I N@XT is a RERA-registered residential project by CEREBRUM BUSINESS PARK PVT. LTD in Gautam Budh Nagar (RERA ID UPRERAPRJ14516). RERA status: Abeyance. Data as reported by UP-RERA. as reported by UPRERA
RERA status as reported: Abeyance.Basic details
Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ14516 |
| Project category | Residential |
| Registration type | New |
| RERA status | AbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary |
| Proposed start | 1 Dec 2017 |
| Project duration | 78 |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Coordinates | 28.592222222222222, 77.43777777777778 |
| Applicant type | Company |
| Applicant address | B 21,22, Sector 16, Noida, Pin 201301 |
| Applicant contact | 9958482424 · cerebrum.rera@gmail.com |
Registration & timeline
Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.
| RERA registered | 1 Dec 2017 |
| Promised completion | 30 Nov 2023 |
| Revised completion | 29 May 2024 |
| Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹32,500 |
Project team & development works
The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.
Permits & extensions
0 permits
A permit shows an approval and the date it runs to, not that work matching it has been done.
5,500 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Document | File |
|---|---|
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 29 May 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Nov 2023 | 29 May 2024 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
6 filings
What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| NIL | 100030.31 | — |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 28 Jan 2013.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 12455 | 28 Jan 2013 | self | — |
| NIL | 21 Aug 2017 | other | — |
| Document | Status | Uploaded |
|---|---|---|
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 1 Dec 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 1 Dec 2017 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 1 Dec 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 1 Dec 2017 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 1 Dec 2017 ↗ |
Facilities
as declared to RERA
What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | a) Potable water supply to Restaurant(s) and at common areas on chargeable basis. b) Overhead storage tanks. c) Water treatment/filtration system. d) Portable drinking water supply at single point one each floor for Allottee(s) / Occupier(s). |
| Fire safety (as filed with RERA) | a) Sprinkler system. b) Hydrants with hose real. c) Smoke detectors connected to central fire panel. |
| Health service | To be decided |
| Renewable energy | Solar Energy & Rainwater Harvesting to be used in our project |
| Other facilities | For future |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Data as reported by UPRERAPromoter (SPV) details
The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.
| Legal name | CEREBRUM BUSINESS PARK PVT. LTD |
| Role | primary · current |
| RERA ID | UPRERAPRM30943 |
| PAN | AANCA8632Q |
| CIN / TAN | U70102DL2015PTC286856 |
| Name of chairman | Manoj Kumar Chaudhary Kamal Aggarwal |
| Registered address | B 21,22, Sector 16, Noida, Pin 201301 |
| RERA contact | cerebrum.rera@gmail.com · 9958482424 |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | AIRWIL IT PARK PVT LTDBankHDFCBranchNOIDA SECTOR 16A/C no.50200011761355IFSCHDFC0001351 |
What has changed on this record
nothing recorded yet
A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
3 not published
These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.
- No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about I N@XT
Is I N@XT RERA registered?
Yes. I N@XT is registered with UPRERA under registration number UPRERAPRJ14516, registered on 1 Dec 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for I N@XT?
The completion date filed with UPRERA is 29 May 2024. No completion certificate is on record yet.
Who is the builder of I N@XT?
CEREBRUM BUSINESS PARK PVT. LTD is the promoter entity that filed I N@XT with UPRERA (promoter RERA ID UPRERAPRM30943). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted I N@XT more time to complete?
UPRERA's record carries 1 completion extension for I N@XT, the latest running to 29 May 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does I N@XT have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is I N@XT located?
I N@XT is registered in Gautam Budh Nagar, as filed with UPRERA.
Data as reported by UPRERA, as of 17 Aug 2026. official source ↗