UPRERAAGT15796 |
| 8 | Anand kumar | UPRERAAGT19399 |
| 9 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 10 | Ankit Goyal | UPRERAAGT22798 |
| 11 | ANSHU TRIPATHI | UPRERAAGT17341 |
| 12 | Babulal Gourishankar Thirani | UPRERAAGT22585 |
| 13 | BELPATRAM INFRATECH PRIVATE LIMITED | UPRERAAGT17551 |
| 14 | BHR Consultings | UPRERAAGT21880 |
| 15 | BigBridge Awas Solutions Pvt. Ltd. | UPRERAAGT23504 |
| 16 | BLUECRUMBS INFRA PRIVATE LIMITED | UPRERAAGT16897 |
| 17 | BRICKLAND CONSULTING PVT LTD | UPRERAAGT21208 |
| 18 | BULLMEN REALTY INDIA PRIVATE LIMITED | UPRERAAGT10138 |
| 19 | Chetan Sharma | UPRERAAGT18686 |
| 20 | CLUB ONE REALTORS LLP | UPRERAAGT20209 |
| 21 | Craft Financial Advisors Pvt L | UPRERAAGT20277 |
| 22 | Dhirendra Kumar Singh | UPRERAAGT21031 |
| 23 | Dinesh Singh | UPRERAAGT12536 |
| 24 | FINDMYPROPERTY PRIVATE LIMITED | UPRERAAGT11867 |
| 25 | Geetanjali Homestate Private Limited | UPRERAAGT23464 |
| 26 | Gen X Estate LLP | UPRERAAGT14766 |
| 27 | GROW INFINITY REALTORS | UPRERAAGT23233 |
| 28 | Harijesh Kumar Gupta | UPRERAAGT23153 |
| 29 | HONEY MONEY ASSOCIATES LIMITED | UPRERAAGT11535 |
| 30 | HOUSE SEEKERS INDIA PRIVATE LIMITED | UPRERAAGT23513 |
| 31 | INVEST MANGO | UPRERAAGT12212 |
| 32 | INVESTOR HOMEZ | UPRERAAGT15046 |
| 33 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 34 | INVESTOXPERT ADVISORS PVT LTD | UPRERAAGT21108 |
| 35 | JENIKA VENTURES Private Limited | UPRERAAGT21501 |
| 36 | KAPIL ARORA | UPRERAAGT21512 |
| 37 | KARTIK INFRATOWN PRIVATE LIMITED | UPRERAAGT10413 |
| 38 | Kutumb Services | UPRERAAGT13108 |
| 39 | LAKSHAY PAL | UPRERAAGT21657 |
| 40 | M/s Northbrick Consultancy Pvt Ltd.(formerly Known as Northbrick ventures Pvt Ltd) | UPRERAAGT16860 |
| 41 | MAHAK SAXENA | UPRERAAGT22209 |
| 42 | Manmeet Singh Ahluwalia | UPRERAAGT16812 |
| 43 | MANOJ KUMAR VERMA | UPRERAAGT19282 |
| 44 | MBS CONSULTING | UPRERAAGT20831 |
| 45 | MOHIT GOYAL | UPRERAAGT15259 |
| 46 | Naturetech Realty Private Limited | UPRERAAGT10282 |
| 47 | ORION REALCON PVT.LTD | UPRERAAGT23154 |
| 48 | PC MANTRA INFOSYSTEM PVT. LTD. | UPRERAAGT10580 |
| 49 | PRIYANKA MARWHA | UPRERAAGT18841 |
| 50 | PROP- KEYS CONSULTING PRIVATE LIMITED | UPRERAAGT23188 |
| 51 | propconsult c/o sonu chaudhary | UPRERAAGT16611 |
| 52 | PROPERTYFOLKS ADVISORY PRIVATE LIMITED | UPRERAAGT20615 |
| 53 | Propertypistol Realty Pvt Ltd | UPRERAAGT12730 |
| 54 | PROPSELLER INDIA PRIVATE LIMITED | UPRERAAGT22343 |
| 55 | PROPSHOP | UPRERAAGT10129 |
| 56 | PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED) | UPRERAAGT10032 |
| 57 | PROPZILLA INFRATECH PVT.LTD | UPRERAAGT21048 |
| 58 | RAJ NANDINI ESTATES PRIVATE LIMITED | UPRERAAGT10793 |
| 59 | Rajesh Singh | UPRERAAGT11077 |
| 60 | Ranjan kumar | UPRERAAGT20850 |
| 61 | Rathi Global Realty Services Private Limited | UPRERAAGT21920 |
| 62 | Ravindra Yadav | UPRERAAGT22235 |
| 63 | RAVS INFRATECH PRIVATE LIMITED | UPRERAAGT20392 |
| 64 | REALTY ASSISTANT PRIVATE LIMITED (Formerly REALTY ASSISTANTS HUB PVT LTD) | UPRERAAGT18286 |
| 65 | Rohit Verma | UPRERAAGT19463 |
| 66 | Sandeep Tripathi | UPRERAAGT12229 |
| 67 | Sangeeta kumari | UPRERAAGT23125 |
| 68 | SANJAY AHUJA | UPRERAAGT14187 |
| 69 | Saurav Sharma | UPRERAAGT19648 |
| 70 | Seamless Realty Solutions (Aspire Assets) | UPRERAAGT21811 |
| 71 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 72 | SOMIT SHARMA | UPRERAAGT16099 |
| 73 | Sonali Mahant | UPRERAAGT15610 |
| 74 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 75 | star estate | UPRERAAGT10202 |
| 76 | SUMANNA SAGAR (DEVLIN INFRATECH) | UPRERAAGT13908 |
| 77 | Sumit Shaw | UPRERAAGT20916 |
| 78 | Supertrust Homes Pvt Ltd | UPRERAAGT16429 |
| 79 | Suraj Trehan | UPRERAAGT20095 |
| 80 | SUSHIL SINGH | UPRERAAGT23101 |
| 81 | Sushil vyas | UPRERAAGT13744 |
| 82 | Tanmai Mehrotra | UPRERAAGT20817 |
| 83 | Tata Capital Limited (formally as known Tata Capital Financial Services Limited) | UPRERAAGT13915 |
| 84 | Trisol RED Infraventures Pvt Ltd | UPRERAAGT11579 |
| 85 | TRUSTCON SPACES | UPRERAAGT10305 |
| 86 | Tushar | UPRERAAGT19143 |
| 87 | UA REALTORS LLP | UPRERAAGT21570 |
| 88 | URBAN AVENUES LLP | UPRERAAGT10834 |
| 89 | Vennus Sidaana | UPRERAAGT19756 |
| 90 | Vikas Mallan | UPRERAAGT21321 |
| 91 | VINOD KUMAR JHA | UPRERAAGT19088 |
| 92 | VIVEK KUMAR SRIVASTAVA | UPRERAAGT18884 |
| 93 | VIVEK TYAGI | UPRERAAGT11988 |
| 94 | WEALTH CLINIC PRIVATE LIMITED | UPRERAAGT10521 |
| 95 | ZILLION VENTURES | UPRERAAGT23128 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 24 Oct 2021.
Sanctioned by Greater Noida Authority · 30,166 sqm of land · an approved plan of 7 blocks and 688 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| NOIDA/IV/1500/934 | 24 Oct 2016 | 24 Oct 2021 | 24 Oct 2026 | 30 Sept 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| SC-02/A1 | 30166 | Plot |
| Lease deed · 6336 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 28 Sept 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 1 Sept 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 2 Sept 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 1 Sept 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Sept 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 2 Oct 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 29 Sept 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 29 Sept 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 3 Sept 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 2 Oct 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 2 Oct 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 2 Oct 2021 ↗ |
Quarterly progress reports
19 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
19 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 92.9% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 94.9% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 97.2% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 98% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Land Kart Builders Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM11547 |
| PAN | AADCL0533D |
| CIN / TAN | U70200UP2016PTC082780 |
| Name of chairman | Joy George |
| Registered address | Landkart Builders Private Limited Eureka Park Plot No. - SC 02/A-1 Sector- 150, Noida, Gautam Budhha Nagar Uttar Pradesh- 201310 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Land Kart Builders Pvt Ltd Collection A/c Eureka Park Ph 2BankICICI BankBranchGautam Budh NagarBranch addressKrishna Apra Royal Plaza, D2, E ACB, Alpha Gautam Budh Nagar Uttar PradeshBranch districtGautam Buddha NagarA/C no.IFSCICIC0000254 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Land Kart Builders Pvt Ltd Separate A/c Eureka Park Ph 2BankICICI BankBranchGautam Budh NagarBranch addressKrishna Apra Royal Plaza, D2, E ACB, Alpha Gautam Budh Nagar Uttar PradeshBranch districtGautam Buddha NagarA/C no.IFSCICIC0000254 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Land Kart Builders Pvt Ltd RERA A/c Eureka Park Ph-2BankICICI BankBranchGautam Budh NagarBranch addressKrishna Apra Royal Plaza, D2, E ACB Alpha Gautam Budh Nagar Uttar PradeshBranch districtGautam Buddha NagarA/C no.IFSCICICI0000254 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 27 (Under Registration - 0 ) → 28 (Under Registration - 1 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 5 Oct 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Eureka Park - Phase 2
Is Eureka Park - Phase 2 RERA registered?
Yes. Eureka Park - Phase 2 is registered with UPRERA under registration number UPRERAPRJ469983, registered on 6 Oct 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Eureka Park - Phase 2?
The completion date filed with UPRERA is 30 Sept 2026. No completion certificate is on record yet.
Who is the builder of Eureka Park - Phase 2?
Land Kart Builders Private Limited is the promoter entity that filed Eureka Park - Phase 2 with UPRERA (promoter RERA ID UPRERAPRM11547). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Eureka Park - Phase 2 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Eureka Park - Phase 2 located?
Eureka Park - Phase 2 is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Eureka Park - Phase 2?
The unit plan filed with UPRERA lists 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Eureka Park - Phase 2?
The approved unit plan filed with UPRERA runs from 71 to 91 m² of carpet area (about 766 to 981 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Eureka Park - Phase 2?
The approved unit plan describes 7 blocks and 688 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Eureka Park - Phase 2?
About 92 units per acre: 688 planned units across 7.45 acres (30,166 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗