Future estate (Phase-fe-1) is a RERA-registered residential project by FUTUREWORLD GREENHOMES PVT. LTD. in Gautam Budh Nagar (RERA ID UPRERAPRJ7361). Registered with a completion deadline of 31 Jul 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ7361 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 10 Jun 2015 |
| Original start | 10 Jun 2015 |
| Project duration | 134 months |
| Address | Plot No. GH16E, Sector-01, Greater Noida West, Uttar Pradesh, Gautam Buddha Nagar, Pin 201308, Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | M-6, S/F, Kalkaji South Delhi, New DELHI 110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- valid to
Permit revalidated
PLG/BP3281/FTS NO.3310
Building permit sanctioned
PLG/BP3281/FTS NO.3310
- to
Extension granted
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
- to
Extension granted
- to
Extension granted
Permit revalidated
PLG/2024/BP-3281/1130
Building permit sanctioned
PLG/2024/BP-3281/1130
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 14 Aug 2017 |
| Original completion | 31 Dec 2018 |
| Revised completion | 31 Jul 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹39,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK113 56%
- SHOP50 25%
- 3 BHK38 19%
- 1 BHK1 <1%
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 1 | 40 |
| 2 BHK | 113 | 56-60 |
| 3 BHK | 38 | 77-85 |
| SHOP | 50 | 3-25 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| COMMERCIAL · SHOP | 3 | 50 | 3-25 |
| TOWER-I · 1 BHK, 2 BHK, 3 BHK | 19 | 152 | 40-85 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot located in GROUP HOUSING ,Plot No. GH 16 E, Sector 1, Greater Noida ( West), Aimnabad, Greater Noida, Uttar Pradesh 201306 |
| 2 | Boundary Wall RCC Footing with Column supported boundary wall with Brickwork over it. |
| 3 | Road Work 6.0mtr. wide Road laid in 100mm VDF Flooring or Vacuum Dewatered Flooring or Tremix Flooring over PCC base. And Musical Notes on Driveway. |
| 4 | Footpaths Granite/Dholpur/any finishing items over PCC base 100mm thick. |
| 5 | Water Supply Including Drinking Water Facilities UG tank & Overhead tank will supply the water in household units . |
| 6 | Sewer System All the sewage is treated through STP and the treated water is used in lawn area. |
| 7 | Drain External drain has been laid for stormwater .PCC saucerdrain will be provided which is of very low maintenance. |
| 8 | Parks Parks has a lot of open space dedicated for children’s and senior citizen specially. A central green & Muscial theme Drum shape podium has been provided for aesthetic beauty. And Amphi/Meditation area,French Court & Tabla Shape Pavilion has been provided. |
| 9 | Tree Planting Trees like Tabebuia Argentea,Lagerstroemia & Flos Reginae etc. will be planted. |
| 10 | Design For Electric Supply Including Street Lighting LED light will be used for street lighting. |
| 11 | Community Buildings Club building has facilities of indoor games, gym, party hall and game zone etc. with Infinity Swimming Pool. With Regular In-Compound OPD. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Treated water from STP will be used in green areas. |
| 13 | Solid Waste Management And Disposal System STP of adequate capacity has been provided. |
| 14 | Water Conservation System Rain water harvesting pit has been provided for the recharge of ground water. |
| 15 | Energy Management System Including Use of Renewable Energy LED Lights will be used to reduce the energy consumption and electrical appliances with 5 star rating will be used in community building. |
| 16 | Fire Protection And Fire Safety System Sprinkler, Fire hydrant and Fire hose cabinet has been provided in case of fire emergency. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Indoor games, Gym,Swimming Pool,Yoga Centre,Basketball Court,Jogging Track,Separate Kids Pool and party hall has been provided in club building. |
| 18 | Emergency Evacuation Services Fire Exit and Fire Staircase has been provided for safety Evacuation of people. |
| 19 | Other Miscellaneous Work Gated Security,CCTV Monitoring,AC Business Lounge and Guitar Feature at Entrance. |
Permits & extensions
4 permits
An approval and the date it runs to - not proof the work matching it was done.
4 sanctioning permits are on record with UPRERA, the latest valid to 12 Mar 2029. 2 of them carry a revalidation, the latest valid to 12 Mar 2029.
Sanctioned by Greater Noida Authority · 6,800 sqm of land · an approved plan of 2 blocks and 202 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| PLG/BP3281/FTS NO.3310 | 10 Jun 2015 | 8 Jun 2020 | 8 Jun 2020 | 31 Mar 2021 | — | |
| PLG/BP3281/FTS NO.3310 | 10 Jun 2015 | 9 Jun 2020 | 31 Mar 2021 | 31 Mar 2021 | — | |
| PLG/BP3281/FTS NO.3310 | 10 Jun 2019 | 9 Jun 2024 | 9 Jun 2029 | 31 Jul 2026 | 10 Jun 2019 valid to 12 Mar 2029 | |
| PLG/2024/BP-3281/1130 | 13 Mar 2024 | 12 Mar 2029 | 9 Jun 2029 | 31 Jul 2026 | 13 Mar 2024 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 6 completion extensions for this project, the latest running to 31 Jul 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2018 | 31 Dec 2019 | — |
| 2 | 31 Dec 2019 | 30 May 2020 | — |
| 3 | 30 May 2020 | 29 Nov 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 4 | 29 Nov 2020 | 31 Mar 2021 | — |
| 5 | 31 Mar 2021 | 31 Jul 2025 | — |
| 6 | 31 Jul 2025 | 31 Jul 2026 | — |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 0 | 0 | — |
| 0 | 0 | — |
| GH16E | 32000 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 29 May 2013.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 12589 | 29 May 2013 | other | — |
| Lease deed · 12589 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 1 Dec 2019 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 24 Sept 2019 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 20 Aug 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 31 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 31 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 31 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 31 Jul 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 31 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | none |
| Fire safety (as filed with RERA) | None |
| Health service | none |
| Renewable energy | none |
| Other facilities | none |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
8 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
8 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ |
| 2020-Q2 | — | CA ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 59.3% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 61.37% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 71.97% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 76.29% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | FUTUREWORLD GREENHOMES PVT. LTD. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM427 |
| PAN | AABCF9943R |
| CIN / TAN | U70102DL2012PTC236350 |
| Name of chairman | Dipin Arora |
| Registered address | M-6, S/F, Kalkaji South Delhi, New DELHI 110092 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Futureworld Greenhomes Collection Account for Rhythm County UPRERAPRJ7361BankICICI Bank Ltd.BranchAIGIN ROYAL Greater NoidaBranch addressShop No. 2, 3 and 4 AIGIN Royal Plot No. GH16D, Sector-1, GB Nagar, Greater Noida UP 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0005974Branch emailcibnoida[at]icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Futureworld Greenhomes Separate Bank Account for Rhythm County UPRERAPRJ7361BankICICI Bank Ltd.BranchAIGIN ROYAL Greater NoidaBranch addressShop No. 2, 3 and 4 Plot No. GH16D, Sector-1, GB Nagar, Greater Noida, UP 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0005974Branch emailcibnoida[at]icicibank.com |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Futureworld Greenhomes RERA Transaction Account for Rhythm County UPRERAPRJ7361BankICICI Bank Ltd.BranchAIGIN ROYAL Greater NoidaBranch addressShop No. 2, 3 and 4 AIGIN Royal Plot No. GH16D, Sector-1, GB Nagar, Greater Noida UP 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0005974Branch emailcibnoida[at]icicibank.com |
What has changed on this record
17 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 254 (Under Registration - 1 ) → 255 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 254 (Under Registration - 2 ) → 254 (Under Registration - 1 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 253 (Under Registration - 1 ) → 254 (Under Registration - 2 ) changed in Estanzo’s record | 27 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 253 (Under Registration - 5 ) → 253 (Under Registration - 1 ) changed in Estanzo’s record | 23 Aug 2026 |
| Permit paperwork 4 · Project Specifications | Project Specifications newly filed with RERA | 23 Aug 2026 |
| Permit paperwork 4 · Floor Plan Of All Types | Floor Plan Of All Types newly filed with RERA | 23 Aug 2026 |
| Permit paperwork 4 · Approved Map | Approved Map newly filed with RERA | 23 Aug 2026 |
| Permit paperwork 4 · Sanctioned Letter | Sanctioned Letter newly filed with RERA | 23 Aug 2026 |
| Permit paperwork 4 · Approved Layout | Approved Layout newly filed with RERA | 23 Aug 2026 |
| Permit paperwork 3 · Project Specifications | Project Specifications newly filed with RERA | 23 Aug 2026 |
| Permit paperwork 3 · Floor Plan Of All Types | Floor Plan Of All Types newly filed with RERA | 23 Aug 2026 |
| Permit paperwork 3 · Approved Map | Approved Map newly filed with RERA | 23 Aug 2026 |
| Permit paperwork 3 · Sanctioned Letter | Sanctioned Letter newly filed with RERA | 23 Aug 2026 |
| Permit paperwork 3 · Approved Layout | Approved Layout newly filed with RERA | 23 Aug 2026 |
| Sanctioning permit no. 4 | PLG/2024/BP-3281/1130 newly filed with RERA | 23 Aug 2026 |
| Sanctioning permit no. 3 | PLG/BP3281/FTS NO.3310 newly filed with RERA | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 253 (Under Registration - 6 ) → 253 (Under Registration - 5 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 1 Oct 2026 · 5 movements on record |
Common questions about Future estate (Phase-fe-1)
Is Future estate (Phase-fe-1) RERA registered?
Yes. Future estate (Phase-fe-1) is registered with UPRERA under registration number UPRERAPRJ7361, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Future estate (Phase-fe-1)?
The completion date filed with UPRERA is 31 Jul 2026. No completion certificate is on record yet.
Who is the builder of Future estate (Phase-fe-1)?
FUTUREWORLD GREENHOMES PVT. LTD. is the promoter entity that filed Future estate (Phase-fe-1) with UPRERA (promoter RERA ID UPRERAPRM427). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Future estate (Phase-fe-1) more time to complete?
UPRERA's record carries 6 completion extensions for Future estate (Phase-fe-1), the latest running to 31 Jul 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Future estate (Phase-fe-1) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Future estate (Phase-fe-1) located?
Future estate (Phase-fe-1) is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Future estate (Phase-fe-1)?
The unit plan filed with UPRERA lists 1 BHK, 2 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Future estate (Phase-fe-1)?
The approved unit plan filed with UPRERA runs from 3 to 85 m² of carpet area (about 32 to 915 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Future estate (Phase-fe-1)?
The approved unit plan describes 2 blocks and 202 units of which 152 are homes and 50 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Future estate (Phase-fe-1)?
About 120 units per acre: 202 planned units across 1.68 acres (6,800 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗