EWS, Gokuldham under PMAY

UPRERARegistered

EWS, Gokuldham under PMAY is a RERA-registered residential project by TREADSTONE LIMITED in Magarwara, Unnao (RERA ID UPRERAPRJ598095). Registered with a completion deadline of 25 Dec 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
17%Q4'24
22%Q1'25
32%Q2'25
60%Q3'25
66%Q4'25
69%Q1'26
71%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ598095
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryKanpur Development Authority
Proposed start26 Jun 2024
Project duration30 months
AddressKhasra No. 1503, 1504, 1506, 1507 , Magarwara, Unnao, Uttar Pradesh, PIN-209862, Magarwara, Unnao, Unnao
TehsilUnnao
Applicant typeCompany
Applicant address52/3,4,5 BLOCK T FACTORY AREA, FAZALGANJ, Kanpur, KANPUR, Uttar Pradesh, India, 208012
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    KDA/BP/22-23/1350

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 Aug 2025
Original completion25 Dec 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹89,000
Sanctioning authorityKanpur Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors993 · 5 · 15 (units from plan)
ConfigurationUnitsCarpet area
1 BHK99323
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER A · 1 BHK1413723
TOWER B · 1 BHK1535523
TOWER C · 1 BHK1517723
TOWER D · 1 BHK1517723
TOWER E · 1 BHK1514723
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Atanu Chakraborty
License CA/99/24684
Rajarhat Gopalpur, North 24 Pargana - 700080 (W.B)
Engineer
Chandi Prasad Khanra
63/22 Brindaban Mullick Lane, Howrah - 711101 (W.B)
Contractor
Treadstone Limited
52/3,4,5, T Fazalganj, Kanpur, U.P. - 208012
Sr.Development work declared to RERA
1Demarcation of Plots
its boundaries (latitude and longitude of the end points) 26.518386 - 80.438941 to the North 26.517273 -80.439354 to the south 26.518291 - 80. 438885 to the East 26.517692 - 80. 43997 to the West of Village Magarwara Tehsil Unnao Development Authority Kanpur, District Unnao, PIN 209862.
2Boundary Wall
250 MM thk. Brick Wall with column 3.3 m C/C height of boundary wall 2.4 M.
3Road Work
20 mm thk.premix carpet seal coat over 75 thk. Bituminous macadam / 450 mm thk. comated W.B.M. / 250 MM thk. granular sub base / 150 mmthk compacted moorum.
4Footpaths
25mm thk. paver tiles over WBM fixed with 35/50 mm sand in Zigzag pattern.
5Water Supply Including Drinking Water Facilities
Domestic water supply lines to Plots from OHT or UGR.OHT/UGR will feed from Municipal water supply line.
6Sewer System
Underground Sewer System through HDPE pipe and pit (As per IS Code) to STP within the premises. (Inside project domain)
7Drain
Underground Drainage System through HDPE pipe and pit (As per IS Code). Overflow to Municipal Drain.
8Parks
We will provide landscape with civil work 125/ 250 mm thk. brick, stone , paver grass , various type of plantation and foot path inside the park.
9Tree Planting
Tree Plantation as per sanctioned plan . There are various type of trees / shurbs here like Ashok, Neem , Neebu, Peela Gulmohar, Dhak/ Palash, Blackboard, tree ( Chitvan)/ Bougainvilla, Orange, Jessamie, Neelkanth, Pila Kaner.
10Design For Electric Supply Including Street Lighting
Service connections to plots from captive sub-stations and park lighting 6.5/9 metres Electric Pole as per layout.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
Total tread water generated at site per day will be 373KLD through 425KLD STP.142 KLD of treated water will be reused in flushing and gardening. Rest 156KLD of treated water from STP will be discharged to city sewer line.
13Solid Waste Management And Disposal System
3511KG/Day solid waste will be generated at site of which 1755kg/day will be proposed through composter machine size of 2000kg/day at site to convert into valuable compost which can be used as compost/manure for the landscaping with in the premises. Rest of the recyclable and non biodegradable waste will be collected from site by Municipal or Private solid waste collection organisation as may be applicable on regular intervals.
14Water Conservation System
Providing installing and commissioning of electro-Mechanical equipment of 175KLD for tertiary treatment including all filtration vessels (FRP), filter press, Air blower, al type of pumps, panel, electrical equipment (wire and cables), all types of pipes, etc. Complete in all respect as per MBBR specification and drawing. The STP treated water will be used for flushing, landscaping etc. The quality of treated water should be matched as per PCB guideline or any local authority recommendation. 142KLD of water is being reused per day through treatment of STP.
15Energy Management System Including Use of Renewable Energy
Solar Energy system will be installed as per norms.
16Fire Protection And Fire Safety System
Supply, erection, testing and commissioning of Electrical Motor driven main pump, centrifugal horizontal type, with gland packing capable of deliver 2850 LPM at 88 MWC. The pump shall be coupled with TEFC motor of suitable KW with speed of 2900 RPM with all accessories and complete set shall mounted on common bas
17Social Infrastructure And Other Public Amenities Including Public Health Services
Proper Water Supply and Sanitary facilities.
18Emergency Evacuation Services
Yes, Refuge area provided at every Tower at 25.56 M lev.
19Other Miscellaneous Work
Proper security system including security guard , CCTV cameras available.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 18 Mar 2029.

Sanctioned by Kanpur Development Authority · 16,710 sqm of land · an approved plan of 5 blocks and 993 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
KDA/BP/22-23/135019 Mar 202418 Mar 202918 Mar 203225 Dec 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1503, 1504, 1506, 1507, Magarwara, Distt. Unnao, Uttar Pradesh, PIN-20986216710Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4730
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5830
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1132
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 233
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 69
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · PMAY Policy by UP Government No. 1132 Dated 12.07.2018
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Reply of Objection for Registration of EWS, Gokuldhan under PMAY Project
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New7 Nov 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New14 Oct 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New15 Oct 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New14 Oct 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New14 Oct 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New14 Oct 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New14 Oct 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New14 Oct 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New14 Oct 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New14 Oct 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New14 Oct 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New14 Oct 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New14 Oct 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New15 Oct 2024 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q2.

QuarterConstructionCertificates
2024-Q13%CA ↗ · Arch ↗ · Eng ↗
2024-Q29%CA ↗ · Arch ↗ · Eng ↗
2024-Q317%CA ↗ · Arch ↗ · Eng ↗
2024-Q422%CA ↗ · Arch ↗ · Eng ↗
2025-Q132%CA ↗ · Arch ↗ · Eng ↗
2025-Q260%CA ↗ · Arch ↗ · Eng ↗
2025-Q366%CA ↗ · Arch ↗ · Eng ↗
2025-Q469%CA ↗ · Arch ↗ · Eng ↗
2026-Q171%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameTREADSTONE LIMITED
RolePromoter · current
RERA IDUPRERAPRM283711
PANAAACL2544H
CIN / TANU51210UP1987PLC009029
Name of chairmanKrishan Kumar Wadhwa
Registered address52/3,4,5 BLOCK T FACTORY AREA, FAZALGANJ, Kanpur, KANPUR, Uttar Pradesh, India, 208012
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameKRISHAN KUMAR WADHWA
RoleCo-promoter
Applicant typeIndividual
AddressC-33, Sarvodaya Nagar, Hans Nagar, Kanpur, Uttar Pradesh, PIN-208005
RERA contact
Legal nameTREADSTONE INTERNATIONAL LIMITED
RoleCo-promoter
Applicant typeCompany
AddressRegd. Office 52/3,4,5 BLOCK T FACTORY AREA FAZALGANJ , KANPUR, Uttar Pradesh, India - 208012 Site Office Gokuldham Project Magarwara Khasra no 1503,1504,1507 Unnao -209862
RERA contact

Nearby projects

Unnao

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Tread stone Limited Collection Account for EWS, Gokuldham under PMAYBankState Bank of IndiaBranchUnnaoBranch addressPannalal Park, Unnao, Uttar Pradesh, PIN-209801Branch districtUnnaoA/C no.IFSCSBIN0000200Branch emailsbi.00200@sbi.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Treadstone Limited Separate Bank Account for EWS, Gokuldham under PMAYBankState Bank of IndiaBranchUnnaoBranch addressPannalal Park, Unnao, Uttar Pradesh, PIN-209801Branch districtUnnao, Uttar PradeshA/C no.IFSCSBIN0000200
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Treadstone Limited RERA Transaction Account for EWS, Gokuldham under PMAYBankState Bank of IndiaBranchUnnaoBranch addressPannalal Park, Unnao, Uttar Pradesh, PIN-209801Branch districtUnnao, Uttar PradeshA/C no.IFSCSBIN0000200
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
21 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about EWS, Gokuldham under PMAY

Is EWS, Gokuldham under PMAY RERA registered?

Yes. EWS, Gokuldham under PMAY is registered with UPRERA under registration number UPRERAPRJ598095, registered on 2 Aug 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for EWS, Gokuldham under PMAY?

The completion date filed with UPRERA is 25 Dec 2026. No completion certificate is on record yet.

Who is the builder of EWS, Gokuldham under PMAY?

TREADSTONE LIMITED is the promoter entity that filed EWS, Gokuldham under PMAY with UPRERA (promoter RERA ID UPRERAPRM283711). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does EWS, Gokuldham under PMAY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is EWS, Gokuldham under PMAY located?

EWS, Gokuldham under PMAY is registered in Magarwara, Unnao, as filed with UPRERA.

What configurations are available in EWS, Gokuldham under PMAY?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in EWS, Gokuldham under PMAY?

The approved unit plan describes 5 blocks and 993 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is EWS, Gokuldham under PMAY?

About 240 units per acre: 993 planned units across 4.13 acres (16,710 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗