EWS/LIG Pintail Park City is a RERA-registered residential project by PINTAIL INFRACON LLP in Lucknow (RERA ID UPRERAPRJ707869). Registered with a completion deadline of 30 Sept 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ707869 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Oct 2022 |
| Project duration | 48 months |
| Address | Mohanlalganj, Lucknow |
| Tehsil | Mohanlalganj |
| Applicant type | Partnership Firm |
| Applicant address | G-40 Basement, Jangpura Extn Birbal Park, South Delhi, New Delhi, Delhi, India, 110014 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
EWS Housing/04100/LDA/BP/21-22/2344/25012022
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 3 Feb 2023 |
| Original completion | 30 Sept 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,08,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK385 53%
- 1 BHK340 47%
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 340 | 30 |
| 2 BHK | 385 | 38 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| TowerA · 1 BHK | 10 | 340 | 30 |
| TowerB · 2 BHK | 10 | 160 | 38 |
| TowerC · 2 BHK | 9 | 225 | 38 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Site is very demarcated at its location with constructed approach roads. |
| 2 | Boundary Wall Township Boundary exists. Project Boundary under construction alraedy completed upto 30 percent from one side of the project the same is to be completed in due cource of time, 2.5mt boundary wall is being constructed with RCC columns. |
| 3 | Road Work Internal roads of 6Mtr and External Roads are 9mtr to be constructed in the project along with path ways of 1.5mtr as per approved layout plan, 9mt wide RCC road (trimix) around the building block shall be constructed as per CPWD Specifications. |
| 4 | Footpaths The same will be developed as per approved Layout Plan the same will be developed according to the planning / foothpath shall be in CC or 50mn paver blocks along with the complete lenght of road. |
| 5 | Water Supply Including Drinking Water Facilities Drinking water storage will be built on the roof of building which will have supply from Integrated township main water supply line. Under grounf water shall be pumped to the Terrace tanks for domestic supply of water. Water to the units shall be through downcomer pipees as per detailed design. |
| 6 | Sewer System Underground sewer system to be built which will be connected to the township STP. All well desigen system of PVC pipes shall be laid around the building block. Final disposal shall be to the main sewer line. |
| 7 | Drain Underground drainage system will be connected to main drain line of township. All the surface drainage shall be connected to the township drain through well designed underground water drain system. |
| 8 | Parks Parks to be developed with grass cover and shurbs. Green shall be developed as per the approved area. Additional row of 4.5mt high plants shall be provided along boundary walls. |
| 9 | Tree Planting Tree plantation along side boundary / 4.5 to 6mt high trees along sides boundary wall shall be planted at the rate 5.0 mt c/c. |
| 10 | Design For Electric Supply Including Street Lighting Electric supply as per approved drawing to be in place and connected to township CSS/Supply to complex shall be through a separate transformer of designed capacity. |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Externale connecting sewer line to be connected to STP of township STP. Sewer system shall be connected to the main sewer line of the township which in turns connects to proper disposal system of LDA/Nagar Nigam. |
| 13 | Solid Waste Management And Disposal System To be connected to main township Solid Waste Management and Disposal System. A separate area to be marked within the complex for the collection of solid waste. Disposal shall be coordinated with Nagar Nigam Lucknow. |
| 14 | Water Conservation System Recharge pits at different locations to ensure water conervation. All the roof top water shall be collected and connected to the under ground recharge system. |
| 15 | Energy Management System Including Use of Renewable Energy Part of main township Pintail Park City. Roof top solar pannels and sola power street lights shall be provided. |
| 16 | Fire Protection And Fire Safety System Blocks have required no of stairs and open road all around. Extra water provision on terrace tanks. Provision for fire extinguishers. Provision for down commers with Hose reel. Fire extingusher and terrace tanks with required capacity have planned as per the NOC conditions of Fire Department. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Part of main township Pintail park City to be used by the residents. |
| 18 | Emergency Evacuation Services Block have required no of stairs and open roads all around. Building is well desigened with three stairs and fire lift for emergency evacuation and recue operations. |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 10 Apr 2027.
Sanctioned by Lucknow Development Authority · 20,569 sqm of land · an approved plan of 3 blocks and 725 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| EWS Housing/04100/LDA/BP/21-22/2344/25012022 | 11 Apr 2022 | 10 Apr 2027 | 10 Apr 2030 | 30 Sept 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 875, 876(P), 877, 885(P), 884, 879, 883, 882, 886(P) | 20569 | Khasra |
| Sale deed · 16717 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17416 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15238 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2997 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15243 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15245 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5745 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3221 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15241 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15225 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 13467 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 16342 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 22005 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17411 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5552 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · Consortium Agreement An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Consortium Agreement An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Consortium Agreement An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Consortium Agreement An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Consortium Agreement An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Revenue Sharing Agreement An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Name Change Letter of Pintail Builders LLP An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · NEC An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Not Applicable An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Not Applicable An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Undertaking of Dinesh An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Undertaking of Pintail Builders LLP An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 11 Jan 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 29 Oct 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 29 Oct 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 29 Oct 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Oct 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Oct 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 29 Oct 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 29 Oct 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 16 Jan 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 29 Oct 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 29 Oct 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 29 Oct 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 29 Oct 2022 ↗ |
Quarterly progress reports
15 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
15 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 32.33% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 41.33% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 49.65% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 54.68% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | PINTAIL INFRACON LLP |
| Role | Promoter · current |
| RERA ID | UPRERAPRM39580 |
| PAN | AATFP8087D |
| CIN / TAN | DELP25161D |
| Registered address | G-40 Basement, Jangpura Extn Birbal Park, South Delhi, New Delhi, Delhi, India, 110014 |
| RERA contact | |
| Registered since | 2018 |
| Legal name | SATYENDRA KUMAR |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 16/A/399, Pani Tanki, Vindavan Yojna, Lucknow , UP -226001 |
| RERA contact |
| Legal name | AJAY KUMAR |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 16/A/399, Pani Tanki, Vindavan Yojna, Lucknow , UP -226001 |
| RERA contact |
| Legal name | PINTAIL BUILDERS LLP |
| Role | Co-promoter |
| Applicant type | Partnership Firm |
| Address | G-40 BASEMENT JANGPURA EXTN BIRBAL PARK NEW DELHI Delhi 110014 |
| RERA contact |
| Legal name | PINTAIL PROJECTS LLP |
| Role | Co-promoter |
| Applicant type | Partnership Firm |
| Address | G-40 BASEMENT JANGPURA EXTN BIRBAL PARK NEW DELHI Delhi 110014 |
| RERA contact |
| Legal name | DINESH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 38, Gram Hardipur, Post - Sadar, Hardipur, Jaunpur, Uttar Pradesh-222001 |
| RERA contact |
| Legal name | PINTAIL REALTY DEVELOPERS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 149-A , 4TH FLOOR,, 205 RABINDRA SARANI,KOLKATA - 700007, West Bengal, INDIA |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Pintail Infracon LLP EWS LIG RERA Collection AccountBankICICI Bank LimitedBranchVishal KhandBranch addressVivek Khand, Gomti Nagar, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000214 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Pintail Infracon LLP EWS LIG RERA Separate AccountBankICICI BankBranchVishal KhandBranch addressVivek Khand, Gomti Nagar, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000214 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Pintail Infracon LLP EWS LIG RERA Transaction AccountBankICICI BankBranchVishal KhandBranch addressVivek Khand, Gomti Nagar, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000214 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about EWS/LIG Pintail Park City
Is EWS/LIG Pintail Park City RERA registered?
Yes. EWS/LIG Pintail Park City is registered with UPRERA under registration number UPRERAPRJ707869, registered on 3 Feb 2023. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for EWS/LIG Pintail Park City?
The completion date filed with UPRERA is 30 Sept 2026. No completion certificate is on record yet.
Who is the builder of EWS/LIG Pintail Park City?
PINTAIL INFRACON LLP is the promoter entity that filed EWS/LIG Pintail Park City with UPRERA (promoter RERA ID UPRERAPRM39580). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does EWS/LIG Pintail Park City have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is EWS/LIG Pintail Park City located?
EWS/LIG Pintail Park City is registered in Lucknow, as filed with UPRERA.
What configurations are available in EWS/LIG Pintail Park City?
The unit plan filed with UPRERA lists 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in EWS/LIG Pintail Park City?
The approved unit plan filed with UPRERA runs from 30 to 38 m² of carpet area (about 320 to 404 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in EWS/LIG Pintail Park City?
The approved unit plan describes 3 blocks and 725 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is EWS/LIG Pintail Park City?
About 143 units per acre: 725 planned units across 5.08 acres (20,569 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗