Himalaya City Center Phase-2 is a RERA-registered commercial project by R B Infraestate Pvt. Ltd. in Ghaziabad (RERA ID UPRERAPRJ433171). Registered with a completion deadline of 17 Aug 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ433171 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Jul 2021 |
| Project duration | 50 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | 7365, Prem Nagar, Shakti Nagar, New Delhi-110007 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
413/2-5/M.P.-Zone-1/2020-21
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Aug 2021 |
| Original completion | 17 Aug 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,02,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- SHOP164 99%
- OTHER2 1%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 164 | 9-200 |
| OTHER | 2 | 632-710 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · SHOP, OTHER | 5 | 166 | 9-200 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots NA |
| 2 | Boundary Wall 1800 mm high, along entire periphery in brick massonary with FPS bricks of class designation in 75 in ratio of 16 cement mortar on RCC footing and column structure |
| 3 | Road Work Interlocking Pavers/Trimix with proper longitudinal and cross sectional road slopes in well compacted subgrade of adequate layers of sand |
| 4 | Footpaths Interlocking Pavers/Chequered Tiles over well compacted subgrade of adequate layers of sand |
| 5 | Water Supply Including Drinking Water Facilities One Under Ground Tank of 180 KLD with water supply lines from underground tank to individual units as per MEP drawings |
| 6 | Sewer System Underground system using uPVC (SN-4) pipes and making of circular manholes or rectangular manhole with proper finished formation level as per MEP drawings |
| 7 | Drain Underground system using uPVC (SN-4) sewer pipes for storm water drainage with circular or rectangular manholes with finished formation as per MEP drawings |
| 8 | Parks Parks having total area of 1105 sq. m. shall be provided with requisite landscaping as per landscaping drawings |
| 9 | Tree Planting 110 nos. of trees are to be planted out of that 50 per cent will be evergreen tree to be planted at places as per landscaping drawings |
| 10 | Design For Electric Supply Including Street Lighting Three Electricity Transformers of 1500 KVA capacity each shall be used along with necessary stitch gear for distributing electricity at LT voltage/ as per requirement and with the provisions of required capacity of transformers as per UPPCL guidelines |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP of capacity 150 KLD shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer as per MEP drawings |
| 13 | Solid Waste Management And Disposal System Treated water shall be used for Manual collection and organic waste convertor shall be provided in the project |
| 14 | Water Conservation System Rain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible as per MEP drawings |
| 15 | Energy Management System Including Use of Renewable Energy Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchase from the grid/ power supply company |
| 16 | Fire Protection And Fire Safety System Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and water storage tanks shall be provided as per NBC and NOC from the department |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services Staircases shall be provided in Basement and all the Towers for fire/emergency exit as per norms |
| 19 | Other Miscellaneous Work NA |
Registered agents
2 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | KARTIK INFRATOWN PRIVATE LIMITED | UPRERAAGT10413 |
| 2 | Trisol RED Infraventures Pvt Ltd | UPRERAAGT11579 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 17 Aug 2025.
Sanctioned by Ghaziabad Development Authority · 9,159 sqm of land · an approved plan of 1 block and 166 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 413/2-5/M.P.-Zone-1/2020-21 | 27 Nov 2020 | 17 Aug 2025 | 17 Aug 2028 | 17 Aug 2025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 524 | 7962.66 | Khasra |
| 540 | 1105 | Khasra |
| 544 | 360.61 | Khasra |
| Registry document · 6665 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4175 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8193 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Land Area Reconciliation An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Section 143 Order under UPZLAR Act for Khasra No. 524 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Additional Affidavit for Applied Land Area An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Section 143 Order under UPZLAR Act for Khasra No. 544 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 18 Aug 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 21 Jul 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 21 Jul 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 21 Jul 2021 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 21 Jul 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 21 Jul 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 21 Jul 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 21 Jul 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 Jul 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 18 Aug 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 21 Jul 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 21 Jul 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 21 Jul 2021 ↗ |
Quarterly progress reports
17 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
17 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2025-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 85.54% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | R B Infraestate Pvt. Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM128369 |
| PAN | AAFCR2180L |
| CIN / TAN | DELR19187A |
| Name of chairman | Dinesh Chand Sharma |
| Registered address | 7365, Prem Nagar, Shakti Nagar, New Delhi-110007 |
| RERA contact | |
| Registered since | 2020 |
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | RB INFRAESTATE PVT. LTD. HCC PH-II RERA ACBankAXIS BANKBranchRAJ NAGAR EXTENSION BRANCHA/C no.IFSCUTIB0004428 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 2 (Under Registration - 1 ) → 2 (Under Registration - 0 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 9 Sept 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Himalaya City Center Phase-2
Is Himalaya City Center Phase-2 RERA registered?
Yes. Himalaya City Center Phase-2 is registered with UPRERA under registration number UPRERAPRJ433171, registered on 28 Aug 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Himalaya City Center Phase-2?
The completion date filed with UPRERA is 17 Aug 2025. No completion certificate is on record yet.
Who is the builder of Himalaya City Center Phase-2?
R B Infraestate Pvt. Ltd. is the promoter entity that filed Himalaya City Center Phase-2 with UPRERA (promoter RERA ID UPRERAPRM128369). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Himalaya City Center Phase-2 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Himalaya City Center Phase-2 located?
Himalaya City Center Phase-2 is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in Himalaya City Center Phase-2?
The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Himalaya City Center Phase-2?
The approved unit plan filed with UPRERA runs from 9 to 710 m² of carpet area (about 96 to 7,642 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Himalaya City Center Phase-2?
The approved unit plan describes 1 block and 166 units of which 2 are homes and 164 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Himalaya City Center Phase-2?
About 73 units per acre: 166 planned units across 2.26 acres (9,159 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗