Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
32.33%Q3'25
41.33%Q4'25
49.65%Q1'26
54.68%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ707869
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Oct 2022
Project duration48 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typePartnership Firm
Applicant addressG-40 Basement, Jangpura Extn Birbal Park, South Delhi, New Delhi, Delhi, India, 110014
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    EWS Housing/04100/LDA/BP/21-22/2344/25012022

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Feb 2023
Original completion30 Sept 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,08,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors725 · 3 · 10 (units from plan)
  • 2 BHK385 53%
  • 1 BHK340 47%
ConfigurationUnitsCarpet area
1 BHK34030
2 BHK38538
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TowerA · 1 BHK1034030
TowerB · 2 BHK1016038
TowerC · 2 BHK922538
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Repunjay Kr. Patel
License CA/2001/28562
D-2/122, GF, Sambhav Tower, Vibhiti Khand, Gomti Nagar, Lucknow - 226010
Engineer
Irshad Ahmad
631/294, Patel Nagar Extn, Sec-9, Indira Nagar, Lucknow - 226016
Contractor
Construction by promoter itself
Pintail Infracon LLP, G-40 Basement, Jangpura Extn, Birbal Park, New Delhi - 110014
Sr.Development work declared to RERA
1Demarcation of Plots
Site is very demarcated at its location with constructed approach roads.
2Boundary Wall
Township Boundary exists. Project Boundary under construction alraedy completed upto 30 percent from one side of the project the same is to be completed in due cource of time, 2.5mt boundary wall is being constructed with RCC columns.
3Road Work
Internal roads of 6Mtr and External Roads are 9mtr to be constructed in the project along with path ways of 1.5mtr as per approved layout plan, 9mt wide RCC road (trimix) around the building block shall be constructed as per CPWD Specifications.
4Footpaths
The same will be developed as per approved Layout Plan the same will be developed according to the planning / foothpath shall be in CC or 50mn paver blocks along with the complete lenght of road.
5Water Supply Including Drinking Water Facilities
Drinking water storage will be built on the roof of building which will have supply from Integrated township main water supply line. Under grounf water shall be pumped to the Terrace tanks for domestic supply of water. Water to the units shall be through downcomer pipees as per detailed design.
6Sewer System
Underground sewer system to be built which will be connected to the township STP. All well desigen system of PVC pipes shall be laid around the building block. Final disposal shall be to the main sewer line.
7Drain
Underground drainage system will be connected to main drain line of township. All the surface drainage shall be connected to the township drain through well designed underground water drain system.
8Parks
Parks to be developed with grass cover and shurbs. Green shall be developed as per the approved area. Additional row of 4.5mt high plants shall be provided along boundary walls.
9Tree Planting
Tree plantation along side boundary / 4.5 to 6mt high trees along sides boundary wall shall be planted at the rate 5.0 mt c/c.
10Design For Electric Supply Including Street Lighting
Electric supply as per approved drawing to be in place and connected to township CSS/Supply to complex shall be through a separate transformer of designed capacity.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
Externale connecting sewer line to be connected to STP of township STP. Sewer system shall be connected to the main sewer line of the township which in turns connects to proper disposal system of LDA/Nagar Nigam.
13Solid Waste Management And Disposal System
To be connected to main township Solid Waste Management and Disposal System. A separate area to be marked within the complex for the collection of solid waste. Disposal shall be coordinated with Nagar Nigam Lucknow.
14Water Conservation System
Recharge pits at different locations to ensure water conervation. All the roof top water shall be collected and connected to the under ground recharge system.
15Energy Management System Including Use of Renewable Energy
Part of main township Pintail Park City. Roof top solar pannels and sola power street lights shall be provided.
16Fire Protection And Fire Safety System
Blocks have required no of stairs and open road all around. Extra water provision on terrace tanks. Provision for fire extinguishers. Provision for down commers with Hose reel. Fire extingusher and terrace tanks with required capacity have planned as per the NOC conditions of Fire Department.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Part of main township Pintail park City to be used by the residents.
18Emergency Evacuation Services
Block have required no of stairs and open roads all around. Building is well desigened with three stairs and fire lift for emergency evacuation and recue operations.
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Apr 2027.

Sanctioned by Lucknow Development Authority · 20,569 sqm of land · an approved plan of 3 blocks and 725 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
EWS Housing/04100/LDA/BP/21-22/2344/2501202211 Apr 202210 Apr 202710 Apr 203030 Sept 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
875, 876(P), 877, 885(P), 884, 879, 883, 882, 886(P)20569Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 16717
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 17416
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15238
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2997
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15243
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15245
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5745
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3221
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15241
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15225
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 13467
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 16342
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 22005
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 17411
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5552
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · Consortium Agreement
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Consortium Agreement
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Consortium Agreement
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Consortium Agreement
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Consortium Agreement
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Revenue Sharing Agreement
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Name Change Letter of Pintail Builders LLP
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · NEC
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Not Applicable
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Not Applicable
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Undertaking of Dinesh
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Undertaking of Pintail Builders LLP
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New11 Jan 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New29 Oct 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Oct 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New29 Oct 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Oct 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Oct 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Oct 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Oct 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New16 Jan 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New29 Oct 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New29 Oct 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Oct 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New29 Oct 2022 ↗

Quarterly progress reports

15 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

15 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2026-Q1.

QuarterConstructionCertificates
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q232.33%CA ↗ · Arch ↗ · Eng ↗
2025-Q341.33%CA ↗ · Arch ↗ · Eng ↗
2025-Q449.65%CA ↗ · Arch ↗ · Eng ↗
2026-Q154.68%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePINTAIL INFRACON LLP
RolePromoter · current
RERA IDUPRERAPRM39580
PANAATFP8087D
CIN / TANDELP25161D
Registered addressG-40 Basement, Jangpura Extn Birbal Park, South Delhi, New Delhi, Delhi, India, 110014
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameSATYENDRA KUMAR
RoleCo-promoter
Applicant typeIndividual
Address16/A/399, Pani Tanki, Vindavan Yojna, Lucknow , UP -226001
RERA contact
Legal nameAJAY KUMAR
RoleCo-promoter
Applicant typeIndividual
Address16/A/399, Pani Tanki, Vindavan Yojna, Lucknow , UP -226001
RERA contact
Legal namePINTAIL BUILDERS LLP
RoleCo-promoter
Applicant typePartnership Firm
AddressG-40 BASEMENT JANGPURA EXTN BIRBAL PARK NEW DELHI Delhi 110014
RERA contact
Legal namePINTAIL PROJECTS LLP
RoleCo-promoter
Applicant typePartnership Firm
AddressG-40 BASEMENT JANGPURA EXTN BIRBAL PARK NEW DELHI Delhi 110014
RERA contact
Legal nameDINESH
RoleCo-promoter
Applicant typeIndividual
Address38, Gram Hardipur, Post - Sadar, Hardipur, Jaunpur, Uttar Pradesh-222001
RERA contact
Legal namePINTAIL REALTY DEVELOPERS PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
Address149-A , 4TH FLOOR,, 205 RABINDRA SARANI,KOLKATA - 700007, West Bengal, INDIA
RERA contact

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Pintail Infracon LLP EWS LIG RERA Collection AccountBankICICI Bank LimitedBranchVishal KhandBranch addressVivek Khand, Gomti Nagar, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000214
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Pintail Infracon LLP EWS LIG RERA Separate AccountBankICICI BankBranchVishal KhandBranch addressVivek Khand, Gomti Nagar, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000214
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Pintail Infracon LLP EWS LIG RERA Transaction AccountBankICICI BankBranchVishal KhandBranch addressVivek Khand, Gomti Nagar, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000214
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about EWS/LIG Pintail Park City

Is EWS/LIG Pintail Park City RERA registered?

Yes. EWS/LIG Pintail Park City is registered with UPRERA under registration number UPRERAPRJ707869, registered on 3 Feb 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for EWS/LIG Pintail Park City?

The completion date filed with UPRERA is 30 Sept 2026. No completion certificate is on record yet.

Who is the builder of EWS/LIG Pintail Park City?

PINTAIL INFRACON LLP is the promoter entity that filed EWS/LIG Pintail Park City with UPRERA (promoter RERA ID UPRERAPRM39580). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does EWS/LIG Pintail Park City have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is EWS/LIG Pintail Park City located?

EWS/LIG Pintail Park City is registered in Lucknow, as filed with UPRERA.

What configurations are available in EWS/LIG Pintail Park City?

The unit plan filed with UPRERA lists 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in EWS/LIG Pintail Park City?

The approved unit plan filed with UPRERA runs from 30 to 38 m² of carpet area (about 320 to 404 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in EWS/LIG Pintail Park City?

The approved unit plan describes 3 blocks and 725 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is EWS/LIG Pintail Park City?

About 143 units per acre: 725 planned units across 5.08 acres (20,569 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗